| NCHRP 01-25(1) | Effects of Heavy Vehicle Characteristics on Pavement Response and Performance---Phase II | Completed | |
| NCHRP 01-27 | Video Image Processing for Evaluating Pavement Surface Distress | Completed | |
| NCHRP 01-28 | Laboratory Determination of Resilient Modulus for Flexible Pavement Design | Completed | |
| NCHRP 01-28A | Harmonized Test Methods for Laboratory Determination of Resilient Modulus for Flexible Pavement Design | Completed | |
| NCHRP 01-29 | Improved Surface Drainage of Pavements | Completed | |
| NCHRP 01-30 | Support Under Portland Cement Concrete Pavements | Completed | |
| NCHRP 01-31 | Smoothness Specifications for Pavements | Completed | |
| NCHRP 01-32 | Systems for Design of Highway Pavements | Completed | |
| NCHRP 01-33 | Methodology to Improve Pavement-Investment Decisions | Completed | |
| NCHRP 01-34 | Performance of Subsurface Pavement Drainage | Completed | |
| NCHRP 01-34A | Contributions of Pavement Structural Layers to Rutting of Flexible Pavements | Completed | |
| NCHRP 01-34B | Effectiveness of Subsurface Drainage for HMA and PCC Pavements | Completed | |
| NCHRP 01-34C | Effects of Subsurface Drainage on Performance of Asphalt and Concrete Pavements | Completed | |
| NCHRP 01-34D | Effects of Subsurface Drainage on Performance of Asphalt and Concrete Pavements: Further Evaluation and Analysis of LTPP SPS-1 and SPS-2 Field Sections | Completed | |
| NCHRP 01-35A | Guide for Pavement Management | Completed | |
| NCHRP 01-36 | Determination of Pavement Damage from Super-Single and Singled-Out Dual Truck Tires | Completed | |
| NCHRP 01-37 | Development of the 2002 Guide for the Design of New and Rehabilitated Pavement Structures | Completed | |
| NCHRP 01-37A | Development of the 2002 Guide for the Design of New and Rehabilitated Pavement Structures: Phase II | Completed | |
| NCHRP 01-37A(01) | Distribution Plan for the Recommended Mechanistic-Empirical Pavement Guide and Software | Completed | |
| NCHRP 01-38 | Guide on Pavement Rehabilitation Strategies | Completed | |
| NCHRP 01-39 | Traffic Data Collection, Analysis, and Forecasting for Mechanistic Pavement Design | Completed | |
| NCHRP 01-40 | Facilitating the Implementation of the Guide for the Design of New and Rehabilitated Pavement Structures | Active | |
| NCHRP 01-40A | Independent Review of the Recommended Mechanistic-Empirical Design Guide and Software | Completed | |
| NCHRP 01-40B | User Manual and Local Calibration Guide for the Mechanistic-Empirical Pavement Design Guide and Software | Active | |
| NCHRP 01-40D(01) | Technical Assistance to NCHRP and NCHRP Project 1-40A: Versions 0.9 and 1.0 of the M-E Pavement Design Software | Active | |
| NCHRP 01-40D(02) | Technical Assistance to NCHRP and NCHRP Project 1-40A: Versions 0.9 and 1.0 of the M-E Pavement Design Software | Active | |
| NCHRP 01-41 | Models for Predicting Reflection Cracking of Hot-Mix Asphalt Overlays | Active | |
| NCHRP 01-42 | Top-Down Fatigue Cracking of Hot-Mix Asphalt Layers - Phase I | Completed | |
| NCHRP 01-42A | Models for Predicting Top-Down Cracking of Hot-Mix Asphalt Layers | Active | |
| NCHRP 01-43 | Guide for Pavement Friction | Active | |
| NCHRP 01-44 | Measuring Tire-Pavement Noise at the Source | Active | |
| NCHRP 01-45 | Models for Estimating the Effects of Pavement Condition on Vehicle Operating Costs | Active | |
| NCHRP 01-46 | Development of an AASHTO Pavement Handbook | Anticipated | In development |
| NCHRP 02-14 | Public/Private Partnerships for Financing Highway Improvements | Completed | |
| NCHRP 02-15 | Identifying Measuring, and Evaluating the Benefits of Safety Roadside Rest Areas | Completed | |
| NCHRP 02-16 | Relationships Between Vehicle Configurations and Highway Design | Completed | |
| NCHRP 02-17(1) | Methodologies for Evaluating the Effects of Transportation Policies on the Economy | Completed | |
| NCHRP 02-17(2) | Workshop on Research Needs in Transportation and Economic Development | Completed | |
| NCHRP 02-17(3) | Macroeconomic Analysis of the Linkages Between Transportation Investments and Economic Performance | Completed | |
| NCHRP 02-17(3)A | Update and Enhancement of Dataset for Macroeconomic Analysis of Transportation Investments and Economic Performance | Completed | |
| NCHRP 02-17(4) | Measuring the Relationship Between Freight Transportation Services and Industry Productivity | Completed | |
| NCHRP 02-17(5) | Impact of Urban Congestion on Business | Completed | |
| NCHRP 02-17(6) | Tourism Travel Contributions to Economic Development | Completed | |
| NCHRP 02-18 | Research Strategies for Improving Highway User Cost-Estimating Methodologies | Completed | |
| NCHRP 02-18(2) | Valuation of Travel-Time Savings and Predictability in Congested Conditions for Highway User-Cost Estimation | Completed | |
| NCHRP 02-18(3) | Development of an Innovative Highway User-Cost Estimation Procedure | Completed | |
| NCHRP 02-18(4) | Development and Demonstration of StratBENCOST Procedure | Completed | |
| NCHRP 02-19 | Research on the Relationship Between Economic Development and Transportation Investment | Completed | |
| NCHRP 02-19(2) | Guidance on Using Existing Analytic Tools for Evaluating Transportation Investments | Active | |
| NCHRP 02-20 | Economic Trends and Multimodal Transportation Requirements | Completed | |
| NCHRP 02-21 | Economic Implications of Congestion | Completed | |
| NCHRP 02-22 | Needs in Communicating the Economic Impacts of Transportation Investment | Completed | |
| NCHRP 02-22(2) | Case Studies on Communicating the Economic Benefits of Transportation Investments | Active | |
| NCHRP 02-23 | Development of an Update to the 1977 AASHTO Redbook | Completed | |
| NCHRP 03-28 | Effects of Quality of Traffic Signal Progression on Delay | Completed | |
| NCHRP 03-32 | Temporary Pavement Markings for Work Zones | Completed | |
| NCHRP 03-33 | Capacity and Level-of-Service Procedures for Multilane Rural and Suburban Highways | Completed | |
| NCHRP 03-35 | Speed-Change Lanes | Completed | |
