| ACRP 11-02/Task 14 | Background Information on the Data Protection Standard PCI DSS, and Its Applicability to the Airport Environment to Help Ensure that Airport Business Systems Meet this Commercial Standard | Anticipated | |
| HMCRP HM-08 | Feasibility of a Single Transportation Worker Identification Credential and License | Anticipated | |
| NCFRP 13 | Developing High Productivity Truck Corridors | Anticipated | |
| NCFRP 21 | Legal Considerations for Accessing Private Freight Data for Transportation Planning | Anticipated | |
| NCFRP 22 | Applying Benefit-Cost Analysis to Freight Project Selection: Lessons from the Corps of Engineers | Anticipated | |
| NCFRP 25 | Generation and Attraction of Freight by Land Use Characteristics | Anticipated | |
| NCHRP 01-48 | Integrating Pavement Preservation into the Design Process | Anticipated | |
| NCHRP 01-49 | Guidelines for Forensic Evaluation of Highway Pavements | Anticipated | |
| NCHRP 03-86 | Traffic Operations Management and Planning Process | Anticipated | |
| NCHRP 08-77 | Developing Regional Historic Contexts for Post-World War II Housing | Anticipated | |
| NCHRP 08-78 | Develop Bicycle/Pedestrian Demand Model to Measure Bicycle/Pedestrian Activity and Relationship to Land Use | Anticipated | |
| NCHRP 08-79 | Identifying Credible Alternatives for Producing 5-year CTPP Data Products from the ACS | Anticipated | |
| NCHRP 09-49 | Long Term Field Performance of Warm Mix Asphalt Technologies | Anticipated | |
| NCHRP 10-80 | Conversion of the AASHTO 'Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals' to the Load and Resistance Factor Design (LRFD) Methodology | Anticipated | |
| NCHRP 10-81 | Evaluation of Fuel Usage Factors in Highway Construction | Anticipated | |
| NCHRP 10-82 | Performance Related Specifications (PRS) for Pavement Preservation Treatments | Anticipated | |
| NCHRP 10-83 | Alternative Quality Systems for Application in Highway Construction | Anticipated | |
| NCHRP 12-85 | Roadway Bridges Fire Hazard Assessment | Anticipated | |
| NCHRP 12-86 | Bridge System Safety and Redundancy | Anticipated | |
| NCHRP 14-20 | Quantifying the Costs and Risks of Delayed Maintenance | Anticipated | |
| NCHRP 14-21 | Optimization of Resource Allocation for Highway Preservation Needs | Anticipated | |
| NCHRP 14-22 | Effective Removal of Pavement Markings | Anticipated | |
| NCHRP 15-39 | Superelevation Criteria for Sharp Horizontal Curves on Steep Grades | Anticipated | |
| NCHRP 15-40 | Designing the Roadway Transition from Rural Highways to Urban/Suburban Highways or Streets | Anticipated | |
| NCHRP 15-41 | Updated Headlamp Design Criteria for Sag Vertical Curves | Anticipated | |
| NCHRP 15-42 | Use of Bicycle Lanes for Various Roadway Characteristics | Anticipated | |
| NCHRP 16-05 | Development of Cost-Effective Treatments of Roadside Ditches to Reduce the Number and Severity of Roadside Crashes | Anticipated | |
| NCHRP 17-46 | Comprehensive Analysis Framework for Safety Investment Decisions | Anticipated | |
| NCHRP 17-47 | Human Factors Guidelines for Road Systems-Phase IV | Anticipated | |
| NCHRP 17-48 | Development of a Strategic National Highway Infrastructure Safety Research Agenda | Anticipated | |
| NCHRP 19-09 | Truck Tolling - The Role of Freight Markets and Industry Characteristics in Decision Making | Anticipated | |
| NCHRP 20-83 | Long-Range Strategic Issues Facing the Transportation Industry | Anticipated | In development. For more information, see the Project 20-83 series of projects. |
| NCHRP 20-83(06) | Effects of Socio-Demographics on Travel Demand | Anticipated | |
| NCHRP 20-83(07) | Sustainable Transportation Systems and Sustainability as an Organizing Principle for Transportation Agencies | Anticipated | |
| NCHRP 20-84 | Streamline and Simplify Right-of-Way Procedures and Business Practice | Anticipated | |
| NCHRP 20-85 | Wind, Solar and Ground-Source Energy for Maintenance Area Facilities | Anticipated | |
| NCHRP 20-86 | Skill Set Requirements and Career Opportunity Awareness for Transportation Systems Operation and Management Needs at High School and College Levels | Anticipated | |
| NCHRP 22-20(02) | Design of TL-5 Roadside Barrier Systems Placed on MSE Retaining Walls | Anticipated | |
| NCHRP 24-34 | Risk-Based Approach to Bridge Scour Prediction | Anticipated | |
| NCHRP 25-32 | Enhanced Stormwater Treatment BMPs in Highly Urbanized Areas | Anticipated | |
| NCHRP 25-33 | Evaluation of the Methodologies for Visual Impact Assessments | Anticipated | |
| SHRP 2 C07 | Integrating SHRP 2 Products into the Collaborative Decision making Process (1) | Anticipated | |
| SHRP 2 C11 | Development of Improved Economic Analysis Tools Based on Recommendations from project C03 (2) | Anticipated | |
| SHRP 2 C12 | The Effect of Public-Private Partnerships and Non-Traditional Procurement Processes on Highway Planning, Environmental Review, and Collaborative Decision Making | Anticipated | |
| SHRP 2 C15 | Integrating Freight Considerations into Collaborative Decision Making for Additions to Highway Capacity | Anticipated | |
| SHRP 2 C16 | The Effect of Smart Growth Policies on Travel Demand | Anticipated | |
| SHRP 2 C18 | Pilot Test the Collaborative Decision-Making Framework with Three DOTS, Including a Self-Assessment Method | Anticipated | |
| SHRP 2 C21 | Pilot Test the C06 A&B Approaches to Environmental Protection | Anticipated | |
| SHRP 2 C22 | Prepare a Decision Makers Guide to the Collaborative Decision Making Framework | Anticipated | |
| SHRP 2 L05 | Incorporating Reliability Performance Measures into the Transportation Planning and Programming Processes | Anticipated | |
| SHRP 2 L08 | Incorporation of Non-recurrent Congestion Factors into the Highway Capacity Manual Methods | Anticipated | |
| SHRP 2 L09 | Incorporation of Non-recurrent Congestion Factors into the AASHTO Policy on Geometric Design | Anticipated | |
| SHRP 2 L15 | Reliability Innovations Deserving Exploratory Analysis ( IDEA) | Anticipated | |
| SHRP 2 L16 | Assistance to Contractors to Archive Their Data for Reliability and Related Projects | Anticipated | |
| SHRP 2 L17 | A Framework for Improving Travel Time Reliability | Anticipated | |
| SHRP 2 S04 | Acquisition of Roadway Information | Anticipated | |
| SHRP 2 S06 | Technical Coordination and Independent Quality Assurance for Field Study | Anticipated | |
| SHRP 2 S08 | Analysis of In-Vehicle Field Study Data and Countermeasure Implications | Anticipated | |
| SHRP 2 S10 | Design and Conduct of the Site-Based Field Study | Anticipated | |
| SHRP 2 S11 | Analysis of Site-Based Field Study Data and Countermeasure Implications | Anticipated | |