| NCHRP 01-25(1) | Effects of Heavy Vehicle Characteristics on Pavement Response and Performance---Phase II | Completed | |
| NCHRP 01-27 | Video Image Processing for Evaluating Pavement Surface Distress | Completed | |
| NCHRP 01-28 | Laboratory Determination of Resilient Modulus for Flexible Pavement Design | Completed | |
| NCHRP 01-28A | Harmonized Test Methods for Laboratory Determination of Resilient Modulus for Flexible Pavement Design | Completed | |
| NCHRP 01-29 | Improved Surface Drainage of Pavements | Completed | |
| NCHRP 01-30 | Support Under Portland Cement Concrete Pavements | Completed | |
| NCHRP 01-31 | Smoothness Specifications for Pavements | Completed | |
| NCHRP 01-32 | Systems for Design of Highway Pavements | Completed | |
| NCHRP 01-33 | Methodology to Improve Pavement-Investment Decisions | Completed | |
| NCHRP 01-34 | Performance of Subsurface Pavement Drainage | Completed | |
| NCHRP 01-34A | Contributions of Pavement Structural Layers to Rutting of Flexible Pavements | Completed | |
| NCHRP 01-34B | Effectiveness of Subsurface Drainage for HMA and PCC Pavements | Completed | |
| NCHRP 01-34C | Effects of Subsurface Drainage on Performance of Asphalt and Concrete Pavements | Completed | |
| NCHRP 01-34D | Effects of Subsurface Drainage on Performance of Asphalt and Concrete Pavements: Further Evaluation and Analysis of LTPP SPS-1 and SPS-2 Field Sections | Completed | |
| NCHRP 01-35A | Guide for Pavement Management | Completed | |
| NCHRP 01-36 | Determination of Pavement Damage from Super-Single and Singled-Out Dual Truck Tires | Completed | |
| NCHRP 01-37 | Development of the 2002 Guide for the Design of New and Rehabilitated Pavement Structures | Completed | |
| NCHRP 01-37A | Development of the 2002 Guide for the Design of New and Rehabilitated Pavement Structures: Phase II | Completed | |
| NCHRP 01-37A(01) | Distribution Plan for the Recommended Mechanistic-Empirical Pavement Guide and Software | Completed | |
| NCHRP 01-38 | Guide on Pavement Rehabilitation Strategies | Completed | |
| NCHRP 01-39 | Traffic Data Collection, Analysis, and Forecasting for Mechanistic Pavement Design | Completed | |
| NCHRP 01-40 | Facilitating the Implementation of the Guide for the Design of New and Rehabilitated Pavement Structures | Active | Version 1.0 (June 2007) of the Mechanistic-Empirical Pavement Design Guide software is available online for evaluation at http://www.trb.org/mepdg/. To report a software error, go to http://www.ara-tracker.com. |
| NCHRP 01-40A | Independent Review of the Recommended Mechanistic-Empirical Design Guide and Software | Completed | |
| NCHRP 01-40B | User Manual and Local Calibration Guide for the Mechanistic-Empirical Pavement Design Guide and Software | Completed | |
| NCHRP 01-40D(01) | Technical Assistance to NCHRP and NCHRP Project 1-40A: Versions 0.9 and 1.0 of the M-E Pavement Design Software | Active | |
| NCHRP 01-40D(02) | Technical Assistance to NCHRP and NCHRP Project 1-40A: Versions 0.9 and 1.0 of the M-E Pavement Design Software | Active | |
| NCHRP 01-41 | Models for Predicting Reflection Cracking of Hot-Mix Asphalt Overlays | Active | |
| NCHRP 01-42 | Top-Down Fatigue Cracking of Hot-Mix Asphalt Layers - Phase I | Completed | |
| NCHRP 01-42A | Models for Predicting Top-Down Cracking of Hot-Mix Asphalt Layers | Active | |
| NCHRP 01-43 | Guide for Pavement Friction | Completed | |
| NCHRP 01-44 | Measuring Tire-Pavement Noise at the Source | Completed | |
| NCHRP 01-45 | Models for Estimating the Effects of Pavement Condition on Vehicle Operating Costs | Active | |
| NCHRP 01-46 | Handbook for Pavement Design, Construction, and Management | Pending | |
| NCHRP 01-47 | Sensitivity Evaluation of MEPDG Performance Prediction | Pending | |
| NCHRP 01-48 | Integrating Pavement Preservation into the Design Process | Anticipated | |
| NCHRP 01-49 | Guidelines for Forensic Evaluation of Highway Pavements | Anticipated | |
| NCHRP 02-14 | Public/Private Partnerships for Financing Highway Improvements | Completed | |
| NCHRP 02-15 | Identifying Measuring, and Evaluating the Benefits of Safety Roadside Rest Areas | Completed | |
| NCHRP 02-16 | Relationships Between Vehicle Configurations and Highway Design | Completed | |
| NCHRP 02-17(1) | Methodologies for Evaluating the Effects of Transportation Policies on the Economy | Completed | |
| NCHRP 02-17(2) | Workshop on Research Needs in Transportation and Economic Development | Completed | |
| NCHRP 02-17(3) | Macroeconomic Analysis of the Linkages Between Transportation Investments and Economic Performance | Completed | |
| NCHRP 02-17(3)A | Update and Enhancement of Dataset for Macroeconomic Analysis of Transportation Investments and Economic Performance | Completed | |
| NCHRP 02-17(4) | Measuring the Relationship Between Freight Transportation Services and Industry Productivity | Completed | |
| NCHRP 02-17(5) | Impact of Urban Congestion on Business | Completed | |
| NCHRP 02-17(6) | Tourism Travel Contributions to Economic Development | Completed | |
| NCHRP 02-18 | Research Strategies for Improving Highway User Cost-Estimating Methodologies | Completed | |
| NCHRP 02-18(2) | Valuation of Travel-Time Savings and Predictability in Congested Conditions for Highway User-Cost Estimation | Completed | |
| NCHRP 02-18(3) | Development of an Innovative Highway User-Cost Estimation Procedure | Completed | |
| NCHRP 02-18(4) | Development and Demonstration of StratBENCOST Procedure | Completed | |
| NCHRP 02-19 | Research on the Relationship Between Economic Development and Transportation Investment | Completed | |
| NCHRP 02-19(2) | Guidance on Using Existing Analytic Tools for Evaluating Transportation Investments | Completed | |
| NCHRP 02-20 | Economic Trends and Multimodal Transportation Requirements | Completed | |
| NCHRP 02-21 | Economic Implications of Congestion | Completed | |
| NCHRP 02-22 | Needs in Communicating the Economic Impacts of Transportation Investment | Completed | |
| NCHRP 02-22(2) | Case Studies on Communicating the Economic Benefits of Transportation Investments | Completed | |
| NCHRP 02-23 | Development of an Update to the 1977 AASHTO Redbook | Completed | |
| NCHRP 03-28 | Effects of Quality of Traffic Signal Progression on Delay | Completed | |
| NCHRP 03-32 | Temporary Pavement Markings for Work Zones | Completed | |
| NCHRP 03-33 | Capacity and Level-of-Service Procedures for Multilane Rural and Suburban Highways | Completed | |
| NCHRP 03-35 | Speed-Change Lanes | Completed | |
| NCHRP 03-36 | Development of a Low-Cost Bridge Weigh-In-Motion System | Completed | |
| NCHRP 03-37 | Capacity and Level of Service at Ramp-Freeway Junctions | Completed | |
| NCHRP 03-37(2) | Capacity and Level of Service at Ramp-Freeway Junctions (Phase II) | Completed | |
| NCHRP 03-38(1) | Assessment of Advanced Technologies for Relieving Urban Traffic Congestion | Completed | |
| NCHRP 03-38(1)A | A Study to Assess Advanced Vehicle and Highway Technologies | Completed | |
| NCHRP 03-38(2) | Travel Characteristics of Large-Scale Suburban Activity Centers | Completed | |
| NCHRP 03-38(3) | Traffic Adaptive Control (Phase 1)---Critical Intersection Control Strategies; (Phase 2)---OPAC Control Strategies | Completed | |
| NCHRP 03-38(4) | Traffic Signal Control for Saturated Conditions | Completed | |
| NCHRP 03-38(5) | Effective Utilization of Street Width | Completed | |
| NCHRP 03-38(6) | Cost Sharing for Transportation Improvements Near Major Suburban Employment Centers | Completed | |
| NCHRP 03-38(7) | Access Management Policies and Guidelines for Activity Centers | Completed | |
| NCHRP 03-39 | Evaluation and Calibration Procedures for Weigh-In-Motion Systems | Completed | |
| NCHRP 03-39(2) | On-Site Evaluation and Calibration Procedures for Weigh-In-Motion Systems | Completed | |
| NCHRP 03-40 | Single Point Urban Interchange Design and Operations Analysis | Completed | |
| NCHRP 03-41 | Procedure for Determining Work Zone Speed Limits | Completed | |
| NCHRP 03-41(2) | Effectiveness and Implementability of Procedures for Work Zone Speed Limits | Completed | |
| NCHRP 03-42 | Determination of Stopping Sight Distances | Completed | |
| NCHRP 03-43 | Use of Shoulders and Narrow Lanes to Increase Freeway Capacity | Completed | |
| NCHRP 03-44 | Improved Traffic Control Device Design and Placement to Aid the Older Driver | Completed | |
| NCHRP 03-45 | Speed-Flow Relationships for Basic Freeway Segments | Completed | |
| NCHRP 03-46 | Capacity and Level of Service at Unsignalized Intersections | Completed | |
| NCHRP 03-47 | Capacity Analysis of Interchange Ramp Terminals | Completed | |
| NCHRP 03-48 | Capacity Analysis for Actuated Intersections | Completed | |
| NCHRP 03-49 | Capacity and Operational Effects of Midblock Left-Turn Lanes | Completed | |
| NCHRP 03-50 | Driver Information Overload | Completed | |
| NCHRP 03-50(2) | Additional Investigations on Driver Information Overload | Completed | |
| NCHRP 03-51 | Communications Mediums for Signal, IVHS, and Freeway Surveillance Systems | Completed | |
| NCHRP 03-52 | Impacts of Access-Management Techniques | Completed | |
| NCHRP 03-52A | Impacts of Access-Management Techniques | Completed | |
| NCHRP 03-53 | Development of a HOV Systems Manual | Completed | |
| NCHRP 03-54 | Uniform Traffic Signal Displays for Protected/Permissive Left Turn Control | Completed | |
| NCHRP 03-54(2) | Evaluation of Traffic Signal Displays for Protected/Permissive Left Turn Control | Completed | |
| NCHRP 03-55 | A Highway Capacity Manual for the Year 2000 | Completed | |
| NCHRP 03-55(2) | Techniques to Estimate Speeds and Service Volumes for Planning Applications | Completed | |
| NCHRP 03-55(2)A | Planning Applications for the Year 2000 Highway Capacity Manual | Completed | |
| NCHRP 03-55(3) | Capacity and Quality of Service for Two-Lane Highways | Completed | |
| NCHRP 03-55(4) | Performance Measures and Levels of Service in the Year 2000 Highway Capacity Manual | Completed | |
| NCHRP 03-55(5) | Capacity and Quality of Service of Weaving Areas | Completed | |
| NCHRP 03-55(6) | Production of the Year 2000 Highway Capacity Manual | Completed | |
| NCHRP 03-56 | Systemwide Impact of Safety and Traffic Operation Design Decisions for Resurfacing, Restoration, or Rehabilitation (RRR) Projects | Completed | |
| NCHRP 03-57 | Recommended Traffic-Control Devices for Railroad-Highway Grade Crossings | Completed | |
| NCHRP 03-58 | Assessing Traffic Control Signal Installations Using Capacity Analysis and Simulation | Completed | |
| NCHRP 03-59 | Assessment of Variable Speed Limit Implementation Issues | Completed | |
| NCHRP 03-60 | Capacity and Quality of Service of Interchange Ramp Terminals | Completed | Results incorporated into the HCM |
| NCHRP 03-60A | Validation and Enhancement of the Highway Capacity Manual’s Interchange Ramp Terminal Methodology | Active | |
| NCHRP 03-61 | Communicating Changes in Horizontal Alignment | Completed | |
| NCHRP 03-62 | Guidelines for Accessible Pedestrian Signals | Active | |
| NCHRP 03-63 | Assessment of Sharing Information Between Public Safety and Transportation Agencies for Traffic-Incident Management | Completed | |
| NCHRP 03-64 | Highway Capacity Manual Applications Guide | Completed | |
| NCHRP 03-65 | Applying Roundabouts in the United States | Active | |
| NCHRP 03-65A | Update of 'Roundabouts: An Informational Guide' | Active | |
| NCHRP 03-66 | Traffic Signal State Transition Logic Using Enhanced Sensor Information | Active | |
| NCHRP 03-67 | Expert System for Recommending Speed Limits in Speed Zones | Completed | |
| NCHRP 03-68 | Guide to Effective Freeway Performance Measurement | Completed | |
| NCHRP 03-69 | Design of Construction Work Zones on High-Speed Highways | Completed | |
| NCHRP 03-70 | Multimodal Level of Service Analysis For Urban Streets | Active | |
| NCHRP 03-71 | Innovative Pedestrian Treatments at Unsignalized Crossings | Completed | |
| NCHRP 03-72 | Lane Widths, Channelized Right Turns, and Right-Turn Deceleration Lanes in Urban and Suburban Areas | Active | |
| NCHRP 03-73 | Separation of Vehicles - CMV Only Lanes | Active | |
| NCHRP 03-74 | Guidelines for Selection of Speed Reduction Treatments at High-Speed Intersections | Completed | |
| NCHRP 03-75 | Analysis of Freeway Weaving Sections | Completed | |
| NCHRP 03-76A | Highway Traffic Signal Warrant For Intersections Near Highway-Rail Grade Crossings | Completed | Results incorporated into the MUTCD |
| NCHRP 03-76B | Low-Cost Active Warning Systems for Highway-Rail Grade Crossings | Active | |
| NCHRP 03-77 | Guide to Contracting Intelligent Transportation System Projects | Final | |
| NCHRP 03-78 | Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities | Completed | |
| NCHRP 03-78A | Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities | Active | |
| NCHRP 03-79 | Measuring and Predicting the Performance of Automobile Traffic on Urban Streets | Active | |
| NCHRP 03-79A | Arterial Performance Measures | Active | |
| NCHRP 03-80 | Traffic Enforcement Strategies for Work Zones | Active | |
| NCHRP 03-81 | Strategies for Integrated Operation of Freeway and Arterial Corridors | Active | |
| NCHRP 03-82 | Default Values for Capacity and Quality of Service Analyses | Completed | Published as NCHRP Report 599 |
| NCHRP 03-83 | Low-Cost Improvements for Recurring Freeway Bottlenecks | Active | |
| NCHRP 03-84 | Guide for Multistate Transportation Operations Programs | Completed | Report delivered to AASHTO for publication. |
| NCHRP 03-85 | Guidance for the Use of Alternative Traffic Analysis Tools in Highway Capacity Analyses | Active | |
| NCHRP 03-86 | Traffic Operations Management and Planning Process | Anticipated | |
| NCHRP 03-87 | Proactive Ramp Management Under the Threat of Freeway-Flow Breakdown | Active | |
| NCHRP 03-88 | Guidelines for Ramp and Interchange Spacing | Active | Work has been initiated. The interim report is expected in January 2009. |
| NCHRP 03-89 | Design Guidance for Channelized Right-Turn Lanes | Active | |
| NCHRP 03-90 | Operation of Traffic Signal Systems in Oversaturated Conditions | Active | |
| NCHRP 03-91 | Left-Turn Accommodations at Unsignalized Intersections | Active | |
| NCHRP 03-92 | Production of the Year 2010 Highway Capacity Manual | Active | |
| NCHRP 03-93 | Automated Enforcement for Speeding and Red Light Running | Active | STATUS - The contractor is conducting a survey to study current and past programs. |
| NCHRP 03-94 | Transportation Systems Operations and Management Guide | Active | Contract is just underway |
| NCHRP 03-95 | Guidelines for Timing Yellow and All-Red Intervals at Signalized Intersections | Pending | |
| NCHRP 03-96 | Analysis of Managed Lanes on Freeway Facilities | Active | The project is just underway. |
| NCHRP 03-97 | Traffic Signal Analysis with Varying Demands and Capacities | Active | |
| NCHRP 03-98 | Guidelines on the Use of Auxiliary Through Lanes at Signalized Intersections | Active | Research in Progress |
| NCHRP 03-99 | Development and Application of Access Management Guidelines | Pending | Contractor has been selected; contract is expected to be executed in Spring 2009 |
| NCHRP 04-15 | Corrosion Protection of Prestressing Systems in Concrete Bridges | Completed | |
| NCHRP 04-16 | Cost and Service Life of Pavement Markings | Completed | |
| NCHRP 04-18 | Design and Evaluation of Large Stone Mixtures | Completed | |
