Fatigue Loading and Design Methodology for High-Mast Lighting TowersMay 15, 2012 TRB’s National Cooperative Highway Research Program (NCHRP) Report 718: Fatigue Loading and Design Methodology for High-Mast Lighting Towers provides criteria for the fatigue design of high-mast lighting towers. The report also includes a series of proposed revisions with associated commentary to the fatigue design provisions of the American Association of State Highway and Transportation Offic...
|
|
|
Instrumentation of the Maumee River CrossingApril 30, 2012 The Ohio Department of Transportation has released a report that explores the instrumentation, monitoring, and testing of the main span unit of one of Ohio’s first long-span, cable-stayed bridges.
|
|
Vehicle Fires in Norwegian Road Tunnels 2008-2011April 25, 2012 The Institute of Transport Economics Norwegian Centre for Transport Research has released a report that describes the characteristics of fires and smoke without fire in Norwegian road tunnels during the last four years.
|
|
Long-Term Bridge Performance Committee Letter Report: March 16, 2012April 10, 2012 On March 16, 2012, TRB’s Long-Term Bridge Performance (LTBP) Committee sent its first letter report to Victor Mendez, administrator of the Federal Highway Administration (FHWA). The committee provides advice and assistance on the conduct of the LTBP program, which is designed to collect research-quality data on a large representative sample of in-service U.S. highway bridges and to analyze thes...
|
Seismic Design of Geosynthetic-Reinforced Soil Bridge Abutments with Modular Block FacingApril 5, 2012 TRB’s National Cooperative Highway Research Program (NCHRP) Web-Only Document 187: Seismic Design of Geosynthetic-Reinforced Soil Bridge Abutments with Modular Block Facing explores design methods and construction guidelines for using geosynthetic-reinforced soil (GRS) systems in bridge abutments in seismically active regions. The report focuses on single-span, simply-supported bridges subjecte...
|
|