Performance of Steel Pipe Pile-to-Concrete Cap Connections Subject to Seismic or High Transverse Loading: Phase III
The Montana Department of Transportation has released a report that investigates the efficacy of a new procedure developed to design concrete filled steel tube (CFT) piles to concrete pile cap connections.
This Summary Last Modified On: 2/21/2013