| NCHRP 04-19 | Aggregate Tests Related to Asphalt Concrete Performance in Pavements | Completed | |
| NCHRP 04-19(2) | Validation of Performance-Related Tests of Aggregates for Use in Hot-Mix Asphalt Pavements | Completed | |
| NCHRP 04-20 | Aggregate Tests Related to Performance of Portland Cement Concrete | Completed | |
| NCHRP 04-20A | State of the Art Report and Plan for Research on Aggregates Tests Related to Performance of Portland Cement Concrete Pavements | Completed | |
| NCHRP 04-20B | Aggregate Tests Related to Performance of Portland Cement Concrete Pavements | Completed | |
| NCHRP 04-20C | Aggregate Tests Related to Performance of Portland Cement Concrete Pavements: State of the Knowledge | Completed | |
| NCHRP 04-21 | Appropriate Use of Waste and Recycled Materials in the Transportation Industry | Completed | |
| NCHRP 04-22 | Pavement-Marking Materials: Health, Environmental, and Performance Assessment | Completed | |
| NCHRP 04-23 | Performance-Related Tests of Aggregates for Use in Unbound Pavement Layers | Completed | |
| NCHRP 04-24 | HDPE Pipe Material Specifications and Design Requirements | Completed | |
| NCHRP 04-25 | Implementation Plan for Automating Highway-Materials Testing | Completed | |
| NCHRP 04-26 | Thermoplastic Drainage Pipe, Design and Testing | Completed | The project final report is available as NCHRP Report 631. |
| NCHRP 04-27 | Application of Fiber Reinforced Polymer (FRP) Composites to the Highway Infrastructure: Strategic Plan | Completed | |
| NCHRP 04-28 | Feasibility Study for an All-White Pavement Marking System | Completed | |
| NCHRP 04-29 | Selection of Materials to Optimize Sign Performance | Completed | |
| NCHRP 04-30 | Test Methods for Characterizing Aggregate Shape, Texture, and Angularity | Completed | |
| NCHRP 04-30A | Test Methods for Characterizing Aggregate Shape, Texture, and Angularity | Completed | |
| NCHRP 04-31 | Tests of Recycled Aggregates for Use in Unbound Pavement Layers | Completed | |
| NCHRP 04-32 | Performance and Quality Control of Corrugated Pipe Manufactured with Recycled Polyethylene Content | Active | Awaiting the preliminary draft final report. |
| NCHRP 04-33 | Procedures for Testing and Evaluating Detectable Warning Systems | Active | |
| NCHRP 04-34 | Application of LADAR in the Analysis of Aggregate Characteristics | Active | Work in progress. |
| NCHRP 04-35 | Improved Test Methods for Specific Gravity and Absorption of Coarse and Fine Aggregate | Active | Work in progress on Phase II. The Phase I interim report is available for loan on request to NCHRP. |
| NCHRP 04-36 | Characterization of Cementitiously Stabilized Layers for Use in Pavement Design and Analysis | Active | |
| NCHRP 04-37 | Long-Term Performance of Epoxy Adhesive Anchor Systems | Pending | |
| NCHRP 04-38 | Recommended Laboratory Test for Predicting the Initial Retroreflectivity of Pavement Markings from Glass Bead Quality | Active | |
| NCHRP 05-10 | A Mobile System for Measuring Retroreflectance of Traffic Signs | Completed | |
| NCHRP 05-11 | Implementation Strategies for Sign Retroreflectivity Standards | Completed | |
| NCHRP 05-12 | Requirements for Application of Light Emitting Diodes (LEDs) to Traffic Control Signals | Completed | |
| NCHRP 05-13 | Illumination Guidelines for Nighttime Highway Work | Completed | |
| NCHRP 05-13(2) | Illumination Guidelines for Nighttime Highway Work | Completed | |
| NCHRP 05-14 | Advance Warning Arrow Panel Visibility | Completed | |
| NCHRP 05-15 | Visibility Performance Requirements for Vehicular Traffic Signals | Completed | |
| NCHRP 05-16 | National Calibration Standards for Measuring Retroreflectivity | Completed | |
| NCHRP 05-17 | Safety Evaluation of Permanent Raised Pavement Markers | Completed | |
| NCHRP 05-18 | Color Effectiveness of Yellow Pavement Marking Materials | Completed | |
| NCHRP 05-19 | Guidelines for Roadway Lighting Based on Safety Benefits and Costs | Active | The draft final report is expected in February 2009. |
| NCHRP 06-12 | Improved Visibility for Snow Plowing Operations | Completed | |
| NCHRP 06-13 | Guidelines for Snow and Ice Control Materials and Methods | Completed | |
| NCHRP 06-14 | Feasibility of Using Friction Indicators to Improve Winter Maintenance Operations and Mobility | Completed | |
| NCHRP 06-15 | Testing and Calibration Methods for RWIS Sensors | Completed | |
| NCHRP 06-16 | Guidelines for the Selection of Snow and Ice Control Materials To Mitigate Environmental Impacts | Completed | |
| NCHRP 06-17 | Performance Measures for Snow and Ice Control Operations | Completed | |
| NCHRP 07-12 | Microcomputer Evaluation of Highway User Benefits | Completed | |
| NCHRP 07-12(2) | Metrication and Enhancement of MicroBENCOST Software Package | Completed | |
| NCHRP 07-13 | Quantifying Congestion | Completed | |
| NCHRP 07-14 | Guidelines for Analysis of Investments in Bicycle Facilities | Completed | |
| NCHRP 07-15 | Cost-Effective Measures and Planning Procedures for Travel Time, Delay, and Reliability | Final | |
| NCHRP 07-16 | Recommended Revisions to the AASHTO Guidelines for Traffic Data Programs | Final | |
| NCHRP 08-24A | Forecasting the Basic Inputs to Transportation Planning at the Zonal Level | Completed | |
| NCHRP 08-28 | Strategic Planning and Management for Transportation Agencies | Completed | |
| NCHRP 08-29 | Travel Estimation Techniques for Urban Planning | Completed | |
| NCHRP 08-29(2) | Travel Estimation Techniques for Urban Planning | Completed | |
| NCHRP 08-30 | Characteristics and Changes in Freight Transportation Demand | Completed | |
| NCHRP 08-30A | Freight Capacity for the Next Century | Completed | |
| NCHRP 08-31A | Long-Term Availability of Multimodal Corridor Capacity | Completed | |
| NCHRP 08-32 | Workshop on Multimodal Transportation Planning Research Needs | Completed | |
| NCHRP 08-32(1) | Innovative Practices for Multimodal Transportation Planning for Freight and Passengers | Completed | |
| NCHRP 08-32(2) | Multimodal Transportation: Development of a Performance-Based Planning Process | Completed | |
| NCHRP 08-32(2)A | Multimodal Transportation: Development of a Performance-Based Planning Process | Completed | |
| NCHRP 08-32(3) | Integration of Land-Use Planning with Multimodal Transportation Planning | Completed | |
| NCHRP 08-32(4) | Developing and Maintaining Partnerships for Multimodal Transportation Planning | Completed | |
| NCHRP 08-32(5) | Multimodal Transportation Planning Data | Completed | |
| NCHRP 08-33 | Quantifying Air-Quality and Other Benefits and Costs of Transportation Control Measures | Completed | |
| NCHRP 08-34 | Major Investment Studies: Development of a Practitioner's Guidebook for Effective Study Design, Management, and Implementation | Completed | |
| NCHRP 08-35 | Incorporating ITS into the Transportation Planning Process | Active | |
| NCHRP 08-36 | Research for the AASHTO Standing Committee on Planning | Active | |
| NCHRP 08-36/Task 01 | Parking Modeling Procedures | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 02 | Incorporating System Operations and Management Practices in Transportation Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 03 | Management of Institutional Changes in State Transportation Planning Processes and Programs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 04 | The Use of Expert Panels in Analyzing Transportation and Land Use Alternatives | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 05 | Incorporating Market Research Techniques into the Transportation Planning Process | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 06 | Product Delivery of New and Improved Travel Forecasting Procedures | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 07 | Development of a Multimodal Tradeoffs Methodology for Use in Statewide Transportation Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 07(02) | Development of a Multimodal Tradeoffs Methodology for Use in Statewide Transportation Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 08 | Workshop on Transportation Performance Measures | Completed | Completed---Published as TRB Conference Proceedings 26 |
| NCHRP 08-36/Task 09 | Defining and Identifying Probable Non-Attainment Areas for PM2.5 | Completed | Completed---Final report sent to AASHTO; see Project 25-17 |
| NCHRP 08-36/Task 10 | Global Climate Change and Transportation: Coming to Terms | Completed | Completed---Final report published by Eno Foundation and sent to AASHTO |
| NCHRP 08-36/Task 11 | Technical Methods to Support Analysis of Environmental-Justice Issues | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 12A | Analysis of the Factors Affecting Future Transportation Environment and their Implications for State DOTs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 12B | Analysis of the Factors Affecting Future Transportation Environment and their Implications for State DOTs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 13 | National Conference on Transportation and Economic Development | Completed | Completed---Published as TRB Circular E-C050 |
| NCHRP 08-36/Task 14 | Consultation Between State DOTs and Local Elected Officials in Non-Metropolitan Areas | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 15 | Conference on Transportation and the Environment for the 21st Century | Completed | Completed---Published as TRB Circular E-C028 |
| NCHRP 08-36/Task 16 | Assessment of Proposed Planning and National Environmental Policy Act Regulations | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 17 | Two-Way Education Process with a New CEO on Transportation Planning | Completed | Task cancelled |
| NCHRP 08-36/Task 18 | Incorporating Safety into the Transportation Planning Process | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 19 | Transportation Environmental Research Needs Conference | Completed | Completed---Published as TRB Conference Proceedings 28 |
| NCHRP 08-36/Task 20 | Conformity Problems Caused by the Mismatch in SIP / Transportation Plan Timeframe | Completed | Completed---Final report sent to AASHTO; $25K from Project 20-7/Task 141 |
| NCHRP 08-36/Task 21 | Expediting the Transportation Planning Process to Meet Fast Paced Customer Requirements | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 22 | Demonstrating the Positive Impacts of Transportation Investments on Economic, Social, Environmental, Community, and Quality of Life Issues | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 23 | Review of the Potential Feasibility of Using Alternative Revenue Sources to Fund Future State Transportation Needs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 24 | Investment Requirements Scenarios Development | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 25 | Improved Geographic Clarity in Reporting of Road System Extent | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 26 | Surface Transportation Safety and Investment | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 27 | Interstate Interchange Review | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 28 | Rural Conformity: A Survey of Practice | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 29 | Development of a Multimodal Tradeoffs Methodology for Use in Statewide Transportation Planning: Application of the Framework | Completed | Contracted as 08-36/Task 07(02); continuation of Project 08-36/Task 07 |
| NCHRP 08-36/Task 30 | Workshop on Issues in Intermodal Connectors | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 31 | Elderly Issues in the Transportation Planning Process | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 32 | Tools, Techniques, and Methods in Rural Transportation Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 33 | Best Practices in Statewide Freight Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 34 | Incorporating Security into the Transportation Planning Process | Completed | Completed---Published as NCHRP Report 525, Volume 3 |
| NCHRP 08-36/Task 35 | Evaluating State DOT's Planning Practices in Rural Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 36 | Continuation of NCHRP 8-36(6) TMIP Support | Active | For contract purposes, this has been amended into the work plan of NCHRP Project 8-36, Task 6 and progress will be reported under that task. |
| NCHRP 08-36/Task 37 | A Retrospective on the Conditions and Performance Report | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 38 | Supplemental Evaluation in Support of NCHRP 25-17 | Completed | Completed---Results incorporated into NCHRP 25-17 final report |
| NCHRP 08-36/Task 39 | Forecasting Travel Time, Delay, and Reliability | Completed | Completed: For contract purposes, this task has been amended into NCHRP Project 7-15 and will be reported there. |
| NCHRP 08-36/Task 40 | National Site Visits on Transportation and Growth | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 41 | Non-Response to Personal Travel Surveys (support for NCHRP 8-37) | Completed | Completed---Results incorporated into NCHRP 08-37 final report |
| NCHRP 08-36/Task 42 | MPO Redefinition and Evolving Roles | Completed | Completed--Final report sent to AASHTO |
| NCHRP 08-36/Task 43 | Return on Investment on Freight Rail Capacity Improvement | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 44 | Multi-State MPOs: Approaches, Cases, and Institutional Arrangements | Final | Final: Report sent to AASHTO |
| NCHRP 08-36/Task 45 | Multi-State Corridor Planning | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 46 | Synthesis of Where Data Groups are Organizationally Located in State DOTs | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 47 | Effective Organization of Performance Measurement | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 48 | Guidance for Better Linking Systems Planning and the NEPA Process | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 49 | Synthesis of Metropilitan-Level Transportation Funding Sources | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 50 | What is the Impact of an Aging Population on System Planning and Investment Policies? | Completed | Completed---Final report has been received |
| NCHRP 08-36/Task 51 | Information Design for Effective Decision Making and Communication | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 52 | Changes in Travel Behavior/Demand Due to Managed Lanes (HOV, HOT) Facility System Expansion | Completed | Completed--Final report sent to AASHTO |
| NCHRP 08-36/Task 53 | Peer Review Capacity Building Partnership: Best Practices in Non-Traditional Performance Measures, Multimodal Goods Movement Tradeoffs, Safety, Reliability, and State Funding | Completed | Completed---Final reports sent to AASHTO |
| NCHRP 08-36/Task 54 | Census Data For Transportation Planning | Completed | Completed---Papers posted to TRB Conference website and will be published in Conference Proceedings 12/30/2006 |
| NCHRP 08-36/Task 55 | The Role of Collaboration in Freight Transportation Management | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 56 | Highway Construction Project Coordination to Minimize Traffic Impacts | Completed | Completed---Final report sent to AASHTO |
| NCHRP 08-36/Task 57 | Institutional Needs in Safety Planning | Final | Completed |
| NCHRP 08-36/Task 58 | Best Practices for State and MPO NHS and STP Programming | Final | |
| NCHRP 08-36/Task 59 | Transportation and Health | Completed | Completed |
| NCHRP 08-36/Task 60 | State DOT Consideration of Infrastructure Development Potential Planning | Completed | Completed |