| NCHRP 03-36 | Development of a Low-Cost Bridge Weigh-In-Motion System | Completed | |
| NCHRP 03-37 | Capacity and Level of Service at Ramp-Freeway Junctions | Completed | |
| NCHRP 03-37(2) | Capacity and Level of Service at Ramp-Freeway Junctions (Phase II) | Completed | |
| NCHRP 03-38(1) | Assessment of Advanced Technologies for Relieving Urban Traffic Congestion | Completed | |
| NCHRP 03-38(1)A | A Study to Assess Advanced Vehicle and Highway Technologies | Completed | |
| NCHRP 03-38(2) | Travel Characteristics of Large-Scale Suburban Activity Centers | Completed | |
| NCHRP 03-38(3) | Traffic Adaptive Control (Phase 1)---Critical Intersection Control Strategies; (Phase 2)---OPAC Control Strategies | Completed | |
| NCHRP 03-38(4) | Traffic Signal Control for Saturated Conditions | Completed | |
| NCHRP 03-38(5) | Effective Utilization of Street Width | Completed | |
| NCHRP 03-38(6) | Cost Sharing for Transportation Improvements Near Major Suburban Employment Centers | Completed | |
| NCHRP 03-38(7) | Access Management Policies and Guidelines for Activity Centers | Completed | |
| NCHRP 03-39 | Evaluation and Calibration Procedures for Weigh-In-Motion Systems | Completed | |
| NCHRP 03-39(2) | On-Site Evaluation and Calibration Procedures for Weigh-In-Motion Systems | Completed | |
| NCHRP 03-40 | Single Point Urban Interchange Design and Operations Analysis | Completed | |
| NCHRP 03-41 | Procedure for Determining Work Zone Speed Limits | Completed | |
| NCHRP 03-41(2) | Effectiveness and Implementability of Procedures for Work Zone Speed Limits | Completed | |
| NCHRP 03-42 | Determination of Stopping Sight Distances | Completed | |
| NCHRP 03-43 | Use of Shoulders and Narrow Lanes to Increase Freeway Capacity | Completed | |
| NCHRP 03-44 | Improved Traffic Control Device Design and Placement to Aid the Older Driver | Completed | |
| NCHRP 03-45 | Speed-Flow Relationships for Basic Freeway Segments | Completed | |
| NCHRP 03-46 | Capacity and Level of Service at Unsignalized Intersections | Completed | |
| NCHRP 03-47 | Capacity Analysis of Interchange Ramp Terminals | Completed | |
| NCHRP 03-48 | Capacity Analysis for Actuated Intersections | Completed | |
| NCHRP 03-49 | Capacity and Operational Effects of Midblock Left-Turn Lanes | Completed | |
| NCHRP 03-50 | Driver Information Overload | Completed | |
| NCHRP 03-50(2) | Additional Investigations on Driver Information Overload | Completed | |
| NCHRP 03-51 | Communications Mediums for Signal, IVHS, and Freeway Surveillance Systems | Completed | |
| NCHRP 03-52 | Impacts of Access-Management Techniques | Completed | |
| NCHRP 03-52A | Impacts of Access-Management Techniques | Completed | |
| NCHRP 03-53 | Development of a HOV Systems Manual | Completed | |
| NCHRP 03-54 | Uniform Traffic Signal Displays for Protected/Permissive Left Turn Control | Completed | |
| NCHRP 03-54(2) | Evaluation of Traffic Signal Displays for Protected/Permissive Left Turn Control | Completed | |
| NCHRP 03-55 | A Highway Capacity Manual for the Year 2000 | Completed | |
| NCHRP 03-55(2) | Techniques to Estimate Speeds and Service Volumes for Planning Applications | Completed | |
| NCHRP 03-55(2)A | Planning Applications for the Year 2000 Highway Capacity Manual | Completed | |
| NCHRP 03-55(3) | Capacity and Quality of Service for Two-Lane Highways | Completed | |
| NCHRP 03-55(4) | Performance Measures and Levels of Service in the Year 2000 Highway Capacity Manual | Completed | |
| NCHRP 03-55(5) | Capacity and Quality of Service of Weaving Areas | Completed | |
| NCHRP 03-55(6) | Production of the Year 2000 Highway Capacity Manual | Completed | |
| NCHRP 03-56 | Systemwide Impact of Safety and Traffic Operation Design Decisions for Resurfacing, Restoration, or Rehabilitation (RRR) Projects | Completed | |
| NCHRP 03-57 | Recommended Traffic-Control Devices for Railroad-Highway Grade Crossings | Completed | |
| NCHRP 03-58 | Assessing Traffic Control Signal Installations Using Capacity Analysis and Simulation | Completed | |
| NCHRP 03-59 | Assessment of Variable Speed Limit Implementation Issues | Active | |
| NCHRP 03-60 | Capacity and Quality of Service of Interchange Ramp Terminals | Active | |
| NCHRP 03-60A | Validation and Enhancement of the Highway Capacity Manual’s Interchange Ramp Terminal Methodology | Active | |
| NCHRP 03-61 | Communicating Changes in Horizontal Alignment | Completed | |
| NCHRP 03-62 | Guidelines for Accessible Pedestrian Signals | Active | |
| NCHRP 03-63 | Assessment of Sharing Information Between Public Safety and Transportation Agencies for Traffic-Incident Management | Completed | |
| NCHRP 03-64 | Highway Capacity Manual Applications Guide | Completed | |
| NCHRP 03-65 | Applying Roundabouts in the United States | Active | |
| NCHRP 03-65A | Update of 'Roundabouts: An Informational Guide' | Active | |
| NCHRP 03-66 | Traffic Signal State Transition Logic Using Enhanced Sensor Information | Active | |
| NCHRP 03-67 | Expert System for Recommending Speed Limits in Speed Zones | Completed | |
| NCHRP 03-68 | Guide to Effective Freeway Performance Measurement | Completed | |
| NCHRP 03-69 | Design of Construction Work Zones on High-Speed Highways | Completed | |
| NCHRP 03-70 | Multimodal Level of Service Analysis For Urban Streets | Active | |
| NCHRP 03-71 | Innovative Pedestrian Treatments at Unsignalized Crossings | Completed | |
| NCHRP 03-72 | Lane Widths, Channelized Right Turns, and Right-Turn Deceleration Lanes in Urban and Suburban Areas | Active | |
| NCHRP 03-73 | Separation of Vehicles - CMV Only Lanes | Active | |
| NCHRP 03-74 | Guidelines for Selection of Speed Reduction Treatments at High-Speed Intersections | Completed | |
| NCHRP 03-75 | Analysis of Freeway Weaving Sections | Active | |
| NCHRP 03-76A | Highway Traffic Signal Warrant For Intersections Near Highway-Rail Grade Crossings | Active | |
| NCHRP 03-76B | Low-Cost Active Warning Systems for Highway-Rail Grade Crossings | Active | |
| NCHRP 03-77 | Guide to Contracting Intelligent Transportation System Projects | Completed | |
