Laboratory Investigation of Grouted Coupler Connection Details for Accelerated Bridge Construction Projects
The Institute for Transportation at Iowa State University has released a report that evaluates the grouted coupler connection details utilized on precast concrete elements on one of Iowa’s bridges.
This Summary Last Modified On: 9/22/2015