| NCHRP 08-36/Task 61 | Monetary Valuation Per Dollar of Investment in Different Performance Measures | Completed | Completed |
| NCHRP 08-36/Task 62 | Best Practice Methodology for Calculating Return on Investment (ROI) for Transportation Programs and Projects | Completed | Completed - Final Report sent to AASHTO |
| NCHRP 08-36/Task 63 | Making NAICS (North American Industrial Classification System) Work for Transportation | Completed | Completed |
| NCHRP 08-36/Task 64 | Right of Way Methods and Tools to Control Project Cost Escalation | Completed | Completed--project canceled and funds combined with NCHRP Project 08-49, Procedures for Cost Estimation and Management for Highway Projects During Planning, Programming, and Reconstruction |
| NCHRP 08-36/Task 65 | Best Practices for Incorporating Commodity Flow Survey and Related Data into the MPO and Statewide Planning Processes | Active | Research in progress |
| NCHRP 08-36/Task 66 | Improved Methods for Assessing Social, Cultural, and economic Effects of Transportation Projects | Completed | Completed--Final report sent to AASHTO |
| NCHRP 08-36/Task 67 | Best Practices in Using Programmatic Investment Strategies in Statewide Transportation Plans | Final | Completed--Final report sent to AASHTO |
| NCHRP 08-36/Task 68 | Implications of New 8-Hour Control Strategy Development on Transportation Programs, Policies, and Projects | Completed | Completed |
| NCHRP 08-36/Task 69 | Peer Review Sessions to be amended into NCHRP 8-36(53) | Final | Completed; Reports sent to AASHTO |
| NCHRP 08-36/Task 70 | Scoping Study for Statewide Travel Forecasting National Model | Completed | The project has been completed and the final report submitted to AASHTO |
| NCHRP 08-36/Task 71 | Disclosure Avoidance Techniques to Improve ACS Data Availability | Final | The project has been completed and the final report submitted to AASHTO |
| NCHRP 08-36/Task 72 | Implementing Project Cost Estimation and Management Process Improvements | Completed | Completed--Final report sent to AASHTO |
| NCHRP 08-36/Task 73 | Adding Resilience to the Freight System in Statewide and Metropolitan Transportation Plans: Developing a Conceptual Approach | Active | Reserach in progress |
| NCHRP 08-36/Task 74 | Customer Research Practices and Applications in Transportation | Completed | Completed--Final report sent to AASHTO |
| NCHRP 08-36/Task 75 | Research Finders | Completed | Completed--Final report sent to AASHTO |
| NCHRP 08-36/Task 76 | Conference on Best Practices in Meeting SAFETEA-LU Requirements in the Statewide Transportation Planning Process | Final | Completed. |
| NCHRP 08-36/Task 78 | Small Community Research and Peer Exchange | Active | Research in progress, Preliminary Draft Final Report received. |
| NCHRP 08-36/Task 79 | Scoping Study for a Freight Data Exchange Network | Final | The project has been completed and the final report submitted to AASHTO |
| NCHRP 08-36/Task 80 | Synthesis of State Practices in Developing Linear Referencing Systems | Final | The project has been completed and the final report submitted to AASHTO |
| NCHRP 08-36/Task 81 | Enhancing the American Community Survey Data as a Source for Home-to-Work Flows | Active | Research in Progress, Preliminary Draft Final report received. |
| NCHRP 08-36/Task 83 | Transportation Planning Partnerships to Enhance National Parks and Gateway Communities | Pending | |
| NCHRP 08-36/Task 84 | Asset Management of Environmental Mitigation Features | Pending | |
| NCHRP 08-36/Task 85 | Congestion Pricing and Investment Requirements | Final | This project is complete and the final report has been sent to AASHTO. |
| NCHRP 08-36/Task 86 | Corridor Approaches to Integrating Land Transportation and Land Use | Pending | |
| NCHRP 08-36/Task 90 | Best Practices in the Use of Microsimulation Models | Active | Research in progress |
| NCHRP 08-36/Task 91 | Validation and Sensitivity Considerations for Statewide Models | Active | Research in progress |
| NCHRP 08-36/Task 93 | Road Pricing Communication Practices | Active | Research in progress |
| NCHRP 08-36B | Research for the AASHTO Standing Committee on Planning | Pending | |
| NCHRP 08-37 | Standardized Procedures for Personal Travel Surveys | Completed | |
| NCHRP 08-38 | Consideration of Environmental Factors in Transportation Systems Planning | Completed | |
| NCHRP 08-39 | Financing and Improving Land Access to U.S. Cargo Hubs | Completed | |
| NCHRP 08-40 | Evaluating Cultural Resource Significance Using Information Technology (IT) | Completed | |
| NCHRP 08-40(02) | Evaluating Cultural Resource Significance-Implementation Tools | Completed | |
| NCHRP 08-41 | Effective Methods for Environmental Justice Assessment | Completed | |
| NCHRP 08-42 | Rail-Freight Solutions to Roadway Congestion | Final | |
| NCHRP 08-43 | Methods for Forecasting Statewide Freight Movements and Related Performance Measures | Final | |
| NCHRP 08-44 | Incorporating Safety into Long-Range Transportation Planning | Completed | |
| NCHRP 08-44(02) | Transportation Safety Planning: Forecasting the Safety Impacts of Socio-Demographic Changes and Safety Investments | Active | |
| NCHRP 08-45 | A New Vision of Mobility: Guidance to Foster Collaborative Multimodal Decision Making | Completed | |
| NCHRP 08-46 | A Guide for Including Access Management in Transportation Plans | Completed | |
| NCHRP 08-47 | Guidebook for Freight Policy, Planning, and Programming in Small and Mid-Sized Metropolitan Areas | Active | |
| NCHRP 08-48 | Using American Community Survey Data for Transportation Planning | Completed | |
| NCHRP 08-49 | Procedures for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction | Completed | |
| NCHRP 08-49(02) | Right of Way Methods and Tools to Control Project Cost Escalation | Active | |
| NCHRP 08-50 | Factors that Support the Planning-Programming Linkage | Active | |
| NCHRP 08-51 | Enhancing Internal Trip Capture Estimation for Mixed-Use Developments | Active | |
| NCHRP 08-52 | Best Practices to Enhance the Transportation/Land-Use Connection in Rural America | Completed | |
| NCHRP 08-53 | Integrating Freight into Transportation Planning and Project-Selection Processes | Final | Published as NCHRP Report 594 |
| NCHRP 08-54 | Identification of Liability-Related Impediments to Sharing 409 Safety Data Among Transportation Agencies, and Synthesis of Best Practices | Final | |
| NCHRP 08-55 | Integrating Geo-Spatial Technologies into the Right-of-Way Data-Management Process | Completed | |
| NCHRP 08-55A | Developing a Logical Model for a Geo-Spatial Right-Of-Way Land Management System | Active | Work in progress on Phase II. |
| NCHRP 08-56 | Truck Noise-Source Mapping | Active | The preliminary draft final report has been received and is under review. |
| NCHRP 08-57 | Improved Framework and Tools for Highway Pricing Decisions | Active | |
| NCHRP 08-58 | Development of a Multimodal Statewide Corridor Planning Guidebook | Active | |
| NCHRP 08-59 | Transportation Cost Implications of New Development | Active | The interim report has been accepted and the preliminary draft final report is expected in May 2009. |
| NCHRP 08-60 | Guidebook on Risk Analysis Tools and Management Practices to Control Transportation Project Cost | Active | |
| NCHRP 08-61 | Travel Demand Forecasting: Parameters and Techniques | Active | Research in Progress - Interim Report received. |
| NCHRP 08-62 | Transportation Performance Management Programs--Insight from Practitioners | Active | |
| NCHRP 08-63 | Review of Canadian Experience with Large Commercial Motor Vehicles | Active | The preliminary draft final report has been received and is under review. |
| NCHRP 08-64 | A Guidebook on Improved Principles, Processes, and Methods for Shared-Use Passenger and Freight Rail Corridors | Active | |
| NCHRP 08-65 | Guidebook for Successful Communication, Cooperation, and Coordination Strategies Between Transportation Agencies and Tribal Communities | Active | Initial tasks are underway. An interim report is expected in May 2009. |
| NCHRP 08-66 | Trip-Generation Rates for Transportation Impact Analyses of Infill Developments | Active | |
| NCHRP 08-67 | Integrating Individual Transportation System-Level Performance Programs to Determine Network Performance | Active | |
| NCHRP 08-68 | Citizen’s Guide and Discipline-Specific Professionals’ Guide for Context-Sensitive Solutions in Transportation | Active | |
| NCHRP 08-69 | Supplement to the AASHTO Transportation Asset Management Guide: Volume 2 - A Focus on Implementation | Active | Research in Progress - Interim report presented |
| NCHRP 08-70 | Target-Setting Methods and Data Management To Support Performance-Based Resource Allocation by Transportation Agencies | Active | |
| NCHRP 08-71 | Methodology for Estimating Life Expectancies of Highway Assets | Active | |
| NCHRP 08-72 | Practical Approaches for Involving Traditionally Underserved Populations in Transportation Decisionmaking | Pending | |
| NCHRP 08-73 | Road Pricing, Public Perceptions and Program Development | Active | Research in Progress |
| NCHRP 08-74 | Sustainability Performance Measures for State Departments of Transportation and Other Transportation Agencies | Pending | |
| NCHRP 08-75 | Guidelines for Evaluation and Performance Measurement of Congestion Pricing Projects | Active | Work is underway on the initial tasks. |
| NCHRP 08-76 | Institutionalizing Safety in Transportation Planning Processes: Techniques, Tactics and Strategies | Pending | |
| NCHRP 08-77 | Developing Regional Historic Contexts for Post-World War II Housing | Anticipated | |
| NCHRP 08-78 | Develop Bicycle/Pedestrian Demand Model to Measure Bicycle/Pedestrian Activity and Relationship to Land Use | Anticipated | |
| NCHRP 08-79 | Identifying Credible Alternatives for Producing 5-year CTPP Data Products from the ACS | Anticipated | |
| NCHRP 09-06(01) | Asphalt-Aggregate Mixture Analysis System (AAMAS) | Completed | |
| NCHRP 09-07 | Field Procedures and Equipment to Implement SHRP Asphalt Specifications | Completed | |
| NCHRP 09-08 | Designing Stone Matrix Asphalt Mixtures | Completed | |
| NCHRP 09-09 | Refinement of the Superpave Gyratory Compaction Procedure | Completed | |
| NCHRP 09-09(1) | Verification of Gyration Levels in the Ndesign Table | Completed | |
| NCHRP 09-10 | Superpave Protocols for Modified Asphalt Binders | Completed | |
| NCHRP 09-11 | Segregation in Hot-Mix Asphalt Pavements | Completed | |
| NCHRP 09-12 | Incorporation of Reclaimed Asphalt Pavement in the Superpave System | Completed | |
| NCHRP 09-13 | Evaluation of Water Sensitivity Tests | Completed | |
| NCHRP 09-14 | Investigation of the Restricted Zone in the Superpave Aggregate Gradation Specification | Completed | |
| NCHRP 09-15 | Quality Characteristics and Test Methods for Use in Performance-Related Specifications of Hot-Mix Asphalt Pavements | Completed | |
| NCHRP 09-16 | Relationship Between Superpave Gyratory Compaction Properties and Permanent Deformation of Pavements in Service | Completed | |
| NCHRP 09-17 | Accelerated Laboratory Rutting Tests: Asphalt Pavement Analyzer | Completed | |
| NCHRP 09-18 | Field Shear Test for Hot Mix Asphalt | Completed | |
| NCHRP 09-19 | Superpave Support and Performance Models Management | Completed | |
| NCHRP 09-20 | Performance-Related Specifications for Hot-Mix Asphalt Construction | Completed | |
| NCHRP 09-21 | Advisory Structure for Superpave Implementation and Related Research | Completed | |
| NCHRP 09-22 | Beta Testing and Validation of HMA PRS | Active | The preliminary draft final report is in preparation. |
| NCHRP 09-23 | Environmental Effects in Pavement Mix and Structural Design Systems | Completed | |
| NCHRP 09-25 | Requirements for Voids in Mineral Aggregate for Superpave Mixtures | Completed | |
| NCHRP 09-26 | Precision Statements for AASHTO T312 and other Laboratory Test Methods | Completed | |
| NCHRP 09-26A | Data Mining and Interlaboratory Studies to Prepare Precision Statements for AASHTO Standard Test Methods | Active | This is a continuing project that responds to requests from the AASHTO Highway Subcommittee on Materials. |
| NCHRP 09-27 | Relationships of HMA In-Place Air Voids, Lift Thickness, and Permeability | Completed | |
| NCHRP 09-29 | Simple Performance Tester for Superpave Mix Design | Active | Work in progress on Phase VI. The final report for Phase V will be published as NCHRP Report 629 in early 2009. |
| NCHRP 09-30 | Experimental Plan for Calibration and Validation of HMA Performance Models for Mix and Structural Design | Completed | |
| NCHRP 09-30A | Calibration of Rutting Models for HMA Structural and Mix Design | Active | Work in progress. |
| NCHRP 09-31 | Air Void Requirements for Superpave Mix Design | Completed | |
| NCHRP 09-33 | A Mix Design Manual for Hot Mix Asphalt | Active | A pilot training course was presented on 27 February 2009. |
| NCHRP 09-34 | Improved Conditioning Procedure for Predicting the Moisture Susceptibility of HMA Pavements | Completed | |
| NCHRP 09-35 | Aggregate Properties and Their Relationship to the Performance of Superpave-Designed HMA: A Critical Review | Completed | |
| NCHRP 09-36 | Improved Procedure for Laboratory Aging of Asphalt Binders in Pavements | Active | Awaiting revised final report. |
| NCHRP 09-37 | Using Surface Energy Measurements To Select Materials for Asphalt Pavements | Completed | |
| NCHRP 09-38 | Endurance Limit of Hot Mix Asphalt Mixtures to Prevent Fatigue Cracking in Flexible Pavements | Active | Awaiting the revised final report. |
| NCHRP 09-39 | Procedure for Determining Mixing and Compaction Temperatures of Asphalt Binders in Hot Mix Asphalt | Active | The project panel is reviewing the preliminary draft final report. |
| NCHRP 09-40 | Optimization of Tack Coat for HMA Placement | Active | Work in progress on Phase II. |
| NCHRP 09-41 | Performance and Maintenance of Permeable Friction Courses | Completed | The project final report will be published as an NCHRP Report in mid-2009. |
| NCHRP 09-42 | History of Superpave: Documenting the Research Program and Implementation Process | Active | Awaiting the preliminary draft final report. |
| NCHRP 09-43 | Mix Design Practices for Warm Mix Asphalt | Active | Work is in progress on Phase II. The Phase I interim report is available for loan on request to NCHRP. |
| NCHRP 09-44 | Developing a Plan for Validating an Endurance Limit for HMA Pavements | Completed | |
| NCHRP 09-44A | Validating an Endurance Limit for HMA Pavements: Laboratory Experiment and Algorithm Development | Pending | |
| NCHRP 09-45 | Test Methods and Specification Criteria for Mineral Filler Used in HMA | Active | Work in progress on Phase II. |
| NCHRP 09-46 | Improved Mix Design, Evaluation, and Materials Management Practices for Hot Mix Asphalt with High Reclaimed Asphalt Pavement Content | Active | Work in progress on Phase II. |
| NCHRP 09-47 | Engineering Properties, Emissions, and Field Performance of Warm Mix Asphalt Technologies | Completed | Phase II of this project will be accomplished as NCHRP Project 9-47A. |
| NCHRP 09-47A | Properties and Performance of Warm Mix Asphalt Technologies (Re-advertisement of NCHRP Project 9-47) | Pending | |
| NCHRP 09-48 | Field versus Laboratory Volumetrics and Mechanical Properties | Active | |
| NCHRP 09-49 | Long Term Field Performance of Warm Mix Asphalt Technologies | Anticipated | |
| NCHRP 10-13 | Ultrasonic Measurement of Weld Flaw Size | Completed | |