| NCHRP 03-78 | Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities | Completed | |
| NCHRP 03-78A | Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities | Active | |
| NCHRP 03-79 | Measuring and Predicting the Performance of Automobile Traffic on Urban Streets | Active | |
| NCHRP 03-80 | Traffic Enforcement Strategies for Work Zones | Active | |
| NCHRP 03-81 | Strategies for Integrated Operation of Freeway and Arterial Corridors | Active | |
| NCHRP 03-82 | Default Values for Capacity and Quality of Service Analyses | Completed | Published as NCHRP Report 599 |
| NCHRP 03-83 | Low-Cost Improvements for Recurring Freeway Bottlenecks | Active | |
| NCHRP 03-84 | Guide for Multistate Transportation Operations Programs | Active | |
| NCHRP 03-85 | Guidance for the Use of Alternative Traffic Analysis Tools in Highway Capacity Analyses | Active | |
| NCHRP 03-86 | Traffic Operations Management and Planning Process | Anticipated | |
| NCHRP 03-87 | Proactive Ramp Management Under the Threat of Freeway-Flow Breakdown | Active | |
| NCHRP 03-88 | Guidelines for Ramp and Interchange Spacing | Pending | |
| NCHRP 03-89 | Design Guidance for Channelized Right-Turn Lanes | Pending | |
| NCHRP 03-90 | Operation of Traffic Signal Systems in Oversaturated Conditions | Pending | |
| NCHRP 03-91 | Left-Turn Accommodations at Unsignalized Intersections | Pending | |
| NCHRP 03-92 | Production of the Year 2010 Highway Capacity Manual | Active | |
| NCHRP 03-93 | Automated Enforcement for Speeding and Red Light Running | Pending | |
| NCHRP 04-15 | Corrosion Protection of Prestressing Systems in Concrete Bridges | Completed | |
| NCHRP 04-16 | Cost and Service Life of Pavement Markings | Completed | |
| NCHRP 04-18 | Design and Evaluation of Large Stone Mixtures | Completed | |
| NCHRP 04-19 | Aggregate Tests Related to Asphalt Concrete Performance in Pavements | Completed | |
| NCHRP 04-19(2) | Validation of Performance-Related Tests of Aggregates for Use in Hot-Mix Asphalt Pavements | Completed | |
| NCHRP 04-20 | Aggregate Tests Related to Performance of Portland Cement Concrete | Completed | |
| NCHRP 04-20A | State of the Art Report and Plan for Research on Aggregates Tests Related to Performance of Portland Cement Concrete Pavements | Completed | |
| NCHRP 04-20B | Aggregate Tests Related to Performance of Portland Cement Concrete Pavements | Completed | |
| NCHRP 04-20C | Aggregate Tests Related to Performance of Portland Cement Concrete Pavements: State of the Knowledge | Completed | |
| NCHRP 04-21 | Appropriate Use of Waste and Recycled Materials in the Transportation Industry | Completed | |
| NCHRP 04-22 | Pavement-Marking Materials: Health, Environmental, and Performance Assessment | Completed | |
| NCHRP 04-23 | Performance-Related Tests of Aggregates for Use in Unbound Pavement Layers | Completed | |
| NCHRP 04-24 | HDPE Pipe Material Specifications and Design Requirements | Completed | |
| NCHRP 04-25 | Implementation Plan for Automating Highway-Materials Testing | Completed | |
| NCHRP 04-26 | Thermoplastic Drainage Pipe, Design and Testing | Active | |
| NCHRP 04-27 | Application of Fiber Reinforced Polymer (FRP) Composites to the Highway Infrastructure: Strategic Plan | Completed | |
| NCHRP 04-28 | Feasibility Study for an All-White Pavement Marking System | Completed | |
| NCHRP 04-29 | Selection of Materials to Optimize Sign Performance | Completed | |
| NCHRP 04-30 | Test Methods for Characterizing Aggregate Shape, Texture, and Angularity | Completed | |
| NCHRP 04-30A | Test Methods for Characterizing Aggregate Shape, Texture, and Angularity | Completed | |
| NCHRP 04-31 | Tests of Recycled Aggregates for Use in Unbound Pavement Layers | Completed | |
| NCHRP 04-32 | Performance and Quality Control of Corrugated Pipe Manufactured with Recycled Polyethylene Content | Active | |
| NCHRP 04-33 | Procedures for Testing and Evaluating Detectable Warning Systems | Active | |
| NCHRP 04-34 | Application of LADAR in the Analysis of Aggregate Characteristics | Active | |
| NCHRP 04-35 | Improved Test Methods for Specific Gravity and Absorption of Coarse and Fine Aggregate | Active | |
| NCHRP 05-10 | A Mobile System for Measuring Retroreflectance of Traffic Signs | Completed | |
| NCHRP 05-11 | Implementation Strategies for Sign Retroreflectivity Standards | Completed | |
| NCHRP 05-12 | Requirements for Application of Light Emitting Diodes (LEDs) to Traffic Control Signals | Completed | |
| NCHRP 05-13 | Illumination Guidelines for Nighttime Highway Work | Completed | |
| NCHRP 05-13(2) | Illumination Guidelines for Nighttime Highway Work | Completed | |
| NCHRP 05-14 | Advance Warning Arrow Panel Visibility | Completed | |
| NCHRP 05-15 | Visibility Performance Requirements for Vehicular Traffic Signals | Completed | |
| NCHRP 05-16 | National Calibration Standards for Measuring Retroreflectivity | Completed | |
| NCHRP 05-17 | Safety Evaluation of Permanent Raised Pavement Markers | Completed | |
| NCHRP 05-18 | Color Effectiveness of Yellow Pavement Marking Materials | Completed | |
| NCHRP 05-19 | Guidelines for Roadway Lighting Based on Safety Benefits and Costs | Active | |
| NCHRP 06-12 | Improved Visibility for Snow Plowing Operations | Completed | |
| NCHRP 06-13 | Guidelines for Snow and Ice Control Materials and Methods | Completed | |
| NCHRP 06-14 | Feasibility of Using Friction Indicators to Improve Winter Maintenance Operations and Mobility | Completed | |
| NCHRP 06-15 | Testing and Calibration Methods for RWIS Sensors | Completed | |
| NCHRP 06-16 | Guidelines for the Selection of Snow and Ice Control Materials To Mitigate Environmental Impacts | Completed | |
| NCHRP 06-17 | Performance Measures for Snow and Ice Control Operations | Active | |
| NCHRP 07-12 | Microcomputer Evaluation of Highway User Benefits | Completed | |
| NCHRP 07-12(2) | Metrication and Enhancement of MicroBENCOST Software Package | Completed | |
| NCHRP 07-13 | Quantifying Congestion | Completed | |
