Investigating Key Performance Measures and Predictions on Unsealed Roads: Road Deterioration and Works Effects Models
Austroads has released a report that details roughness measurements conducted on a panel of unsealed roads at both the pre- and post-works effect (WE) treatment stages to develop interim WE models and validate existing models. This report is available for no fee after logging on to the site.
This Summary Last Modified On: 2/23/2015