| NCHRP 10-17 | Use of Antistripping Additives in Asphaltic Concrete Mixtures | Completed | |
| NCHRP 10-20 | Elastomeric Bearings Design, Construction, and Materials | Completed | |
| NCHRP 10-20A | High-Load, Multi-Rotational Bridge Bearings: Design, Materials, and Construction | Completed | |
| NCHRP 10-22 | The Performance of Weathering Steel in Bridges | Completed | |
| NCHRP 10-25A | Instantaneous Determination of Water-Cement Ratio in Fresh Concrete | Completed | |
| NCHRP 10-26 | Performance-Related Specifications for Hot-Mix Asphaltic Concrete | Completed | |
| NCHRP 10-27 | Determination of Asphaltic Concrete Pavement Structural Properties by Nondestructive Testing | Completed | |
| NCHRP 10-29 | Anchorage Zone Reinforcement for Post-Tensioned Concrete Girders | Completed | |
| NCHRP 10-30(3) | Nondestructive Methods for Field Inspection of Embedded or Encased High Strength Steel Rods and Cables | Completed | |
| NCHRP 10-31 | Acceptance Criteria for Steel Bridge Welds | Completed | |
| NCHRP 10-32A | Durability Testing of High-Strength Concrete Containing High-Range Water-Reducing Admixtures | Completed | |
| NCHRP 10-33 | Potential Benefits of Geosynthetics in Flexible Pavement Systems | Completed | |
| NCHRP 10-34 | Transient Protection, Grounding, and Shielding of Electronic Traffic Control Equipment | Completed | |
| NCHRP 10-35 | Fatigue Behavior of Welded and Mechanical Splices in Reinforcing Steel | Completed | |
| NCHRP 10-36 | Evaluation of Weldments Incorporating Backing Materials | Completed | |
| NCHRP 10-37 | Performance of Epoxy-Coated Reinforcing Steel in Highway Bridges | Completed | |
| NCHRP 10-37A | Performance of Epoxy-Coated Reinforcing Steel--Laboratory Testing | Completed | |
| NCHRP 10-37B | A Protocol for the Evaluation of Existing Bridges Containing Epoxy-Coated Reinforcing Steel | Completed | |
| NCHRP 10-37C | Repair and Rehabilitation of Bridge Components Containing Epoxy-Coated Reinforcement | Completed | |
| NCHRP 10-38 | Fatigue-Resistant Design of Cantilevered Signal, Sign, and Light Supports | Completed | |
| NCHRP 10-38(2) | Fatigue-Resistant Design of Cantilevered Signal, Sign, and Light Supports | Completed | |
| NCHRP 10-39 | Construction Testing and Inspection Levels | Completed | |
| NCHRP 10-39A | Testing and Inspection Levels for Hot-Mix Asphaltic Concrete Overlays | Completed | |
| NCHRP 10-40 | Plasma Arc Cutting of Bridge Steels | Completed | |
| NCHRP 10-41 | Evaluation of Unbonded Portland Cement Concrete Overlays | Completed | |
| NCHRP 10-42 | Constructibility Review Process for Transportation Facilities | Completed | |
| NCHRP 10-43 | Movable Bridge Inspection, Evaluation, and Maintenance | Completed | |
| NCHRP 10-44 | Nondestructive Testing to Determine Insitu Material Properties of Pavement Layers | Completed | |
| NCHRP 10-44A | Determination of Insitu Material Properties of Asphalt Concrete Pavement Layers | Completed | |
| NCHRP 10-45 | Procedures for Evaluating Corrosion-Inhibiting Admixtures for Structural Concrete | Completed | |
| NCHRP 10-46 | Corrosion of Steel Piling in Nonmarine Applications | Completed | |
| NCHRP 10-47 | Guidelines for Longitudinal Pavement Profile Measurement | Completed | |
| NCHRP 10-48 | Assessing Pavement Layer Condition Using Deflection Data | Completed | |
| NCHRP 10-49 | Improved Contracting Methods for Highway Construction Projects | Completed | |
| NCHRP 10-50 | Strategies for Rehabilitating Rigid Pavements Subjected to High-Traffic Volumes | Completed | |
| NCHRP 10-50A | Guidelines for Selecting Strategies for Rehabilitating Rigid Pavements Subjected to High-Traffic Volumes | Completed | |
| NCHRP 10-51 | Performance-Related Specifications for Elastomeric Bridge Bearings | Completed | |
| NCHRP 10-52 | Performance Tests for Modular Bridge Joints | Completed | |
| NCHRP 10-53 | Condition Evaluation of Prestressed Steel Strands in Concrete Bridges | Completed | |
| NCHRP 10-54 | Quality-Based Performance Rating of Contractors for Prequalification and Bidding Purposes | Completed | |
| NCHRP 10-55 | Fiber Reinforced Polymer Composites for Concrete Bridge Deck Reinforcement | Completed | |
| NCHRP 10-56 | Accelerated Pavement Testing: Data Guidelines | Completed | |
| NCHRP 10-57 | Structural Safety Evaluation Guidelines for Suspension Bridge Parallel-Wire Cables | Completed | |
| NCHRP 10-58 | Construction Engineering and Management Research Program | Completed | |
| NCHRP 10-58(01) | Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts | Active | STATUS - The PDFR is in the hands of the panel for review. |
| NCHRP 10-58(02) | Using Contractor-Performed Tests in Quality Assurance | Completed | NCHRP Research Results Digest 323: Using the Results of Contractor-Performed Tests in Quality Assurance |
| NCHRP 10-59A | Construction Specifications for Bonded Repair and Retrofit of Concrete Structures Using FRP Composites | Completed | |
| NCHRP 10-60 | Avoiding Delays in Constructing Highway Projects (CANCELED) | Completed | |
| NCHRP 10-61 | Best-Value Procurement Methods for Highway Construction Projects | Completed | NCHRP Report 561: Best-Value Procurement Methods for Highway Construction Projects |
| NCHRP 10-62 | Acceptance Tests for Surface Characteristics of Steel Strands in Pre-Stressed Concrete | Completed | The project final report is available as NCHRP Report 621. |
| NCHRP 10-63 | Heat-Straightening Repair of Damaged Steel Bridge Girders: Fatigue and Fracture Performance | Completed | The project final report is available as NCHRP Report 604. |
| NCHRP 10-64 | Field Inspection of In-Service FRP Bridge Decks | Completed | |
| NCHRP 10-65 | Nondestructive Testing Technology for Quality Control and Acceptance of Flexible Pavement Construction | Completed | The project final report is available as NCHRP Report 626, NDT Technology for Quality Assurance of HMA Pavement Construction. |
| NCHRP 10-66 | Predicting In-Service Performance of Flexible Pavements from Accelerated Pavement Testing | Completed | |
| NCHRP 10-67 | Texturing of Concrete Pavements | Completed | |
| NCHRP 10-68 | Guidelines for the Use of Highway Pavement Warranties | Active | Status - PDFR is in the hands of the panel for review. |
| NCHRP 10-69 | Guidelines for Dowel Alignment in Concrete Pavements | Completed | |
| NCHRP 10-70 | Cost-Effective Connection Details for Highway Sign, Luminaire, and Traffic Signal Structures | Active | PI requested 12-month contract extension without additional fund |
| NCHRP 10-71 | Evaluation of CIP Reinforced Joints for Full-Depth Precast Concrete Bridge Decks | Active | |
| NCHRP 10-72 | Bridge Deck Design Criteria and Testing Procedures | Active | |
| NCHRP 10-73 | Guide Specification for the Design of Externally Bonded FRP Systems for Repair and Strengthening of Concrete Bridge Elements | Active | |
| NCHRP 10-74 | Development of Fatigue Loading and Design Methodology for High-Mast Lighting Poles | Active | |
| NCHRP 10-75 | Guide for Pavement-Type Selection | Active | |
| NCHRP 10-76 | Methodologies for Evaluating Pavement Strategies and Barriers for Noise Mitigation | Active | |
| NCHRP 10-77 | Use of Automated Machine Guidance (AMG) within the Transportation Industry | Pending | |
| NCHRP 10-78 | Nighttime Construction Impacts on Safety, Quality, and Productivity | Pending | |
| NCHRP 10-79 | Guidelines for Quality-Related Pay Adjustment Factors for Pavements | Active | |
| NCHRP 10-80 | Conversion of the AASHTO 'Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals' to the Load and Resistance Factor Design (LRFD) Methodology | Anticipated | |
| NCHRP 10-81 | Evaluation of Fuel Usage Factors in Highway Construction | Anticipated | |
| NCHRP 10-82 | Performance Related Specifications (PRS) for Pavement Preservation Treatments | Anticipated | |
| NCHRP 10-83 | Alternative Quality Systems for Application in Highway Construction | Anticipated | |
| NCHRP 11-07 | National Data-Management System for Highway Tort Claims | Completed | |
| NCHRP 12-15(5) | Fatigue Behavior of Variable Loaded Bridge Details Near the Fatigue Limit | Completed | |
| NCHRP 12-23 | Recommended Revisions to the AASHTO Manual for Maintenance Inspection of Bridges | Completed | |
| NCHRP 12-26(2) | Distribution of Wheel Loads on Highway Bridges | Completed | |
| NCHRP 12-27 | Welded Repair of Cracks in Steel Bridge Members | Completed | |
| NCHRP 12-28(01) | Load Capacity Evaluation of Existing Bridges | Completed | |
| NCHRP 12-28(02) | Bridge Management Systems | Completed | |
| NCHRP 12-28(02)A | Bridge Management Systems Software | Completed | |
| NCHRP 12-28(02)B | Bridge Management Systems Software | Completed | |
| NCHRP 12-28(02)C | Conversion of BRIDGIT Bridge Management Software to Windows | Completed | |
| NCHRP 12-28(03) | Fatigue Evaluation Procedures for Steel Bridges | Completed | |
| NCHRP 12-28(06) | Distortion-Induced Fatigue Cracking in Steel Bridges | Completed | |
| NCHRP 12-28(07) | Guidelines for Evaluating Corrosion Effects in Existing Steel Bridges | Completed | |
| NCHRP 12-28(10) | Guidelines for Determining Redundancy in Steel Bridges | Completed | |
| NCHRP 12-28(11) | Development of Site-Specific Load Models for Bridge Rating | Completed | |
| NCHRP 12-28(12) | Inelastic Rating Procedures for Steel Beam and Girder Bridges | Completed | |
| NCHRP 12-28(13) | Nondestructive Load Testing for Bridge Evaluation and Rating | Completed | |
| NCHRP 12-28(13)A | Bridge Rating Through Nondestructive Load Testing | Completed | |
| NCHRP 12-29 | Design of Simple-Span Precast Prestressed Bridge Girders Made Continuous | Completed | |
| NCHRP 12-30 | Fatigue of Cables in Cable-Stayed Bridges | Completed | |
| NCHRP 12-31 | Notch Toughness Variability in Bridge Steel Plates | Completed | |
| NCHRP 12-33 | Development of a Comprehensive Bridge Specification and Commentary | Completed | |
| NCHRP 12-33A | Development of a Comprehensive Bridge Specification and Commentary---Timber Structures and Code Calibration | Completed | |
| NCHRP 12-33B | Development of a Comprehensive Bridge Specification and Commentary---Concrete Structures | Completed | |
| NCHRP 12-33C | Development of a Comprehensive Bridge Specification and Commentary---Soil-Structure Interaction Systems | Completed | |
| NCHRP 12-34 | Update of AASHTO Standard Specifications for Highway Bridges: Division II---Construction | Completed | |
| NCHRP 12-35 | Recommended Specifications for the Design of Foundations, Retaining Walls, and Substructures | Completed | |
| NCHRP 12-36 | Redundancy in Highway Bridge Superstructures | Completed | |
| NCHRP 12-36(2) | Redundancy in Highway Bridge Superstructures: Phase 2 | Completed | |
| NCHRP 12-37 | Transverse Cracking in Newly Constructed Bridge Decks | Completed | |
| NCHRP 12-38 | Improved Design Specifications for Horizontally Curved Steel Girder Highway Bridges | Completed | |
| NCHRP 12-39 | Design Specifications for Debris Forces on Highway Bridges | Completed | |
| NCHRP 12-40 | Fatigue Criteria for Modular Bridge Expansion Joints | Completed | |
| NCHRP 12-41 | Rapid Replacement of Bridge Decks | Completed | |
| NCHRP 12-42 | LRFD Bridge Design Specifications Support | Completed | |
| NCHRP 12-43 | Life-Cycle Cost Analysis for Bridges | Completed | |
| NCHRP 12-44 | Recommended Specifications for the Design of Movable Highway Bridges | Completed | |
| NCHRP 12-45 | Recommended Specifications for Large-Span Culverts | Completed | |
| NCHRP 12-46 | Manual for Condition Evaluation and Load Rating of Highway Bridges Using Load and Resistance Factor Philosophy | Completed | |
| NCHRP 12-47 | Redundancy in Highway Bridge Substructures | Completed | |
| NCHRP 12-48 | Design of Highway Bridges for Extreme Events | Completed | |
| NCHRP 12-49 | Comprehensive Specification for the Seismic Design of Bridges | Completed | |
| NCHRP 12-50 | Bridge Software-Validation Guidelines and Examples | Completed | |
| NCHRP 12-51 | Effect of Truck Weight on Bridge Network Costs | Completed | |
| NCHRP 12-52 | LRFD Specifications for Horizontally Curved Steel Girder Highway Bridges | Completed | |
| NCHRP 12-53 | Connection Between Simple-Span Precast Concrete Girders Made Continuous | Completed | |
| NCHRP 12-54 | Integral Connections of Steel Bridge Structures | Completed | |
| NCHRP 12-55 | Load and Resistance Factors for Earth Pressures on Bridge Substructures and Retaining Walls | Completed | |
| NCHRP 12-55A | Load and Resistance Factors for Earth Pressures on Bridge Substructures and Retaining Walls | Completed | |
| NCHRP 12-56 | Application of the LRFD Bridge Design Specifications to High-Strength Structural Concrete: Shear Provisions | Completed | |
| NCHRP 12-57 | Extending Span Ranges of Precast, Prestressed Concrete Girders | Completed | |
| NCHRP 12-58 | Effective Slab Width for Composite Steel Bridge Members | Completed | |
| NCHRP 12-59 | Design and Construction of Geosynthetic-Reinforced Soil (GRS) Abutments for Bridge Support | Completed | NCHRP Report 556: Design and Construction Guidelines for Geosynthetic-Reinforced Soil Bridge Abutments with a Flexible Facing |
| NCHRP 12-59(01) | Seismic Design of Geosynthetic-Reinforced Soil (GRS) Bridge Abutments with Flexible Facing | Active | |
| NCHRP 12-60 | Transfer, Development, and Splice Length for Strand/Reinforcement in High-Strength Concrete | Completed | |
| NCHRP 12-61 | Simplified Shear Design of Structural Concrete Members | Completed | |
| NCHRP 12-62 | Simplified Live-Load Distribution-Factor Equations | Completed | |
| NCHRP 12-62A | Simplified Live Load Distribution-Factor Equations-Phase II | Completed | |
| NCHRP 12-63 | Legal Truck Loads and AASHTO Legal Loads for Posting | Completed | |
| NCHRP 12-64 | Application of the LRFD Bridge Design Specifications to High-Strength Structural Concrete: Flexure and Compression Provisions | Completed | |
| NCHRP 12-65 | Full-Depth, Precast-Concrete Bridge Deck Panel Systems | Completed | |
| NCHRP 12-66 | AASHTO LRFD Specifications for Serviceability in the Design of Bridge Foundations | Active | *The work described here was not completed; the contract has been terminated. Revision or the work plan and remedial action are pending. |
| NCHRP 12-67 | Multiple-Objective Optimization for Bridge Management Systems | Completed | |
| NCHRP 12-68 | Improved Rotational Limits of Elastomeric Bearings | Completed | |
| NCHRP 12-69 | Design and Construction Guidelines for Long-Span Decked Precast, Prestressed Concrete Girder Bridges | Active | |
| NCHRP 12-70 | Seismic Analysis and Design of Retaining Walls, Buried Structures, Slopes, and Embankments | Final | |
| NCHRP 12-71 | Design Specifications and Commentary for Horizontally Curved Concrete Box-Girder Highway Bridges | Completed | |
| NCHRP 12-72 | Blast-Resistant Highway Bridges: Design and Detailing Guidelines | Active | Completed, publication decision pending |
| NCHRP 12-73 | Design Guidelines for Durability of Bonded CFRP Repair/Strengthening of Concrete Beams | Completed | |
| NCHRP 12-74 | Development of Precast Bent Cap Systems for Seismic Regions(Posted 2/17/05) | Active | |
| NCHRP 12-75 | Design of FRP Systems for Strengthening Concrete Girders in Shear | Active | |
| NCHRP 12-76 | Protocols for Collecting and Using Traffic Data in Bridge Design | Completed | Web-Only Document |
| NCHRP 12-77 | Structural Concrete Design with High-Strength Steel Reinforcement | Active | |
| NCHRP 12-78 | Evaluation of Load Rating by Load and Resistance Factor Rating | Active | |