| NCHRP 07-14 | Guidelines for Analysis of Investments in Bicycle Facilities | Completed | |
| NCHRP 07-15 | Cost-Effective Measures and Planning Procedures for Travel Time, Delay, and Reliability | Active | |
| NCHRP 07-16 | Recommended Revisions to the AASHTO Guidelines for Traffic Data Programs | Active | |
| NCHRP 08-24A | Forecasting the Basic Inputs to Transportation Planning at the Zonal Level | Completed | |
| NCHRP 08-28 | Strategic Planning and Management for Transportation Agencies | Completed | |
| NCHRP 08-29 | Travel Estimation Techniques for Urban Planning | Completed | |
| NCHRP 08-29(2) | Travel Estimation Techniques for Urban Planning | Completed | |
| NCHRP 08-30 | Characteristics and Changes in Freight Transportation Demand | Completed | |
| NCHRP 08-30A | Freight Capacity for the Next Century | Completed | |
| NCHRP 08-31A | Long-Term Availability of Multimodal Corridor Capacity | Completed | |
| NCHRP 08-32 | Workshop on Multimodal Transportation Planning Research Needs | Completed | |
| NCHRP 08-32(1) | Innovative Practices for Multimodal Transportation Planning for Freight and Passengers | Completed | |
| NCHRP 08-32(2) | Multimodal Transportation: Development of a Performance-Based Planning Process | Completed | |
| NCHRP 08-32(2)A | Multimodal Transportation: Development of a Performance-Based Planning Process | Completed | |
| NCHRP 08-32(3) | Integration of Land-Use Planning with Multimodal Transportation Planning | Completed | |
| NCHRP 08-32(4) | Developing and Maintaining Partnerships for Multimodal Transportation Planning | Completed | |
| NCHRP 08-32(5) | Multimodal Transportation Planning Data | Completed | |
| NCHRP 08-33 | Quantifying Air-Quality and Other Benefits and Costs of Transportation Control Measures | Completed | |
| NCHRP 08-34 | Major Investment Studies: Development of a Practitioner's Guidebook for Effective Study Design, Management, and Implementation | Completed | |
| NCHRP 08-35 | Incorporating ITS into the Transportation Planning Process | Active | |
| NCHRP 08-36 | Research for the AASHTO Standing Committee on Planning | Active | |
| NCHRP 08-36/Task 01 | Parking Modeling Procedures | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 02 | Incorporating System Operations and Management Practices in Transportation Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 03 | Management of Institutional Changes in State Transportation Planning Processes and Programs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 04 | The Use of Expert Panels in Analyzing Transportation and Land Use Alternatives | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 05 | Incorporating Market Research Techniques into the Transportation Planning Process | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 06 | Product Delivery of New and Improved Travel Forecasting Procedures | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 07 | Development of a Multimodal Tradeoffs Methodology for Use in Statewide Transportation Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 07(02) | Development of a Multimodal Tradeoffs Methodology for Use in Statewide Transportation Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 08 | Workshop on Transportation Performance Measures | Completed | Completed---Published as TRB Conference Proceedings 26 |
| NCHRP 08-36/Task 09 | Defining and Identifying Probable Non-Attainment Areas for PM2.5 | Completed | Completed---Final report sent to AASHTO; see Project 25-17 |
| NCHRP 08-36/Task 10 | Global Climate Change and Transportation: Coming to Terms | Completed | Completed---Final report published by Eno Foundation and sent to AASHTO |
| NCHRP 08-36/Task 11 | Technical Methods to Support Analysis of Environmental-Justice Issues | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 12A | Analysis of the Factors Affecting Future Transportation Environment and their Implications for State DOTs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 12B | Analysis of the Factors Affecting Future Transportation Environment and their Implications for State DOTs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 13 | National Conference on Transportation and Economic Development | Completed | Completed---Published as TRB Circular E-C050 |
| NCHRP 08-36/Task 14 | Consultation Between State DOTs and Local Elected Officials in Non-Metropolitan Areas | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 15 | Conference on Transportation and the Environment for the 21st Century | Completed | Completed---Published as TRB Circular E-C028 |
| NCHRP 08-36/Task 16 | Assessment of Proposed Planning and National Environmental Policy Act Regulations | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 17 | Two-Way Education Process with a New CEO on Transportation Planning | Completed | Task cancelled |
| NCHRP 08-36/Task 18 | Incorporating Safety into the Transportation Planning Process | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 19 | Transportation Environmental Research Needs Conference | Completed | Completed---Published as TRB Conference Proceedings 28 |
| NCHRP 08-36/Task 20 | Conformity Problems Caused by the Mismatch in SIP / Transportation Plan Timeframe | Completed | Completed---Final report sent to AASHTO; $25K from Project 20-7/Task 141 |
| NCHRP 08-36/Task 21 | Expediting the Transportation Planning Process to Meet Fast Paced Customer Requirements | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 22 | Demonstrating the Positive Impacts of Transportation Investments on Economic, Social, Environmental, Community, and Quality of Life Issues | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 23 | Review of the Potential Feasibility of Using Alternative Revenue Sources to Fund Future State Transportation Needs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 24 | Investment Requirements Scenarios Development | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 25 | Improved Geographic Clarity in Reporting of Road System Extent | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 26 | Surface Transportation Safety and Investment | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 27 | Interstate Interchange Review | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 28 | Rural Conformity: A Survey of Practice | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 29 | Development of a Multimodal Tradeoffs Methodology for Use in Statewide Transportation Planning: Application of the Framework | Completed | Contracted as 08-36/Task 07(02); continuation of Project 08-36/Task 07 |
