Procedures and Guidelines for Validating Contractor Test Data
In the development of a quality assurance program, a state highway agency (SHA)
incorporates policies and procedures for assessing how well the materials and construction
used by a contractor on a construction project satisfy the agency's specifications.
The TRB National Cooperative Highway Research Program's
NCHRP Research Report 946: Procedures and Guidelines for Validating Contractor Test Data
reviews and evaluates the procedures and practices used in the acceptance of construction materials.
The report also proposes a
related practice for incorporation into AASHTO Standard Specifications for Transportation
Materials and Methods of Sampling and Testing.
Supplemental files to the report include Appendices A through E, available as a single PDF file,
a State Highway Agency Survey (Appendix A), Survey Responses (Appendix B), Numerical Simulations (Appendix C),
State Highway Agency Date Analysis (Appendix D), and Statistical Tables (Appendix E).
This Summary Last Modified On: 5/24/2020