| NCHRP 12-79 | Guidelines for Analytical Methods and Erection Engineering of Curved and Skewed Steel Deck-Girder Bridges | Active | |
| NCHRP 12-80 | LRFD Minimum Flexural Reinforcement Requirements | Active | |
| NCHRP 12-81 | Evaluation of Fatigue on the Serviceability of Highway Bridges | Active | |
| NCHRP 12-82 | Developing Reliability-Based Bridge Inspection Practices | Active | Research in progress |
| NCHRP 12-83 | Calibration of LRFD Concrete Bridge Design Specifications for Serviceability | Active | Research in progress |
| NCHRP 12-84 | Guidelines for the Load and Resistance Factor Design and Rating of Riveted, Bolted, and Welded Gusset-Plate Connections for Steel Bridges | Active | |
| NCHRP 12-85 | Roadway Bridges Fire Hazard Assessment | Anticipated | |
| NCHRP 12-86 | Bridge System Safety and Redundancy | Anticipated | |
| NCHRP 13-02 | Guidelines for Selection and Application of Warning Lights on Roadway-Operations Equipment | Completed | |
| NCHRP 13-03 | Decision Making for Outsourcing and Privatization of Vehicle and Equipment Fleet Maintenance | Active | |
| NCHRP 14-07 | Interactive Microcomputer Network for Innovative Maintenance Operations | Completed | |
| NCHRP 14-08 | Chip Seal Coats for High-Traffic-Volume Asphalt Concrete Pavements | Completed | |
| NCHRP 14-08A | Chip Seal Coats for High-Traffic-Volume Asphalt Concrete Pavements | Completed | |
| NCHRP 14-09(1) | Effective Maintenance Budget Strategies | Completed | |
| NCHRP 14-09(2) | Incorporation of Maintenance Considerations in Highway Design | Completed | |
| NCHRP 14-09(3) | Maintenance Contracting | Completed | |
| NCHRP 14-09(4) | Role of Highway Maintenance in Integrated Management Systems | Completed | |
| NCHRP 14-09(5) | Impacts of Environmental, Health, and Safety Regulations on Highway Maintenance | Completed | |
| NCHRP 14-09(6) | Professional Development of Maintenance Engineers and Managers | Completed | |
| NCHRP 14-10 | Improvements in Data Acquisition Technology for Maintenance Management Systems | Completed | |
| NCHRP 14-11 | Effective Motivation of Highway Maintenance Personnel | Completed | |
| NCHRP 14-11(2) | Enhancement to Program for Effective Motivation of Highway Maintenance Personnel | Completed | |
| NCHRP 14-12 | Highway Maintenance Quality Assurance | Completed | |
| NCHRP 14-13 | Customer-Driven Benchmarking for Highway Maintenance Activities | Completed | |
| NCHRP 14-14 | Guide for Optimal Timing of Pavement Preventive Maintenance Treatment Applications | Completed | |
| NCHRP 14-15 | Developing a National Database System for Maintenance Actions on Highway Bridges | Active | |
| NCHRP 14-16 | Guidelines for Vegetation Management | Active | The preliminary draft final report has been received and is under review. |
| NCHRP 14-17 | Manual for Emulsion-Based Chip Seals for Pavement Preservation | Active | |
| NCHRP 14-18 | Determining Highway Maintenance Costs | Active | |
| NCHRP 14-20 | Quantifying the Costs and Risks of Delayed Maintenance | Anticipated | |
| NCHRP 14-21 | Optimization of Resource Allocation for Highway Preservation Needs | Anticipated | |
| NCHRP 14-22 | Effective Removal of Pavement Markings | Anticipated | |
| NCHRP 15-10 | Development of a Design/Graphics Interface System | Completed | |
| NCHRP 15-11 | Computer-Aided Analysis of Highway Encroachments on Mobile Boundary Streams | Completed | |
| NCHRP 15-11A | BRI-STARS Maintenance Support and Enhancement | Completed | |
| NCHRP 15-12 | Roadway Widths for Low Traffic Volume Roads | Completed | |
| NCHRP 15-13 | Long-Term Performance of Geosynthetics in Drainage Applications | Completed | |
| NCHRP 15-14(1) | Intersection Sight Distance | Completed | |
| NCHRP 15-14(2) | Median Intersection Design | Completed | |
| NCHRP 15-15 | Collection and Presentation of Roadway Inventory Data | Completed | |
| NCHRP 15-16 | Superelevation Distribution Methods and Transition Designs | Completed | |
| NCHRP 15-16A | Superelevation Distribution Methods and Transition Designs | Completed | |
| NCHRP 15-17 | Geometric Design Consistency on Higher-Speed, Non-Urban, Two-Lane Roads | Completed | |
| NCHRP 15-18 | Design Speed and Operating Speed | Completed | |
| NCHRP 15-19 | Application of Context-Sensitive Design Principles | Completed | |
| NCHRP 15-20 | Planning, Design, and Operation of Pedestrian Facilities | Completed | |
| NCHRP 15-21 | Review of Truck Characteristics as Factors in Roadway Design | Completed | |
| NCHRP 15-22 | Safety Consequences of Flexibility in Highway Design | Completed | |
| NCHRP 15-23 | Recommended Unit Conversions and Updates of the AASHTO Model Drainage Manual and Highway Drainage Guidelines | Completed | Status - Updated versions of the AASHTO Highway Drainage Guidelines and the AASHTO Model Drainage Guidelines delivered to AASHTO |
| NCHRP 15-24 | Hydraulic Loss Coefficients for Culverts | Active | Status - Partial draft final report in hands of panel |
| NCHRP 15-25 | Alternatives to Design Speed for Selection of Roadway Design Criteria | Active | |
| NCHRP 15-26 | Passing Sight Distance Criteria | Final | |
| NCHRP 15-27 | Safety Impacts of Design Element Trade-Offs | Completed | The final report is available as NCHRP Report 633. |
| NCHRP 15-28 | Modernize and Upgrade CANDE for Analysis and Design of Buried Structures | Completed | |
| NCHRP 15-29 | Design Specifications for Live Load Distribution to Buried Structures | Active | A contract extension is being processed. Revised final report is expected in Feb. 2009 |
| NCHRP 15-30 | Median Intersection Design for Rural High-Speed Divided Highways | Completed | |
| NCHRP 15-31 | Design Guidance for Freeway Mainline Ramp Terminals | Completed | Continued as NCHRP 15-31A |
| NCHRP 15-31A | Design Guidance for Freeway Mainline Ramp Terminals | Active | |
| NCHRP 15-32 | Context Sensitive Solutions: Quantification of the Benefits in Transportation | Active | The project panel is reviewing the preliminary draft final report. |
| NCHRP 15-33 | Guide for Transportation Landscape and Environmental Design | Active | The preliminary draft final report has been received and is under review. |
| NCHRP 15-34 | Performance-Based Analysis of Geometric Design of Highways and Streets | Active | The interim meeting was held on Feb. 5, 2007. |
| NCHRP 15-35 | Geometric Design of Driveways | Active | Status - proposed draft final report in the panel's hands for review, |
| NCHRP 15-36 | Estimating Joint Probabilities of Design Coincident Flows at Stream Confluences | Active | Working on Phase II |
| NCHRP 15-37 | Revising the AASHTO Guide for the Development of Bicycle Facilities | Active | The preliminary draft final report has been received and is now under review. |
| NCHRP 15-38 | Structural Design Requirements for Culvert Joints | Active | |
| NCHRP 15-39 | Superelevation Criteria for Sharp Horizontal Curves on Steep Grades | Anticipated | |
| NCHRP 15-40 | Designing the Roadway Transition from Rural Highways to Urban/Suburban Highways or Streets | Anticipated | |
| NCHRP 15-41 | Updated Headlamp Design Criteria for Sag Vertical Curves | Anticipated | |
| NCHRP 15-42 | Use of Bicycle Lanes for Various Roadway Characteristics | Anticipated | |
| NCHRP 16-04 | Design Guidelines for Safe and Aesthetic Roadside Treatments in Urban Areas | Completed | |
| NCHRP 16-05 | Development of Cost-Effective Treatments of Roadside Ditches to Reduce the Number and Severity of Roadside Crashes | Anticipated | |
| NCHRP 17-06A | Service Vehicle Lighting and Traffic Control Systems for Short-Term and Moving Work Zones (Phase II) | Completed | |
| NCHRP 17-07 | Guidelines for Converting STOP to YIELD Control at Intersections | Completed | |
| NCHRP 17-08 | Traffic Barrier and Control Treatments for Restricted Work Zones | Completed | |
| NCHRP 17-09 | Effect of Highway Standards on Safety | Completed | |
| NCHRP 17-09(2) | Impacts of Resurfacing Projects With and Without Additional Safety Improvements | Completed | |
| NCHRP 17-10 | Structural Supports for Highway Signs, Luminaires, and Traffic Signals | Completed | |
| NCHRP 17-10(2) | Structural Supports for Highway Signs, Luminaires, and Traffic Signals | Completed | |
| NCHRP 17-11 | Determination of Safe/Cost Effective Roadside Slopes and Associated Clear Distances | Completed | |
| NCHRP 17-12 | Improved Safety Information to Support Highway Design | Completed | |
| NCHRP 17-13 | Strategic Plan for Improving Roadside Safety | Completed | |
| NCHRP 17-14 | Improved Guidelines for Median Safety | Active | |
| NCHRP 17-15 | Accident Mitigation on Congested Rural and Exurban Two- and Three-Lane Highways | Completed | |
| NCHRP 17-16 | Accident Warrant for Traffic Signals | Completed | |
| NCHRP 17-17 | Development of Guidelines for Nighttime Road Work to Improve Safety and Operations | Completed | |
| NCHRP 17-17(2) | Development of Guidelines for Nighttime Road Work to Improve Safety and Operations | Completed | |
| NCHRP 17-18 | AASHTO Strategic Highway Safety Plan Implementation Support | Completed | |
| NCHRP 17-18(02) | Web Site Development | Completed | |
| NCHRP 17-18(03) | Guidance for Implementation of the AASHTO Strategic Highway Safety Plan | Active | |
| NCHRP 17-18(04) | Highway Safety Manual | Completed | |
| NCHRP 17-18(05) | Integrated Management Process to Reduce Highway Injuries and Fatalities Statewide | Completed | |
| NCHRP 17-18(05)B | Integrated Safety Management Process - Technical Support | Completed | |
| NCHRP 17-18(07) | AASHTO Strategic Highway Safety Plan--Technology Transfer Plan | Completed | |
| NCHRP 17-18(08) | Comprehensive Human Factors Guidelines for Road Systems | Completed | |
| NCHRP 17-18(09)A | Coordination of Safety Research | Completed | |
| NCHRP 17-18(10) | Safe Landscape Awareness Course | Completed | |
| NCHRP 17-18(11) | Implementation Plan and Products | Completed | |
| NCHRP 17-18(14) | Lane Departure Video | Completed | |
| NCHRP 17-20 | Technical Support for the AASHTO Task Force on Roadside Safety (TFRS) | Completed | |
| NCHRP 17-21 | Safety of U-Turns at Unsignalized Median Openings | Completed | |
| NCHRP 17-22 | Identification of Vehicular Impact Conditions Associated with Serious Ran-Off-Road Crashes | Active | |
| NCHRP 17-23 | Safety Impacts and Other Implications of Raised Speed Limits on High-Speed Roads | Completed | |
| NCHRP 17-24 | Use of Event Data Recorder (EDR) Technology for Roadside Crash Data Analysis | Completed | |
| NCHRP 17-25 | Crash Reduction Factors for Traffic Engineering and ITS Improvements | Completed | |
| NCHRP 17-26 | Methodology to Predict the Safety Performance of Urban and Suburban Arterials | Completed | |
| NCHRP 17-27 | Parts I and II of the Highway Safety Manual | Completed | |
| NCHRP 17-28 | Pavement Marking Materials and Markers: Safety Impact and Cost-Effectiveness | Completed | |
| NCHRP 17-29 | Methodology to Predict the Safety Performance of Rural Multilane Highways | Completed | |
| NCHRP 17-30 | Traffic Safety Evaluation of Nighttime and Daytime Work Zones | Completed | |
| NCHRP 17-31 | Human Factors Guidelines for Road Systems--Phase 2 | Completed | |
| NCHRP 17-32 | Guidance for the Design and Application of Shoulder and Centerline Rumble Strips | Completed | |
| NCHRP 17-33 | Effectiveness of Behavioral Highway Safety Countermeasures | Completed | |
| NCHRP 17-34 | Prepare Parts IV and V of the Highway Safety Manual | Completed | |
| NCHRP 17-35 | Evaluation of Safety Strategies at Signalized Intersections | Active | |
| NCHRP 17-36 | Production of the First Edition of the Highway Safety Manual | Active | |
| NCHRP 17-37 | Pedestrian Predictive Crash Methodology for Urban and Suburban Arterials | Completed | |
| NCHRP 17-38 | Highway Safety Manual Implementation and Training Materials | Active | |
| NCHRP 17-40 | Model Curriculum for Highway Safety Core Competencies | Active | |
| NCHRP 17-41 | Human Factors Guidelines for Road Systems - Phase III | Active | |
| NCHRP 17-42 | Development of Information and Data to Support Improved Safety Management and Communication of Safety Needs | Active | |
| NCHRP 17-43 | Long-Term Roadside Crash Data Collection Program | RFP | |
| NCHRP 17-44 | Factors Contributing to Median Encroachments and Cross-Median Crashes | Active | Just underway |
| NCHRP 17-45 | Enhanced Safety Prediction Methodology and Analysis Tool for Freeways and Interchanges | Active | |
| NCHRP 17-46 | Comprehensive Analysis Framework for Safety Investment Decisions | Anticipated | |
| NCHRP 17-47 | Human Factors Guidelines for Road Systems-Phase IV | Anticipated | |
| NCHRP 17-48 | Development of a Strategic National Highway Infrastructure Safety Research Agenda | Anticipated | |
| NCHRP 18-03 | Silica Fume Concrete for Bridge Decks | Completed | |
| NCHRP 18-04A | Durability of "Early-Opening-to-Traffic" Portland Cement Concrete for Pavement Rehabilitation: Background and Plan for Evaluation | Completed | |
| NCHRP 18-04B | Durability of "Early-Opening-to-Traffic" Portland Cement Concrete for Pavement Rehabilitation | Completed | |
| NCHRP 18-05 | Relationship of Portland Cement Characteristics to Concrete Durability | Completed | |
| NCHRP 18-06 | Service Life of Corrosion-Damaged Reinforced Concrete Bridge Superstructure Elements | Completed | |
| NCHRP 18-06A | Service Life of Corrosion-Damaged Reinforced Concrete Bridge Superstructure Elements | Completed | |
| NCHRP 18-07 | Prestress Losses in Pretensioned High-Strength Concrete Bridge Girders | Completed | |
| NCHRP 18-08 | Supplementary Cementitious Materials to Enhance Durability of Concrete Bridge Decks | Completed | |
| NCHRP 18-08A | Supplementary Cementitious Materials to Enhance Durability of Concrete Bridge Decks | Completed | |
| NCHRP 18-09A | Guidelines for Reducing Premature Deterioration of Hydraulic Cement Concrete Pavements: Background and Research Plan | Completed | |
| NCHRP 18-10 | Procedures for Evaluating Air-Entraining Admixtures for Highway Concrete | Completed | |
| NCHRP 18-11 | Improved Specifications and Protocols for Acceptance Tests on Processing Additions in Cement Manufacturing | Completed | |
| NCHRP 18-12 | Self-Consolidating Concrete for Precast, Prestressed Concrete Bridge Elements | Completed | |
| NCHRP 18-13 | Specifications and Protocols for Acceptance Tests of Fly Ash Used in Highway Concrete | Active | |
| NCHRP 18-14 | Evaluation and Repair Procedures for Precast/Prestressed Concrete Girders with Longitudinal Cracking in the Web | Active | |
| NCHRP 18-15 | High-Performance/High-Strength Lightweight Concrete for Bridge Girders and Decks | Active | |
| NCHRP 19-04 | A Review of DOT Compliance with GASB 34 Requirements | Completed | |
| NCHRP 19-05 | Assessing and Mitigating Future Impacts to the Federal Highway Trust Fund such as Alternative Fuel Consumption | Active | |
| NCHRP 19-06 | Identifying and Quantifying Rates of State Motor Fuel Tax Evasion | Completed | |
| NCHRP 19-07 | GASB 34--Methods for Condition Assessment and Preservation | Final | |
| NCHRP 19-08 | Costs of Alternative Revenue-Generation Systems | Active | |
| NCHRP 19-09 | Truck Tolling - The Role of Freight Markets and Industry Characteristics in Decision Making | Anticipated | |
| NCHRP 20-05 | Synthesis of Information Related to Highway Problems | Active | |
| NCHRP 20-06 | Legal Problems Arising out of Highway Programs | Active | |
| NCHRP 20-07 | Research for AASHTO Standing Committee on Highways | Active | |
| NCHRP 20-07/Task 001 | The Development of a Cost-Effectiveness Approach to the Programming of Roadside Safety Improvements | Completed | Completed---Published as NCHRP Report 148 |