| NCHRP 08-36/Task 30 | Workshop on Issues in Intermodal Connectors | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 31 | Elderly Issues in the Transportation Planning Process | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 32 | Tools, Techniques, and Methods in Rural Transportation Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 33 | Best Practices in Statewide Freight Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 34 | Incorporating Security into the Transportation Planning Process | Completed | Completed---Published as NCHRP Report 525, Volume 3 |
| NCHRP 08-36/Task 35 | Evaluating State DOT's Planning Practices in Rural Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 36 | Continuation of NCHRP 8-36(6) TMIP Support | Active | For contract purposes, this has been amended into the work plan of NCHRP Project 8-36, Task 6 and progress will be reported under that task. |
| NCHRP 08-36/Task 37 | A Retrospective on the Conditions and Performance Report | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 38 | Supplemental Evaluation in Support of NCHRP 25-17 | Completed | Completed---Results incorporated into NCHRP 25-17 final report |
| NCHRP 08-36/Task 39 | Forecasting Travel Time, Delay, and Reliability | Active | For contract purposes, this task has been amended into NCHRP Project 7-15 and will be reported there. |
| NCHRP 08-36/Task 40 | National Site Visits on Transportation and Growth | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 41 | Non-Response to Personal Travel Surveys (support for NCHRP 8-37) | Completed | Completed---Results incorporated into NCHRP 08-37 final report |
| NCHRP 08-36/Task 42 | MPO Redefinition and Evolving Roles | Active | Research in progress |
| NCHRP 08-36/Task 43 | Return on Investment on Freight Rail Capacity Improvement | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 44 | Multi-State MPOs: Approaches, Cases, and Institutional Arrangements | Completed | Completed |
| NCHRP 08-36/Task 45 | Multi-State Corridor Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 46 | Synthesis of Where Data Groups are Organizationally Located in State DOTs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 47 | Effective Organization of Performance Measurement | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 48 | Guidance for Better Linking Systems Planning and the NEPA Process | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 49 | Synthesis of Metropilitan-Level Transportation Funding Sources | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 50 | What is the Impact of an Aging Population on System Planning and Investment Policies? | Completed | Completed---Final report has been received |
| NCHRP 08-36/Task 51 | Information Design for Effective Decision Making and Communication | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 52 | Changes in Travel Behavior/Demand Due to Managed Lanes (HOV, HOT) Facility System Expansion | Completed | Research in progress; time extension to 11/30/06 requested |
| NCHRP 08-36/Task 53 | Peer Review Capacity Building Partnership: Best Practices in Non-Traditional Performance Measures, Multimodal Goods Movement Tradeoffs, Safety, Reliability, and State Funding | Completed | Completed---Final reports sent to AASHTO |
| NCHRP 08-36/Task 54 | Census Data For Transportation Planning | Completed | Completed---Papers posted to TRB Conference website and will be published in Conference Proceedings 12/30/2006 |
| NCHRP 08-36/Task 55 | The Role of Collaboration in Freight Transportation Management | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 56 | Highway Construction Project Coordination to Minimize Traffic Impacts | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 57 | Institutional Needs in Safety Planning | Completed | Completed |
| NCHRP 08-36/Task 58 | Best Practices for State and MPO NHS and STP Programming | Completed | Completed |
| NCHRP 08-36/Task 59 | Transportation and Health | Completed | Completed |
| NCHRP 08-36/Task 60 | State DOT Consideration of Infrastructure Development Potential Planning | Completed | Completed |
| NCHRP 08-36/Task 61 | Monetary Valuation Per Dollar of Investment in Different Performance Measures | Completed | Completed |
| NCHRP 08-36/Task 62 | Best Practice Methodology for Calculating Return on Investment (ROI) for Transportation Programs and Projects | Active | Research in progress |
| NCHRP 08-36/Task 63 | Making NAICS (North American Industrial Classification System) Work for Transportation | Completed | Completed |
| NCHRP 08-36/Task 64 | Right of Way Methods and Tools to Control Project Cost Escalation | Active | In development |
| NCHRP 08-36/Task 65 | Best Practices for Incorporating Commodity Flow Survey and Related Data into the MPO and Statewide Planning Processes | Active | Research in progress |
| NCHRP 08-36/Task 66 | Improved Methods for Assessing Social, Cultural, and economic Effects of Transportation Projects | Active | Research in progress |
| NCHRP 08-36/Task 67 | Best Practices in Using Programmatic Investment Strategies in Statewide Transportation Plans | Active | Research in progress |
| NCHRP 08-36/Task 68 | Implications of New 8-Hour Control Strategy Development on Transportation Programs, Policies, and Projects | Completed | Completed |
| NCHRP 08-36/Task 70 | Scoping Study for Statewide Travel Forecasting National Model | Active | |
| NCHRP 08-36/Task 71 | Disclosure Avoidance Techniques to Improve ACS Data Availability | Active | Research in progress |
| NCHRP 08-36/Task 72 | Implementing Project Cost Estimation and Management Process Improvements | Active | |
| NCHRP 08-36/Task 73 | Adding Resilience to the Freight System in Statewide and Metropolitan Transportation Plans: Developing a Conceptual Approach | Pending | |
| NCHRP 08-36/Task 74 | Customer Research Practices and Applications in Transportation | Active | Research in Progress |
| NCHRP 08-36/Task 75 | Research Finders | Active | Research in progress |
| NCHRP 08-36/Task 78 | Small Community Research and Peer Exchange | Active | Research in Progress |
| NCHRP 08-36/Task 79 | Scoping Study for a Freight Data Exchange Network | Active | Research in Progress |
| NCHRP 08-36/Task 80 | Synthesis of State Practices in Developing Linear Referencing Systems | Pending | Contract Pending |
| NCHRP 08-36/Task 81 | Enhancing the American Community Survey Data as a Source for Home-to-Work Flows | Active | Research in Progress |
| NCHRP 08-36/Task 83 | Transportation Planning Partnerships to Enhance National Parks and Gateway Communities | Pending | |
| NCHRP 08-36/Task 84 | Asset Management of Environmental Mitigation Features | Pending | |
| NCHRP 08-36/Task 85 | Congestion Pricing and Investment Requirements | Pending | |
| NCHRP 08-36/Task 86 | Corridor Approaches to Integrating Land Transportation and Land Use | Pending | |
| NCHRP 08-36B | Research for the AASHTO Standing Committee on Planning | Pending | |
| NCHRP 08-37 | Standardized Procedures for Personal Travel Surveys | Active | |
| NCHRP 08-38 | Consideration of Environmental Factors in Transportation Systems Planning | Completed | |
| NCHRP 08-39 | Financing and Improving Land Access to U.S. Cargo Hubs | Completed | |
| NCHRP 08-40 | Evaluating Cultural Resource Significance Using Information Technology (IT) | Completed | |
| NCHRP 08-40(02) | Evaluating Cultural Resource Significance-Implementation Tools | Completed | |
| NCHRP 08-41 | Effective Methods for Environmental Justice Assessment | Completed | |
| NCHRP 08-42 | Rail-Freight Solutions to Roadway Congestion | Final | |
| NCHRP 08-43 | Methods for Forecasting Statewide Freight Movements and Related Performance Measures | Final | |
| NCHRP 08-44 | Incorporating Safety into Long-Range Transportation Planning | Completed | |
| NCHRP 08-44(02) | Transportation Safety Planning: Forecasting the Safety Impacts of Socio-Demographic Changes and Safety Investments | Active | |
| NCHRP 08-45 | A New Vision of Mobility: Guidance to Foster Collaborative Multimodal Decision Making | Completed | |
| NCHRP 08-46 | A Guide for Including Access Management in Transportation Plans | Completed | |
| NCHRP 08-47 | Guidebook for Freight Policy, Planning, and Programming in Small and Mid-Sized Metropolitan Areas | Active | |
| NCHRP 08-48 | Using American Community Survey Data for Transportation Planning | Completed | |
| NCHRP 08-49 | Procedures for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction | Active | |
| NCHRP 08-50 | Factors that Support the Planning-Programming Linkage | Active | |
| NCHRP 08-51 | Enhancing Internal Trip Capture Estimation for Mixed-Use Developments | Active | |
| NCHRP 08-52 | Best Practices to Enhance the Transportation/Land-Use Connection in Rural America | Completed | |
| NCHRP 08-53 | Integrating Freight into Transportation Planning and Project-Selection Processes | Final | Published as NCHRP Report 594 |
| NCHRP 08-54 | Identification of Liability-Related Impediments to Sharing 409 Safety Data Among Transportation Agencies, and Synthesis of Best Practices | Active | |
| NCHRP 08-55 | Integrating Geo-Spatial Technologies into the Right-of-Way Data-Management Process | Completed | |
| NCHRP 08-55A | Developing a Logical Model for a Geo-Spatial Right-Of-Way Land Management System | Active | |
| NCHRP 08-56 | Truck Noise-Source Mapping | Active | |
| NCHRP 08-57 | Improved Framework and Tools for Highway Pricing Decisions | Active | |
| NCHRP 08-58 | Development of a Multimodal Statewide Corridor Planning Guidebook | Active | |
| NCHRP 08-59 | Transportation Cost Implications of New Development | Active | |
| NCHRP 08-60 | Guidebook on Risk Analysis Tools and Management Practices to Control Transportation Project Cost | Active | |
| NCHRP 08-61 | Travel Demand Forecasting: Parameters and Techniques | Active | |
| NCHRP 08-62 | Transportation Performance Management Programs--Insight from Practitioners | Active | |
| NCHRP 08-63 | Review of Canadian Experience with Large Commercial Motor Vehicles | Active | |
| NCHRP 08-64 | A Guidebook on Improved Principles, Processes, and Methods for Shared-Use Passenger and Freight Rail Corridors | Active | |
| NCHRP 08-65 | Guidebook for Successful Communication, Cooperation, and Coordination Strategies Between Transportation Agencies and Tribal Communities | Pending | |
| NCHRP 08-66 | Trip-Generation Rates for Transportation Impact Analyses of Infill Developments | Pending | |
| NCHRP 08-67 | Integrating Individual Transportation System-Level Performance Programs to Determine Network Performance | Pending | |
| NCHRP 08-68 | Citizen’s Guide and Discipline-Specific Professionals’ Guide for Context-Sensitive Solutions in Transportation | Pending | |
| NCHRP 08-69 | Supplement to the AASHTO Transportation Asset Management Guide: Volume 2 - A Focus on Implementation | Active | Research in Progress |
| NCHRP 08-70 | Target-Setting Methods and Data Management To Support Performance-Based Resource Allocation by Transportation Agencies | Active | |
| NCHRP 09-06(01) | Asphalt-Aggregate Mixture Analysis System (AAMAS) | Completed | |
| NCHRP 09-07 | Field Procedures and Equipment to Implement SHRP Asphalt Specifications | Completed | |
| NCHRP 09-08 | Designing Stone Matrix Asphalt Mixtures | Completed | |
| NCHRP 09-09 | Refinement of the Superpave Gyratory Compaction Procedure | Completed | |
| NCHRP 09-09(1) | Verification of Gyration Levels in the Ndesign Table | Completed | |
| NCHRP 09-10 | Superpave Protocols for Modified Asphalt Binders | Completed | |
| NCHRP 09-11 | Segregation in Hot-Mix Asphalt Pavements | Completed | |