| NCHRP 20-07/Task 002 | The Relation of Side-Slope Design to Highway Safety | Completed | Completed---Published as NCHRP Report 158 |
| NCHRP 20-07/Task 003 | The Development of an Effective Earth-Berm Vehicle Deflector | Completed | Completed---Summarized in NCHRP Research Results Digest 77 |
| NCHRP 20-07/Task 004 | Lateral Acceleration and Lateral Tire-Pavement Forces in a Vehicle Traversing Curves Relating to Available Pavement Skid-Resistant Measures | Completed | Completed---Summarized in NCHRP Research Results Digest 55 |
| NCHRP 20-07/Task 005 | Effect of Curb Geometry and Location | Completed | Completed---Published as NCHRP Report 150 |
| NCHRP 20-07/Task 006 | Development of Impact Attenuators Utilizing Waste Materials | Completed | Completed---Published as NCHRP Report 157 |
| NCHRP 20-07/Task 007 | Safety at Narrow Bridge Sites | Completed | Completed---Published as NCHRP Report 203 |
| NCHRP 20-07/Task 008 | Energy and Transportation Systems | Completed | |
| NCHRP 20-07/Task 009 | Review of Highway Management Studies Co-Sponsored by AASHTO and HUFSAM | Completed | |
| NCHRP 20-07/Task 010 | Review of Vehicle Weight/Horsepower Ratio as Related to Passing-Lane Design Criteria | Completed | |
| NCHRP 20-07/Task 011 | Longitudinal Occupancy of Freeways by Utilities | Completed | |
| NCHRP 20-07/Task 012 | Guidelines for Citizen Participation in Transportation Planning | Completed | |
| NCHRP 20-07/Task 013 | Guidelines for Safety Criteria for Low-Volume Roads | Completed | Completed---Published as NCHRP Report 214 |
| NCHRP 20-07/Task 014 | A Policy on Geometric Design of Highways and Streets | Completed | |
| NCHRP 20-07/Task 015 | Development of a Simplified Pavement Management System | Completed | Completed---Published as NCHRP Report 215 |
| NCHRP 20-07/Task 016 | Regulation of Movement of Hazardous Cargoes | Completed | |
| NCHRP 20-07/Task 017 | Evaluation of AASHO Road Test Satellite and Environmental Studies | Completed | |
| NCHRP 20-07/Task 018 | Standard Specifications for Highway Bridges | Completed | |
| NCHRP 20-07/Task 019 | The Engineering Aspects of Highway Traffic Safety in an Age of Limited Resources | Completed | |
| NCHRP 20-07/Task 020 | Vehicle Acceleration and Deceleration Characteristics | Completed | |
| NCHRP 20-07/Task 021 | Need for Pavement Markings on Low-Volume Roads | Completed | |
| NCHRP 20-07/Task 022 | Encasement of Pipelines Through Highway and Railroad Roadbeds | Completed | |
| NCHRP 20-07/Task 023 | Contracting Practices and Payment Procedures | Completed | |
| NCHRP 20-07/Task 024 | AASHTO Pavement Design Guide | Completed | |
| NCHRP 20-07/Task 025 | STRS Support Task | Completed | |
| NCHRP 20-07/Task 026 | Research and Development Needs in Construction Engineering Management | Completed | |
| NCHRP 20-07/Task 027 | Relationships Between Vehicle Configurations and Highway Design | Completed | |
| NCHRP 20-07/Task 028 | AASHTO Guide for Design of Pavement Structures - Training Program | Completed | |
| NCHRP 20-07/Task 029 | Pavement Roughness and Rideability - Field Evaluation | Completed | |
| NCHRP 20-07/Task 030 | Manual on Subsurface Investigations | Completed | |
| NCHRP 20-07/Task 031 | Development of Comprehensive Bridge Specifications and Commentary | Completed | |
| NCHRP 20-07/Task 032 | Design and Construction Specifications for Segmental Concrete Bridges | Completed | |
| NCHRP 20-07/Task 033 | AASHTO Evaluation of FHWA Research Program | Completed | |
| NCHRP 20-07/Task 034 | AASHTO/AWS Bridge Welding Code Commentary and Draft Fracture Control Plan | Completed | |
| NCHRP 20-07/Task 035 | Review of Traffic Signal Intensity Standards | Completed | |
| NCHRP 20-07/Task 036 | Assessment of Research on High Pressure Truck Tires - Pavement Performance Interaction | Completed | |
| NCHRP 20-07/Task 037 | Development of an Asphalt Paving Handbook | Completed | |
| NCHRP 20-07/Task 038 | AASHTO Guidelines for Pavement Management Systems | Completed | |
| NCHRP 20-07/Task 039 | Revision of AASHTO Pavement Overlay Design Procedures | Completed | |
| NCHRP 20-07/Task 040 | AASHTO Contribution to Support of the Highway Research Coordinating Council | Completed | |
| NCHRP 20-07/Task 041 | AASHTO Guide for Recruitment and Retention of Transportation Professionals | Completed | |
| NCHRP 20-07/Task 042 | Truck Size and Weight Research and Policy | Completed | |
| NCHRP 20-07/Task 043 | Revision of the AASHTO Policy on Geometric Design of Highways and Streets | Completed | Task cancelled |
| NCHRP 20-07/Task 044 | Division 100 Revision of the AASHTO Guide Specifications for Highway Construction | Completed | |
| NCHRP 20-07/Task 045 | Revision to the AASHTO | Completed | |
| NCHRP 20-07/Task 046 | AASHTO Guidelines for Bridge Management Systems | Completed | Completed---Summarized in NCHRP Research Results Digest 186 |
| NCHRP 20-07/Task 047 | Support for the Joint Committee on Truck Size and Weight | Completed | |
| NCHRP 20-07/Task 048 | Development of a System for the Uniform Location of Subject Matter Within Standard Specifications | Completed | |
| NCHRP 20-07/Task 049 | Follow-up on USA Asphalt Study Tour of Europe | Completed | |
| NCHRP 20-07/Task 050 | White Paper on the Feasibility of Longer Combination Vehicles (LCV) | Completed | |
| NCHRP 20-07/Task 051 | Synthesis of the Impacts of Truck Size and Weight on the Transportation System and the Economy | Completed | |
| NCHRP 20-07/Task 052 | Support for the Joint Committee on Domestic Freight Policy | Completed | |
| NCHRP 20-07/Task 053 | Profilograph Limitations, Correlation, and Calibration for Effective Performance Based Specifications | Completed | |
| NCHRP 20-07/Task 054 | Impacts of Conversion to the Metric System | Completed | |
| NCHRP 20-07/Task 055 | Support for National Quality Initiatives | Completed | |
| NCHRP 20-07/Task 056 | Review of AASHTO | Completed | |
| NCHRP 20-07/Task 057 | Joint Task Force on Pavements' Workshop on SHRP LTPP Data and Analysis | Completed | |
| NCHRP 20-07/Task 058 | Information and Evaluation of Asphalt Rubber Research | Completed | |
| NCHRP 20-07/Task 059 | Transportation Investment and Economic Expansion: Case Studies | Completed | |
| NCHRP 20-07/Task 060 | Support for Implementing the Clean Air Act Amendments of 1990 | Completed | |
| NCHRP 20-07/Task 061 | Assessment of AASHTO Needs for Metric Conversions & Design of Metrication Clearinghouse | Completed | |
| NCHRP 20-07/Task 062 | Rewrite of AASHTO Construction Guide Specifications into Imperative Mood and Metric | Completed | |
| NCHRP 20-07/Task 063 | Development of a Manual for State Transportation Research | Completed | |
| NCHRP 20-07/Task 064 | Review and Update of the AASHTO Guide for Bridge Maintenance Management, the AASHTO Manual for Bridge Maintenance, and the AASHTO Maintenance Manual | Completed | Completed |
| NCHRP 20-07/Task 065 | Recommended Practices for Sampling, Handling, and Testing of Pavement Samples | Completed | |
| NCHRP 20-07/Task 066 | Development and Training of Pavement Engineering Personnel | Completed | Completed |
| NCHRP 20-07/Task 067 | AASHTO Publications in CD-ROM Format | Completed | Completed |
| NCHRP 20-07/Task 068 | Polyethylene Pipe Specifications | Completed | |
| NCHRP 20-07/Task 069 | Recommended Revisions to Construction Specifications for Highway Bridges | Completed | Completed |
| NCHRP 20-07/Task 070 | Developing Commentary for the ANSI / AASHTO / AWS D1.5-95 Bridge Welding Code Including the Fracture Control Plan | Completed | Completed |
| NCHRP 20-07/Task 071 | Co-Sponsorship of Winter Maintenance Program | Completed | Completed |
| NCHRP 20-07/Task 072 | Materials Characterization for Input to AASHTO Guide for Design of Pavement Structures | Completed | |
| NCHRP 20-07/Task 073 | High Strength Metric Fasteners for Bridge Applications | Completed | Task cancelled |
| NCHRP 20-07/Task 074 | Manual for Scientific Inquiry into Transportation Problems: Research Methodologies | Completed | |
| NCHRP 20-07/Task 075 | Geometric and Roadside Safety for Very Low Volume Roads | Completed | Completed |
| NCHRP 20-07/Task 076 | Installation of Fiber Optic Facilities on Highway and Freeway Rights of Way | Completed | |
| NCHRP 20-07/Task 077 | Improved Pavement Design Workshop | Completed | |
| NCHRP 20-07/Task 078 | Developing a Measurement System for the AASHTO/TRAC Program | Completed | Completed |
| NCHRP 20-07/Task 079 | Incorporating Canadian Projects into TRIS | Completed | Completed |
| NCHRP 20-07/Task 080 | Information Clearinghouse for Continuous Quality Improvement | Completed | Completed |
| NCHRP 20-07/Task 081 | Effect of Headlamp Design on Retroreflective Signs and Pedestrian Safety | Completed | Completed |
| NCHRP 20-07/Task 082 | Enhancement to the Special Products Evaluation List | Completed | |
| NCHRP 20-07/Task 083 | Guide for Snow and Ice Control | Completed | Completed |
| NCHRP 20-07/Task 084 | Developing a Model for Effective Transfer of Innovative Technologies | Completed | |
| NCHRP 20-07/Task 085 | Report on Forum on Economic Returns of Transportation Investments | Completed | |
| NCHRP 20-07/Task 086 | Potential Credit Reform: Accessing Unobligated Highway Trust Fund Balances | Completed | Completed |
| NCHRP 20-07/Task 087 | Investigate the Need for Research on the Performance of Portland Cement Concrete | Completed | Completed |
| NCHRP 20-07/Task 088 | LRFD Specifications for Retaining Walls | Completed | Completed |
| NCHRP 20-07/Task 089 | LRFD Specifications for Plastic Pipe and Culverts | Completed | Completed---Published as NCHRP Report 438 |
| NCHRP 20-07/Task 090 | The Next Generation of TRAC PAC - A Hands-On Educational Program | Completed | Completed |
| NCHRP 20-07/Task 091 | Transportation Implications of Proposed Changes to the National Ambient Air Quality Standards | Active | Completed |
| NCHRP 20-07/Task 092 | Durability of Precast Segmental Bridges | Completed | |
| NCHRP 20-07/Task 093 | AASHTO Subcommittee Process Evaluation | Completed | |
| NCHRP 20-07/Task 094 | Mitigating Nighttime Construction Noise, Vibrations, and Other Nuisances | Completed | |
| NCHRP 20-07/Task 095 | Support for the AASHTO 350 Task Force | Completed | |
| NCHRP 20-07/Task 096 | Techniques for Acquiring ITS Software | Completed | Completed |
| NCHRP 20-07/Task 097 | Bridge Performance Measures | Completed | Completed |
| NCHRP 20-07/Task 098 | Shear Design Methodology for Prestressed Concrete | Completed | |
| NCHRP 20-07/Task 099 | LRFD Design Criteria for Cotton Duck Pad (CDP) Bridge Bearings | Completed | Completed |
| NCHRP 20-07/Task 100 | Safety Appraisal of Suspension Bridge Main Cables | Completed | Completed |
| NCHRP 20-07/Task 101 | Lead States Web Site | Completed | |
| NCHRP 20-07/Task 102 | Project-Development Policies and Practices | Completed | Completed |
| NCHRP 20-07/Task 103 | Development of AASHTO Committee Web Sites | Completed | Completed |
| NCHRP 20-07/Task 104 | Support for the Year 2000 National Conference on Pavements | Completed | Completed |
| NCHRP 20-07/Task 105 | Planning, Design, and Operation of Pedestrian Facilities | Completed | Completed |
| NCHRP 20-07/Task 106 | Thermal Movement Design Procedure for Concrete | Completed | Completed |
| NCHRP 20-07/Task 107 | Shear Design Guidelines for Skewed Multi-Beam Bridges | Completed | Completed |
| NCHRP 20-07/Task 108 | Geometric Design Policy for Very Low-Volume Local Roads (<400 ADT) | Completed | Completed |
| NCHRP 20-07/Task 108A | Geometric Design Policy for Very Low-Volume Local Roads (<400 ADT) | Active | Completed |
| NCHRP 20-07/Task 109 | Improved Contracting Methods for Highway Construction Projects | Completed | Completed |
| NCHRP 20-07/Task 110 | Support AASHTO Participation in Forum on Transportation Investments and Economic Growth | Completed | Completed |
| NCHRP 20-07/Task 111 | Support for the AASHTO Task Group on Retroreflectivity Standards | Completed | |
| NCHRP 20-07/Task 112 | Geosynthetic Reinforcement in Roadway Sections | Completed | Completed |
| NCHRP 20-07/Task 113 | Corrosion of Metals Above the Ground Surface: Transportation Related Issues | Completed | Completed |
| NCHRP 20-07/Task 114 | Context Sensitive Design for Integrating Highway and Street Projects with Communities and the Environment | Completed | Completed |
| NCHRP 20-07/Task 115 | Effective Practices in Consultant Usage by State Departments of Transportation | Completed | Completed---Report provided to AASHTO for distribution |
| NCHRP 20-07/Task 116 | User's Guide for Evaluating Sign Retroreflectivity | Completed | Completed |
| NCHRP 20-07/Task 117 | Benefit/Cost Study of RWIS and Anti-icing Technologies | Completed | Completed |
| NCHRP 20-07/Task 118 | A Supplemental Guideline for Highway Design to Accommodate Older Drivers and Pedestrians | Completed | Completed |
| NCHRP 20-07/Task 119 | Environmental Best Practices Competition | Completed | |
| NCHRP 20-07/Task 120 | Asset Management | Completed | Completed |
| NCHRP 20-07/Task 121 | Strategic Plan for Bridge Engineering Research | Completed | |
| NCHRP 20-07/Task 122 | Load Rating by Load and Resistance Factor Evaluation Method | Completed | Completed |
| NCHRP 20-07/Task 123 | Production of a U.S. Customary System of Units Version of the Year 2000 Highway Capacity Manual | Completed | Funds shifted to Project 03-55(06) contract |
| NCHRP 20-07/Task 124 | Cost/Benefits of Constructability Reviews | Completed | Completed |
| NCHRP 20-07/Task 125 | Summary of Research Peer Exchange Findings and Recommendations | Completed | Completed |
| NCHRP 20-07/Task 126 | Production of the Year 2000 AASHTO Policy on Geometric Design of Highways and Streets | Completed | Completed |
| NCHRP 20-07/Task 127 | A Strategic Plan (Road Map) for Pavement Research | Completed | Completed---Summarized in NCHRP Research Results Digest 276 |
| NCHRP 20-07/Task 128 | Partnerships in Highway Development and Design for Shaping and Enhancing Communities | Completed | Completed |
| NCHRP 20-07/Task 129 | Synthesis of Project Delivery Times | Completed | Completed |
| NCHRP 20-07/Task 130 | Development of a Detailed Test Procedure by FTIR Identification for Structural Steel Coatings | Completed | |
| NCHRP 20-07/Task 131 | AASHTO Internet Applications Infrastructure | Completed | |
| NCHRP 20-07/Task 131A | AASHTO Model Committee Web Site | Completed | Completed |
| NCHRP 20-07/Task 131C | AASHTO Transportation Web Portal Concepts | Completed | Completed |
| NCHRP 20-07/Task 132 | Final Review and Acceptance of LRFD Specification for Walls | Completed | Completed |
| NCHRP 20-07/Task 133 | Improved Live Load Deflection Criteria for Steel Bridges | Completed | Completed |
| NCHRP 20-07/Task 134 | Asset Management Education and Communication Materials | Completed | Completed as 20-24(11) |
| NCHRP 20-07/Task 135 | Geometric Design Guide for Transit Facilities on Highways and Streets - Phase I | Active | Completed |
| NCHRP 20-07/Task 136 | Support for SCOH Task Force on Forest Development Roads | Completed | |
| NCHRP 20-07/Task 137 | Synthesis of R&T Partnership Working Group Reports | Completed | Completed |
| NCHRP 20-07/Task 138 | Recommended Procedures for the Testing of Rock-Fall Barriers | Completed | Completed |
| NCHRP 20-07/Task 139 | Application of European 2+1 Roadway Designs | Completed | Completed---Summarized in NCHRP Research Results Digest 275 |