| NCHRP 09-12 | Incorporation of Reclaimed Asphalt Pavement in the Superpave System | Completed | |
| NCHRP 09-13 | Evaluation of Water Sensitivity Tests | Completed | |
| NCHRP 09-14 | Investigation of the Restricted Zone in the Superpave Aggregate Gradation Specification | Completed | |
| NCHRP 09-15 | Quality Characteristics and Test Methods for Use in Performance-Related Specifications of Hot-Mix Asphalt Pavements | Completed | |
| NCHRP 09-16 | Relationship Between Superpave Gyratory Compaction Properties and Permanent Deformation of Pavements in Service | Completed | |
| NCHRP 09-17 | Accelerated Laboratory Rutting Tests: Asphalt Pavement Analyzer | Completed | |
| NCHRP 09-18 | Field Shear Test for Hot Mix Asphalt | Completed | |
| NCHRP 09-19 | Superpave Support and Performance Models Management | Completed | |
| NCHRP 09-20 | Performance-Related Specifications for Hot-Mix Asphalt Construction | Completed | |
| NCHRP 09-21 | Advisory Structure for Superpave Implementation and Related Research | Completed | |
| NCHRP 09-22 | Beta Testing and Validation of HMA PRS | Active | |
| NCHRP 09-23 | Environmental Effects in Pavement Mix and Structural Design Systems | Completed | |
| NCHRP 09-25 | Requirements for Voids in Mineral Aggregate for Superpave Mixtures | Completed | |
| NCHRP 09-26 | Precision Statements for AASHTO T312 and other Laboratory Test Methods | Completed | |
| NCHRP 09-26A | Data Mining and Interlaboratory Studies to Prepare Precision Statements for AASHTO Standard Test Methods | Active | |
| NCHRP 09-27 | Relationships of HMA In-Place Air Voids, Lift Thickness, and Permeability | Completed | |
| NCHRP 09-29 | Simple Performance Tester for Superpave Mix Design | Active | |
| NCHRP 09-30 | Experimental Plan for Calibration and Validation of HMA Performance Models for Mix and Structural Design | Completed | |
| NCHRP 09-30A | Calibration of Rutting Models for HMA Structural and Mix Design | Active | |
| NCHRP 09-31 | Air Void Requirements for Superpave Mix Design | Completed | |
| NCHRP 09-33 | A Mix Design Manual for Hot Mix Asphalt | Active | |
| NCHRP 09-34 | Improved Conditioning Procedure for Predicting the Moisture Susceptibility of HMA Pavements | Completed | |
| NCHRP 09-35 | Aggregate Properties and Their Relationship to the Performance of Superpave-Designed HMA: A Critical Review | Completed | |
| NCHRP 09-36 | Improved Procedure for Laboratory Aging of Asphalt Binders in Pavements | Active | |
| NCHRP 09-37 | Using Surface Energy Measurements To Select Materials for Asphalt Pavements | Completed | |
| NCHRP 09-38 | Endurance Limit of Hot Mix Asphalt Mixtures to Prevent Fatigue Cracking in Flexible Pavements | Active | |
| NCHRP 09-39 | Procedure for Determining Mixing and Compaction Temperatures of Asphalt Binders in Hot Mix Asphalt | Active | |
| NCHRP 09-40 | Optimization of Tack Coat for HMA Placement | Active | |
| NCHRP 09-41 | Performance and Maintenance of Permeable Friction Courses | Active | |
| NCHRP 09-42 | History of Superpave: Documenting the Research Program and Implementation Process | Active | |
| NCHRP 09-43 | Mix Design Practices for Warm Mix Asphalt | Active | |
| NCHRP 09-44 | Developing a Plan for Validating an Endurance Limit for HMA Pavements | Active | |
| NCHRP 09-45 | Test Methods and Specification Criteria for Mineral Filler Used in HMA | Active | |
| NCHRP 09-46 | Improved Mix Design, Evaluation, and Materials Management Practices for Hot Mix Asphalt with High Reclaimed Asphalt Pavement Content | Active | |
| NCHRP 09-47 | Engineering Properties, Emissions, and Field Performance of Warm Mix Asphalt Technologies | Active | |
| NCHRP 10-13 | Ultrasonic Measurement of Weld Flaw Size | Completed | |
| NCHRP 10-17 | Use of Antistripping Additives in Asphaltic Concrete Mixtures | Completed | |
| NCHRP 10-20 | Elastomeric Bearings Design, Construction, and Materials | Completed | |
| NCHRP 10-20A | High-Load, Multi-Rotational Bridge Bearings: Design, Materials, and Construction | Completed | |
| NCHRP 10-22 | The Performance of Weathering Steel in Bridges | Completed | |
| NCHRP 10-25A | Instantaneous Determination of Water-Cement Ratio in Fresh Concrete | Completed | |
| NCHRP 10-26 | Performance-Related Specifications for Hot-Mix Asphaltic Concrete | Completed | |
| NCHRP 10-27 | Determination of Asphaltic Concrete Pavement Structural Properties by Nondestructive Testing | Completed | |
| NCHRP 10-29 | Anchorage Zone Reinforcement for Post-Tensioned Concrete Girders | Completed | |
| NCHRP 10-30(3) | Nondestructive Methods for Field Inspection of Embedded or Encased High Strength Steel Rods and Cables | Completed | |
| NCHRP 10-31 | Acceptance Criteria for Steel Bridge Welds | Completed | |
| NCHRP 10-32A | Durability Testing of High-Strength Concrete Containing High-Range Water-Reducing Admixtures | Completed | |
| NCHRP 10-33 | Potential Benefits of Geosynthetics in Flexible Pavement Systems | Completed | |
| NCHRP 10-34 | Transient Protection, Grounding, and Shielding of Electronic Traffic Control Equipment | Completed | |
| NCHRP 10-35 | Fatigue Behavior of Welded and Mechanical Splices in Reinforcing Steel | Completed | |
| NCHRP 10-36 | Evaluation of Weldments Incorporating Backing Materials | Completed | |
| NCHRP 10-37 | Performance of Epoxy-Coated Reinforcing Steel in Highway Bridges | Completed | |
| NCHRP 10-37A | Performance of Epoxy-Coated Reinforcing Steel--Laboratory Testing | Completed | |
| NCHRP 10-37B | A Protocol for the Evaluation of Existing Bridges Containing Epoxy-Coated Reinforcing Steel | Completed | |
| NCHRP 10-37C | Repair and Rehabilitation of Bridge Components Containing Epoxy-Coated Reinforcement | Completed | |
| NCHRP 10-38 | Fatigue-Resistant Design of Cantilevered Signal, Sign, and Light Supports | Completed | |
| NCHRP 10-38(2) | Fatigue-Resistant Design of Cantilevered Signal, Sign, and Light Supports | Completed | |
| NCHRP 10-39 | Construction Testing and Inspection Levels | Completed | |