| NCHRP 20-07/Task 140 | TEA-21 Stewardship Report | Completed | Research in progress |
| NCHRP 20-07/Task 141 | Conformity Problems Caused by the Mismatch in SIP/Transportation Plan Timeframe | Active | Research in progress---see Project 08-36/Task 20 |
| NCHRP 20-07/Task 142 | Scoping Study for a National Strategic Plan for Managing Transportation Information | Completed | Completed |
| NCHRP 20-07/Task 143 | Synthesis of Practice: AASHTO's National Transportation Product Evaluation Program (NTPEP) | Completed | Completed |
| NCHRP 20-07/Task 144 | Delegations of Authority to Expedite Environmental Streamlining | Completed | Completed |
| NCHRP 20-07/Task 145 | Update of the AASHTO Guide for Transportation Landscape and Environmental Design | Completed | Cancelled |
| NCHRP 20-07/Task 146 | Development of a Standard Protocol for Evaluating Hydrologic and Hydraulic Engineering Software Models | Completed | Research in progress |
| NCHRP 20-07/Task 147 | Update of the Design Guidelines for the Control of Blowing and Drifting Snow | Completed | Research in progress |
| NCHRP 20-07/Task 148 | Evaluation of Potential Impacts on the State DOTs of the US Access Board's Recommendations on Public Rights-of-Way | Completed | Completed |
| NCHRP 20-07/Task 149 | Evaluation of 3D Computer Modeling and Electronic Information Transfer for Efficient Design and Construction of Steel Bridges | Completed | Research in progress |
| NCHRP 20-07/Task 150 | Electronic NTPEP Report: A First Generation Query-Based Program to Aid in the Assessment of Pavement Markings and Sign Sheeting Materials | Completed | Completed |
| NCHRP 20-07/Task 151A | Transportation Security: Highway Emergency Response Handbook | Completed | Research in progress |
| NCHRP 20-07/Task 151B | Transportation Security: Highway Vulnerability Assessment Guide | Completed | Completed |
| NCHRP 20-07/Task 151C | Transportation Security: Sharing Information & Task Force Support | Completed | Research in progress |
| NCHRP 20-07/Task 152 | Project Cost Estimating A Synthesis of Highway Practice | Completed | Completed |
| NCHRP 20-07/Task 153 | Update of the AASHTO Transportation Glossary | Completed | Completed |
| NCHRP 20-07/Task 154 | Update of the HOV and Park-and-Ride Facilities Design Guides | Completed | Completed |
| NCHRP 20-07/Task 155 | Signing Standards for Two-Lane Exit Ramps with an | Completed | Research in progress |
| NCHRP 20-07/Task 156 | Finalize Two Design Examples for AASHTO Guide Specifications for Horizontally Curved Steel Highway Bridges | Completed | |
| NCHRP 20-07/Task 157 | Materials Information Management System Software Review | Completed | Completed |
| NCHRP 20-07/Task 158 | Survey of State DOT Practice: Outsourcing and Private Sector Utilization | Completed | Completed |
| NCHRP 20-07/Task 159 | Privatization and Commercial Use of Public Rights-of-Way | Completed | Completed |
| NCHRP 20-07/Task 160 | Two-Lane Road Analysis Methodology in the Highway Capacity Manual | Completed | Completed |
| NCHRP 20-07/Task 161 | Revision of the Draft AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities | Completed | Completed |
| NCHRP 20-07/Task 162 | Guidelines for the Correlation of Test Results from Bench-Scale and Large-Scale Testing on Rolled Erosion Control Products (RECP) | Completed | Completed |
| NCHRP 20-07/Task 163 | Innovative Practices in Workforce Development for State Departments of Transportation | Completed | Terminated |
| NCHRP 20-07/Task 163A | Innovative Practices in Workforce Development for State Departments of Transportation | Completed | Research in progress |
| NCHRP 20-07/Task 164 | Revision of AASHTO R9-97 | Completed | Completed |
| NCHRP 20-07/Task 165 | A Policy Synthesis on the Economic Benefits of NTPEP | Completed | Completed |
| NCHRP 20-07/Task 166 | Acceleration of Environmental Stewardship Best Practices for Maintenance and Construction | Completed | |
| NCHRP 20-07/Task 167 | Development of Recommended Revisions to Draft ADA Guidelines for Accessible Rights-of-Way | Completed | Completed |
| NCHRP 20-07/Task 168 | Determination of Appropriate Railing Heights for Bicyclists | Completed | Completed |
| NCHRP 20-07/Task 169 | Resolution of Comments submitted on the Draft AASHTO Guide for Context Sensitive Design | Completed | Completed |
| NCHRP 20-07/Task 169B | Resolution of Comments submitted on the Draft AASHTO Guide for Context Sensitive Design: Liability Chapter | Completed | Completed |
| NCHRP 20-07/Task 170 | Review and Revision of the AASHTO Maintenance Manual for Roadways and Bridges | Completed | Completed |
| NCHRP 20-07/Task 171 | Identification of Conflicts with AASHTO Publications Related to Clear Zone | Completed | Completed |
| NCHRP 20-07/Task 172 | Recommended AASHTO Design-Build Procurement Guide | Completed | Completed |
| NCHRP 20-07/Task 173 | Measuring and Communicating the Effects of Incident Management Improvements | Completed | Completed |
| NCHRP 20-07/Task 174 | Use of Positive Protection in Work Zones | Completed | Completed |
| NCHRP 20-07/Task 176 | Update of Exhibits for the AASHTO Green Book | Completed | |
| NCHRP 20-07/Task 177 | Synthesis of Maintenance and Durability Information for Detectable Warnings on Sidewalks | Completed | Completed |
| NCHRP 20-07/Task 178 | Evaluation and Update of NCHRP Project 24-08, | Completed | Completed |
| NCHRP 20-07/Task 179 | Development of Operating Procedures for the Standing Committee on Highways | Completed | Completed |
| NCHRP 20-07/Task 180 | Summary of International Practice on Bridge Girder and Deck Strengthening with Fiber Reinforced Polymer (FRP) Composites | Completed | |
| NCHRP 20-07/Task 181 | Multi-State Transportation Operations Program: Status & Critical Issues | Completed | Completed |
| NCHRP 20-07/Task 182 | Evaluation of Highway Innovative Technology Evaluation Center (HITEC) | Completed | Research in progress |
| NCHRP 20-07/Task 183 | LRFD Foundation Design Implementation and Specification Development | Completed | Completed |
| NCHRP 20-07/Task 184 | Development of a Pavement Preservation Synthesis, Research Plans, and Initiatives | Completed | Research in progress |
| NCHRP 20-07/Task 185 | Implementation of Flashing Yellow Arrow Display for Protected/Permissive Left Turn Control | Completed | |
| NCHRP 20-07/Task 186 | Updating the Calibration Report for the AASHTO LRFD Code | Completed | Completed |
| NCHRP 20-07/Task 187 | Updating the AASHTO Guide for the Development of Bicycle Facilities | Completed | Research in progress |
| NCHRP 20-07/Task 188 | Mainstreaming Operations in State DOTs | Completed | Completed |
| NCHRP 20-07/Task 189 | Advancing Strategic Highway Safety Plans: Safety Leadership Forum II | Completed | Completed |
| NCHRP 20-07/Task 190 | Develop Strategy for the Testing and Evaluation of Durable Striping Materials for High Traffic Areas and Mountain Passes | Completed | Completed |
| NCHRP 20-07/Task 191 | Product Evaluation and Plant Certification of HDPE Pipe | Completed | |
| NCHRP 20-07/Task 192 | Update of Barrier Hardware Guide | Completed | Completed |
| NCHRP 20-07/Task 193 | LRFD Guidelines for the Seismic Design of Highway Bridges, Version 2 | Completed | Completed |
| NCHRP 20-07/Task 194 | Consistency of Titles for AASHTO Publications | Completed | Completed |
| NCHRP 20-07/Task 195 | Development and Performance of Web Based Joint Salary Survey | Completed | The web-based survey has been developed and submitted to AASHTO for implementation. |
| NCHRP 20-07/Task 196 | Development of a Guide to Crashworthy Bridge Rail Systems | Completed | Completed |
| NCHRP 20-07/Task 197 | Development of a Test Method for Optical Sizing and Roundness Determination of Glass Beads Utilized in Traffic Marking | Completed | Work will be accomplished under Project 20-07 Task 243. |
| NCHRP 20-07/Task 198 | Standard Practice for Independent Assurance Programs | Completed | Completed |
| NCHRP 20-07/Task 199 | Update of the Strategic Plan for Bridge Engineering | Completed | Completed |
| NCHRP 20-07/Task 200 | Synthesis of Vehicle Based Winter Maintenance Technologies | Active | Research in progress |
| NCHRP 20-07/Task 201 | Use of Warranties in Highway Construction | Completed | |
| NCHRP 20-07/Task 202 | Guide to Benchmarking Operations Performance Measures | Completed | |
| NCHRP 20-07/Task 203 | Update of AASHTO Maintenance Manual to Include Systems Operations and Management | Active | Research in progress |
| NCHRP 20-07/Task 204 | Pavement Noise Intensity Testing in Europe for Comparison to the United States | Active | |
| NCHRP 20-07/Task 205 | Project Delivery Workforce Management Review | Completed | |
| NCHRP 20-07/Task 206 | A Model Guide for Condition Assessment Systems | Completed | |
| NCHRP 20-07/Task 207 | Update of the AASHTO Guide Specifications for Highway Construction | Active | Research in progress |
| NCHRP 20-07/Task 208 | Update of Recommendations on Crest Vertical Curves | Completed | |
| NCHRP 20-07/Task 209 | Incorporation of Research Findings into AASHTO's Standard Specifications for Structural Supports for Highway Signs, Luminaries and Traffic Signals | Completed | Completed |
| NCHRP 20-07/Task 210 | Guidelines for the Selection of Cable Barrier Systems | Completed | |
| NCHRP 20-07/Task 211 | Scoping study for an AASHTO Guide on Accelerating Project Delivery | Completed | Completed |
| NCHRP 20-07/Task 212 | Development of a Model Drivers License Handbook | Completed | |
| NCHRP 20-07/Task 213 | Requirements for Minimum Maintained Retroreflectivity of Pavement Marking | Completed | |
| NCHRP 20-07/Task 214 | Update of A Guide to Small Sign Support Hardware | Completed | |
| NCHRP 20-07/Task 215 | Statewide Incident Reporting Systems | Completed | |
| NCHRP 20-07/Task 216 | Application of LRFD Bridge Design Specifications to High-Strength Structural Concrete: Final Project – Phase I | Completed | Completed |
| NCHRP 20-07/Task 217 | Verification and Implementation of Strut-and-Tie Model in LRFD Bridge Design Specifications | Completed | Completed |
| NCHRP 20-07/Task 218 | Performance-Based Maintenance Contracting | Final | Cancelled |
| NCHRP 20-07/Task 219 | Testing American Traffic Marking Systems on the Spanish (AETEC) Traffic Marking Wear Simulator | Completed | |
| NCHRP 20-07/Task 220 | Update of the AASHTO Guide Specifications for Highway Construction | Completed | |
| NCHRP 20-07/Task 221 | Traffic Incident Management Program for Worker Safety | Active | |
| NCHRP 20-07/Task 222 | Evaluation of the Field Implementation of the Flashing Yellow Arrow Permissive Left-Turn Indication | Completed | |
| NCHRP 20-07/Task 223 | Update Business Needs for Pavement Engineering | Completed | |
| NCHRP 20-07/Task 224 | Update of the AASHTO Guide for Contracting, Selecting, and Managing Consultants in Preconstruction Engineering | Completed | |
| NCHRP 20-07/Task 225 | Best Practices in the Management of Design Errors and Omissions | Completed | |
| NCHRP 20-07/Task 226 | Review and Update of Human Factors and Operations Issues in the AASHTO Green Book | Completed | |
| NCHRP 20-07/Task 227 | Technology Transfer Guidebooks for Implementation of Innovative Technologies | Completed | |
| NCHRP 20-07/Task 228 | Update the United States Numbered Highways (1989 Edition) and Document Current U.S. Routes | Active | The contract has been executed and work is underway on the initial tasks. |
| NCHRP 20-07/Task 229 | Bridge Construction Practices Using Incremental Launching | Completed | |
| NCHRP 20-07/Task 230 | Safety and Security in Roadway Tunnels | Completed | |
| NCHRP 20-07/Task 231 | Laboratory Testing of Proposed Roundabout Traffic Control Options | Completed | |
| NCHRP 20-07/Task 232 | Development of a Guide to Update ADA Transition Plans | Completed | |
| NCHRP 20-07/Task 233 | Development of a Toolkit to Assist State DOTs and Contractors in Uniformly Handling DBE requirements | Completed | The project is completed and the final products delivered to AASHTO. |
| NCHRP 20-07/Task 234 | Guidelines for Selection of Bridge Deck Overlays, Sealers, and Treatments | Completed | |
| NCHRP 20-07/Task 235 | Development of Testing Protocols for Surface Applied Concrete Sealers Treatments | Completed | |
| NCHRP 20-07/Task 236 | Modification and Stabilization of Soils and Base for Use in Pavement Structures | Active | The project panel is reviewing the preliminary draft final report. |
| NCHRP 20-07/Task 237 | Incorporation of Lane Management and Toll Plaza Design Issues in the AASHTO Green Book | Active | In development |
| NCHRP 20-07/Task 238 | Conceptual Development of an AASHTO Guide to Systems Operations and Management | Completed | |
| NCHRP 20-07/Task 239 | Identification and Delineation of Incident Management and Multi-Agency Emergency Response Functions | Active | In development |
| NCHRP 20-07/Task 240 | Update of AASHTO Roadside Design Guide | Active | |
| NCHRP 20-07/Task 241 | Capacity Creation Through Innovative Design | Final | Cancelled |
| NCHRP 20-07/Task 242 | Cost Analysis of Rehabilitation/Reconstruction of the Nation's Highway Infrastructure | Active | In development |
| NCHRP 20-07/Task 243 | Development of a Test Method for Optical Sizing and Roundness Determination of Glass Beads Utilized in Traffic Markings | Active | Awaiting the preliminary draft final report. |
| NCHRP 20-07/Task 244 | Modifications for AASHTO LRFD Bridge Design Specifications to Incorporate or Update the Guide Specifications for Design of Pedestrian Bridges | Final | Completed |
| NCHRP 20-07/Task 245 | Bridge Construction Practices for Temporary Works | Active | The draft final report has been received and is under review. |
| NCHRP 20-07/Task 246 | Replacement Process for LED (Light Emitting Diode) Traffic Signals | Active | Draft final report under review |
| NCHRP 20-07/Task 247 | Outdoor Advertising Sign Regulation Study | Active | |
| NCHRP 20-07/Task 248 | Utility Encasement Policy for Highway Crossings | Active | |
| NCHRP 20-07/Task 249 | Asset Management Approaches to ADA Compliance | Completed | |
| NCHRP 20-07/Task 250 | Update AASHTO ''Guide for Snow and Ice Control'' | Completed | |
| NCHRP 20-07/Task 251 | Consideration of Pavement Preservation in the AASHTO Mechanistic-Empirical Pavement Design Guide | Completed | |
| NCHRP 20-07/Task 252 | Guidelines for Implementing Quality Control and Quality Assurance for Bridge Inspection | Active | |
| NCHRP 20-07/Task 253 | Subcommittee on Systems Operations and Management Strategic Plan Update | Completed | |
| NCHRP 20-07/Task 254 | Vehicle Size and Weight Management (VSW) Technology Transfer/Best Practices | Active | |
| NCHRP 20-07/Task 255 | Development of a Test Method To Determine the Ability of Adhesive Anchors To Resist Sustained Tensile Load | Completed | The project final report is available upon request to NCHRP |
| NCHRP 20-07/Task 256 | Safety Impacts of the Emerging Digital Display Technology for Outdoor Advertising Signs | Completed | |
| NCHRP 20-07/Task 257 | Crash Tested Precast Concrete Barrier Designs and Anchoring Methods | Active | |
| NCHRP 20-07/Task 258 | Identification of Cross-Cutting Issues Related to the Development, Management, and Delivery of Transportation Projects and Programs | Completed | The final report has been submitted to AASHTO. |
| NCHRP 20-07/Task 259 | Assessment of State-of-the-Practice for Identifying Earth Retaining Structure (ERS) | Active | |