| NCHRP 10-39A | Testing and Inspection Levels for Hot-Mix Asphaltic Concrete Overlays | Completed | |
| NCHRP 10-40 | Plasma Arc Cutting of Bridge Steels | Completed | |
| NCHRP 10-41 | Evaluation of Unbonded Portland Cement Concrete Overlays | Completed | |
| NCHRP 10-42 | Constructibility Review Process for Transportation Facilities | Completed | |
| NCHRP 10-43 | Movable Bridge Inspection, Evaluation, and Maintenance | Completed | |
| NCHRP 10-44 | Nondestructive Testing to Determine Insitu Material Properties of Pavement Layers | Completed | |
| NCHRP 10-44A | Determination of Insitu Material Properties of Asphalt Concrete Pavement Layers | Completed | |
| NCHRP 10-45 | Procedures for Evaluating Corrosion-Inhibiting Admixtures for Structural Concrete | Completed | |
| NCHRP 10-46 | Corrosion of Steel Piling in Nonmarine Applications | Completed | |
| NCHRP 10-47 | Guidelines for Longitudinal Pavement Profile Measurement | Completed | |
| NCHRP 10-48 | Assessing Pavement Layer Condition Using Deflection Data | Completed | |
| NCHRP 10-49 | Improved Contracting Methods for Highway Construction Projects | Completed | |
| NCHRP 10-50 | Strategies for Rehabilitating Rigid Pavements Subjected to High-Traffic Volumes | Completed | |
| NCHRP 10-50A | Guidelines for Selecting Strategies for Rehabilitating Rigid Pavements Subjected to High-Traffic Volumes | Completed | |
| NCHRP 10-51 | Performance-Related Specifications for Elastomeric Bridge Bearings | Completed | |
| NCHRP 10-52 | Performance Tests for Modular Bridge Joints | Completed | |
| NCHRP 10-53 | Condition Evaluation of Prestressed Steel Strands in Concrete Bridges | Completed | |
| NCHRP 10-54 | Quality-Based Performance Rating of Contractors for Prequalification and Bidding Purposes | Completed | |
| NCHRP 10-55 | Fiber Reinforced Polymer Composites for Concrete Bridge Deck Reinforcement | Completed | |
| NCHRP 10-56 | Accelerated Pavement Testing: Data Guidelines | Completed | |
| NCHRP 10-57 | Structural Safety Evaluation Guidelines for Suspension Bridge Parallel-Wire Cables | Completed | |
| NCHRP 10-58 | Construction Engineering and Management Research Program | Completed | |
| NCHRP 10-58(01) | Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts | Active | |
| NCHRP 10-58(02) | Using Contractor-Performed Tests in Quality Assurance | Active | |
| NCHRP 10-59A | Construction Specifications for Bonded Repair and Retrofit of Concrete Structures Using FRP Composites | Completed | |
| NCHRP 10-60 | Avoiding Delays in Constructing Highway Projects (CANCELED) | Completed | |
| NCHRP 10-61 | Best-Value Procurement Methods for Highway Construction Projects | Completed | |
| NCHRP 10-62 | Acceptance Tests for Surface Characteristics of Steel Strands in Pre-Stressed Concrete | Active | |
| NCHRP 10-63 | Heat-Straightening Repair of Damaged Steel Bridge Girders: Fatigue and Fracture Performance | Completed | |
| NCHRP 10-64 | Field Inspection of In-Service FRP Bridge Decks | Completed | |
| NCHRP 10-65 | Nondestructive Testing Technology for Quality Control and Acceptance of Flexible Pavement Construction | Active | |
| NCHRP 10-66 | Predicting In-Service Performance of Flexible Pavements from Accelerated Pavement Testing | Completed | |
| NCHRP 10-67 | Texturing of Concrete Pavements | Active | |
| NCHRP 10-68 | Guidelines for the Use of Highway Pavement Warranties | Active | |
| NCHRP 10-69 | Guidelines for Dowel Alignment in Concrete Pavements | Active | |
| NCHRP 10-70 | Cost-Effective Connection Details for Highway Sign, Luminaire, and Traffic Signal Structures | Active | |
| NCHRP 10-71 | Evaluation of CIP Reinforced Joints for Full-Depth Precast Concrete Bridge Decks | Active | |
| NCHRP 10-72 | Bridge Deck Design Criteria and Testing Procedures | Active | |
| NCHRP 10-73 | Guide Specification for the Design of Externally Bonded FRP Systems for Repair and Strengthening of Concrete Bridge Elements | Active | |
| NCHRP 10-74 | Development of Fatigue Loading and Design Methodology for High-Mast Lighting Poles | Pending | |
| NCHRP 10-75 | Guide for Pavement-Type Selection | Pending | |
| NCHRP 10-76 | Methodologies for Evaluating Pavement Strategies and Barriers for Noise Mitigation | Pending | |
| NCHRP 11-07 | National Data-Management System for Highway Tort Claims | Completed | |
| NCHRP 12-15(5) | Fatigue Behavior of Variable Loaded Bridge Details Near the Fatigue Limit | Completed | |
| NCHRP 12-23 | Recommended Revisions to the AASHTO Manual for Maintenance Inspection of Bridges | Completed | |
| NCHRP 12-26(2) | Distribution of Wheel Loads on Highway Bridges | Completed | |
| NCHRP 12-27 | Welded Repair of Cracks in Steel Bridge Members | Completed | |
| NCHRP 12-28(01) | Load Capacity Evaluation of Existing Bridges | Completed | |
| NCHRP 12-28(02) | Bridge Management Systems | Completed | |
| NCHRP 12-28(02)A | Bridge Management Systems Software | Completed | |
| NCHRP 12-28(02)B | Bridge Management Systems Software | Completed | |
| NCHRP 12-28(02)C | Conversion of BRIDGIT Bridge Management Software to Windows | Completed | |
| NCHRP 12-28(03) | Fatigue Evaluation Procedures for Steel Bridges | Completed | |
| NCHRP 12-28(06) | Distortion-Induced Fatigue Cracking in Steel Bridges | Completed | |
| NCHRP 12-28(07) | Guidelines for Evaluating Corrosion Effects in Existing Steel Bridges | Completed | |
| NCHRP 12-28(10) | Guidelines for Determining Redundancy in Steel Bridges | Completed | |
| NCHRP 12-28(11) | Development of Site-Specific Load Models for Bridge Rating | Completed | |
| NCHRP 12-28(12) | Inelastic Rating Procedures for Steel Beam and Girder Bridges | Completed | |
| NCHRP 12-28(13) | Nondestructive Load Testing for Bridge Evaluation and Rating | Completed | |
| NCHRP 12-28(13)A | Bridge Rating Through Nondestructive Load Testing | Completed | |
| NCHRP 12-29 | Design of Simple-Span Precast Prestressed Bridge Girders Made Continuous | Completed | |
| NCHRP 12-30 | Fatigue of Cables in Cable-Stayed Bridges | Completed | |
| NCHRP 12-31 | Notch Toughness Variability in Bridge Steel Plates | Completed | |
|