| NCHRP 20-07/Task 260 | Development of Guidelines for Conducting Effective Customer Surveys Related to Highway Maintenance Operations | Active | Research in Progress, Interim report received. |
| NCHRP 20-07/Task 261 | Best Practices for Implementing Quality Control and Quality Assurance for Tunnel Inspection | Active | |
| NCHRP 20-07/Task 262 | Review and Update of the AASHTO Guide Specifications for Seismic Isolation Design | Active | |
| NCHRP 20-07/Task 263 | Update of the AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities | Active | A contract has been executed and work is underway. |
| NCHRP 20-07/Task 265 | Electronic Publications Delivery System: AASHTO’s Next Step | Active | Research in Progress, Interim report received. |
| NCHRP 20-07/Task 267 | Potential for Saving Lives with Various Countermeasures to Meet AASHTO’s New Safety Goal | Active | |
| NCHRP 20-07/Task 270 | Application of AASHTO LRFD Specifications to Design of Sound Barriers | Active | Research in progress |
| NCHRP 20-07/Task 271 | Graphical Traffic Signal Design Aid Based on the MUTCD | Active | Contract just underway |
| NCHRP 20-07/Task 274 | Price Indexing in Transportation Construction Contracts | Pending | |
| NCHRP 20-07/Task 275 | SCOH Strategic Plan Support | Active | Work is underway on initial tasks. |
| NCHRP 20-19(2) | Pedestrian Safety and Convenience on Suburban and Rural Highways---Implementation Phase | Completed | |
| NCHRP 20-23 | Kinematic Differential GPS Satellite Surveying | Completed | |
| NCHRP 20-24 | Research Program Design---Administration of Highway and Transportation Agencies | Completed | |
| NCHRP 20-24(01) | Using Market Research to Improve the Management of Transportation Systems | Completed | |
| NCHRP 20-24(02) | Executive Management Information Systems for State Departments of Transportation | Completed | |
| NCHRP 20-24(03) | Expanding the Civil Engineering Pool | Completed | |
| NCHRP 20-24(03)A | Civil Engineering Careers in Transportation---Outreach Program | Completed | |
| NCHRP 20-24(05) | Public Outreach in Transportation Management | Completed | |
| NCHRP 20-24(06)A | Performance Measures for State Highway and Transportation Agencies | Completed | |
| NCHRP 20-24(06)B | Business Systems Plan for Highway Engineering Information | Completed | |
| NCHRP 20-24(06)C | Information Systems for Transportation Agencies | Completed | |
| NCHRP 20-24(07) | Alternatives to Motor Fuel Taxes for Financing Surface Transportation Improvements | Completed | |
| NCHRP 20-24(07)A | Alternative Approaches to the Taxation of Heavy Vehicles | Completed | |
| NCHRP 20-24(08) | Project 20-24 Series---Revisited | Completed | |
| NCHRP 20-24(09) | State Departments of Transportation---Strategies for Change | Completed | |
| NCHRP 20-24(10) | Customer-Based Quality in Transportation | Completed | |
| NCHRP 20-24(11) | Asset Management Guidance for Transportation Agencies | Completed | |
| NCHRP 20-24(12) | Avoiding Delays During the Construction Phase of Highway Projects | Completed | Agency report available as an NCHRP Web-Only Document |
| NCHRP 20-24(12)A | Improving the Time Performance of Highway Construction Contracts | Completed | |
| NCHRP 20-24(13) | Innovative Financing Clearinghouse | Completed | |
| NCHRP 20-24(14) | Managing Change in State Departments of Transportation | Completed | |
| NCHRP 20-24(18) | Outsourcing of State DOT Delivery of Capital Programs | Completed | |
| NCHRP 20-24(19) | State DOTs and E-Business | Completed | |
| NCHRP 20-24(20) | Using Performance Measures to Manage Change in State Departments of Transportation | Completed | |
| NCHRP 20-24(21) | Characteristics of the 21st Century Operations-Oriented State DOT | Completed | |
| NCHRP 20-24(23) | Assessing the Importance of Transportation for Major Industries and Sectors of the U.S. Economy | Final | |
| NCHRP 20-24(24) | Transportation Mobility, Access and Safety for an Aging Population | Completed | |
| NCHRP 20-24(29) | CEO Leadership Forum | Completed | |
| NCHRP 20-24(30) | Performance Measurement in Context Sensitive Design | Completed | |
| NCHRP 20-24(31) | Effective Program Delivery in a Constrained Fiscal Environment | Completed | The final report has been submitted to AASHTO. |
| NCHRP 20-24(33) | Transportation Vision 2010 and Beyond | Completed | |
| NCHRP 20-24(34) | Commuting in America | Active | |
| NCHRP 20-24(35) | Communicating Urban Congestion Information | Completed | |
| NCHRP 20-24(36) | AASHTO Strategic Plan Support | Completed | |
| NCHRP 20-24(37) | Measuring Performance among State DOTs: Sharing Good Practices | Completed | |
| NCHRP 20-24(37)A | Measuring Performance among State DOTs: Sharing Good Practices -- Construction Project Cost and Schedule | Completed | |
| NCHRP 20-24(37)B | Measuring Performance among State DOTs: Sharing Good Practices based on the International Roughness Index | Completed | Completed |
| NCHRP 20-24(37)C | Measuring Performance Among State DOTs, Sharing Best Practices -- Safety | Completed | |
| NCHRP 20-24(37)D | Measuring Performance Among State DOTs, Sharing Best Practices--Operations Performance Using Incident Response Time | Pending | |
| NCHRP 20-24(38) | CEO Engagement Options | Completed | |
| NCHRP 20-24(39) | Alternative Organizational Designs for State Transportation Departments | Completed | |
| NCHRP 20-24(40) | Analysis and Benchmarking of State DOT Recruitment and Hiring Practices | Completed | |
| NCHRP 20-24(41) | Project Summaries for State DOT CEOs | Active | |
| NCHRP 20-24(42) | Guidelines for State DOT quality management systems | Completed | |
| NCHRP 20-24(43) | Innovative Contracting for Major Transportation Projects Workshop | Completed | The workshop was the deliverable |
| NCHRP 20-24(44) | Highway Safety Leadership Organizational Issues; A Survey of States and Recommendations for Sustaining Progrss | Completed | |
| NCHRP 20-24(45) | Executive Seminar, Coordinating Transportation and Land Development | Active | |
| NCHRP 20-24(46) | Freight Transportation: New Roles for State DOTs | Active | The project's indicated completion date does not reflect delays in contract modification. |
| NCHRP 20-24(47) | Racial and Gender Diversity in State DOTs and Transit Agencies: Phase I Benchmark Scoping | Completed | |
| NCHRP 20-24(48) | Analysis and Benchmarking of State DOT Human Resource Activities | Final | |
| NCHRP 20-24(49) | Future Financing Options to Meet Highway and Transit Needs | Completed | |
| NCHRP 20-24(50) | In-Service Training Needs for State DOTs | Completed | |
| NCHRP 20-24(51) | State DOT Leadership Forum--2006 | Completed | |
| NCHRP 20-24(52) | Future Options for the National System of Interstate and Defense Highways | Final | |
| NCHRP 20-24(53) | Twenty-First Century Leadership and Management Techniques for State DOTs | Completed | The project has been completed and the products provided to AASHTO for distribution. |
| NCHRP 20-24(54) | 2006 Bottom Line Report State and National Investment Analysis: Highways | Completed | |
| NCHRP 20-24(54)G | 2006 AASHTO Bottom Line Scoping | Completed | |
| NCHRP 20-24(55) | National Summit on Future Transportation Funding and Finance Strategies: States and Metropolitan Regions | Completed | |
| NCHRP 20-24(56) | National Leadership Retreat for State and Local Officials to Advance a Vision of the Transportation System Required to Meet Future Needs | Completed | |
| NCHRP 20-24(58) | Toward Developing Performance Based Federal-Aid Highway Programs | Active | |
| NCHRP 20-24(59) | Strategies for Reducing the Impacts of Surface Transportation on Global Climate Change | Completed | |
| NCHRP 20-24(60) | Updating AASHTO's Strategic Plan in CY 2008 | Active | |
| NCHRP 20-24(61) | Issues and Practices in Performance-Based Maintenance and Operations Management | Active | |
| NCHRP 20-24(62) | Identification of Marketing Tools that Resonate with Lawmakers and Key Stakeholders to Support and Increase Funding and Revenue for the Nation’s Transportation System | Active | This project was part of the initial NCHRP 20-24A task-order procurement. |
| NCHRP 20-24(63) | Partnership Approaches to Identify, Promote, and Implement Congestion Management Strategies | Final | |
| NCHRP 20-24(64) | Implications of Performance Standards, Conformity-Style Approaches, and Other Mechanisms for Assessing Greenhouse Gas (GHG) Reduction Strategies and Integrating GHG Objectives into Transportation Decision Making | Active | The project is administered under the NCHRP 20-24A task-order system. |
| NCHRP 20-24(65) | Strengthened Economic Basis for Systematic Selection of Highway and Transit Projects | Final | This project was removed from the NCHRP 20-24 program. |
| NCHRP 20-24(66) | Update of Technology and Alternative Fuels Assessment | Final | This project was removed from the NCHRP 20-24 program. |
| NCHRP 20-24(67) | State DOT CEO Leadership Forum- Spring/Summer 2009; Pilot Study of State Driven Performance Based Management Reporting | Active | |
| NCHRP 20-24(68) | Estimating the Costs to State Governments Due to Highway-Related Debilitating Injury and Fatal Crashes | Active | |
| NCHRP 20-24(69) | Implementable Strategies for Shifting to Direct Usage-Based Charges for Transportation Funding | Active | Completion date July 2009. The project is administered under the NCHRP 20-24A task-order system. |
| NCHRP 20-24A | Task-Order Support for Research on the Administration of Highway and Transportation Agencies | Active | |
| NCHRP 20-25 | Training Needs for Highway Construction Personnel | Completed | |
| NCHRP 20-25(2) | Training for Highway Construction Personnel | Completed | |
| NCHRP 20-25(3) | Development of Training Material for Highway Construction Personnel | Completed | |
| NCHRP 20-26 | Bond and Insurance Coverages for Highway Construction Contractors | Completed | |
| NCHRP 20-27 | Adaptation of Geographic Information Systems for Transportation | Completed | |
| NCHRP 20-27(2) | Development of System and Application Architectures for Geographic Information Systems in Transportation | Completed | |
| NCHRP 20-27(3) | Guidelines for the Implementation of Multimodal Transportation Location Referencing Systems | Completed | |
| NCHRP 20-28 | Hazardous Wastes in Highway Rights-of-Way | Completed | |
| NCHRP 20-29 | Development of a Multimodal Framework for Freight Transportation Investment: Consideration of Rail and Highway Trade-offs | Completed | |
| NCHRP 20-29(2) | Development of a Computer Model for Multimodal, Multicriteria Transportation Investment Analysis | Completed | |
| NCHRP 20-30 | NCHRP-IDEA | Active | |
| NCHRP 20-31 | Public Policy for Surface Freight Transportation | Completed | |
| NCHRP 20-32 | Development of a Comprehensive Thesaurus for Transportation Research | Completed | |
| NCHRP 20-32(2) | Refinement of Transportation Research Thesaurus and Implementation of Updated TRIS Keyword Index | Completed | |
| NCHRP 20-33 | Facilitating the Implementation of Research Findings | Completed | |
| NCHRP 20-33(2) | The Role of Procurement and Contracting Approaches in Facilitating the Implementation of Research Findings | Completed | |
| NCHRP 20-34 | Developing Measures of Effectiveness for Truck Weight Enforcement Activities | Completed | |
| NCHRP 20-35 | Plan for SHRP Follow-Up Studies | Completed | |
| NCHRP 20-36 | Highway Research and Technology -- International Information Sharing | Active | |
| NCHRP 20-37 | Strategic Direction for the NCHRP and Other AASHTO Research Activities | Completed | |
| NCHRP 20-38 | Development of a Manual for State Transportation Research | Completed | |
| NCHRP 20-39 | Improved User Access to TRIS Through the AASHTO VAN | Completed | |
| NCHRP 20-39(2) | Improved Transportation Research-In-Progress Data System | Active | |
| NCHRP 20-40 | Conversion of AASHTO Publications to Metric Units | Completed | |
| NCHRP 20-41 | Approaches for Increasing Private-Sector Involvement in Highway Innovation Process | Completed | |
| NCHRP 20-42 | Sustainable Transportation | Completed | |
| NCHRP 20-43 | Application of CD-ROM Technology for AASHTO Technical Documents | Completed | |
| NCHRP 20-44 | Accelerating the Application of NCHRP Research Results | Active | |
| NCHRP 20-45 | Scientific Approaches for Transportation Research | Completed | |
| NCHRP 20-46 | Systems Approach to Evaluating Innovations for Integration into Highway Practice | Completed | |
| NCHRP 20-47(1) | Quality and Accuracy of Positional Data in Transportation | Completed | |
| NCHRP 20-48 | Accessibility of Non-English Language Transportation Information | Completed | |
| NCHRP 20-48(01) | Making the Business Case for Translating Non-English Transportation Information | Completed | |
| NCHRP 20-49 | Support for LTPP Advisory Structure | Completed | |
| NCHRP 20-50(1) | LTPP Data Analysis: Data Availability and Facilitation | Completed | |
| NCHRP 20-50(10&16) | LTPP Data Analysis: Influence of Design and Construction Features on the Response and Performance of New Flexible and Rigid Pavements | Completed | |
| NCHRP 20-50(10) | LTPP Data Analysis: Factors Affecting the Performance of Flexible and Rigid Pavements | Completed | |
| NCHRP 20-50(14) | LTPP Data Analysis: Significance of "As-Constructed" AC Air Voids to Pavement Performance | Completed | |
| NCHRP 20-50(2) | LTPP Data Analysis: Relative Performance of Jointed Plain Concrete Pavements with Sealed and Unsealed Joints | Completed | |
| NCHRP 20-50(3&4) | LTPP Data Analysis: Effectiveness of Maintenance and Rehabilitation Options | Completed | |
| NCHRP 20-50(5) | LTPP Data Analysis: Variations in Pavement Design Inputs | Completed | |
| NCHRP 20-50(7&12) | LTPP Data Analysis: Daily and Seasonal Variations in Insitu Material Properties | Completed | |
| NCHRP 20-50(8&13) | LTPP Data Analysis: Factors Affecting Pavement Smoothness | Completed | |
| NCHRP 20-50(9) | LTPP Data Analysis: Feasibility of Using FWD Deflection Data to Characterize Pavement Construction Quality | Completed | |
| NCHRP 20-51(1) | LTPP Product Development: National Workshop on Pavement Smoothness | Completed | |
| NCHRP 20-51(2) | LTPP Product Development: PCC Pavement Practice Manual and Workshop | Completed | |
| NCHRP 20-51(3) | LTPP Product Development: Pavement Smoothness Specification for Approaches to WIM Equipment Sites | Completed | |
| NCHRP 20-52 | TRAC PAC2 -- A Hands-on Educational Program | Completed | |
| NCHRP 20-52(01) | Implementing TRAC PAC2 -- A Hands-on Educational Program | Completed | |
| NCHRP 20-53 | Using Customer Needs to Drive Transportation Decisions | Completed | |
| NCHRP 20-54 | Accelerating Opportunities for Innovation in the Highway Industry | Active | |
| NCHRP 20-55 | TRB Study on Future Surface Transportation Agency Human Resource Needs: Strategies for Recruiting, Training, and Retaining Personnel | Completed | |
| NCHRP 20-56 | New Services for AASHTO's World Wide Web Site | Completed | |
| NCHRP 20-57 | Analytic Tools to Support Transportation Asset Management | Completed | |
| NCHRP 20-58 | Oversight Panel a Future Strategic Highway Research Program | Pending | |
| NCHRP 20-58(1) | Detailed Planning for Research on Accelerating the Renewal of America's Highways ( | Completed | |
| NCHRP 20-58(2) | Detailed Planning for Research on Making a Significant Improvement in Highway Safety ("Safety") | Completed | |
| NCHRP 20-58(3) | Detailed Planning for Research on Providing a Highway System with Reliable Travel Times ("Reliability") | Completed | |
| NCHRP 20-58(4) | Detailed Planning for Research on Providing Highway Capacity in Support of the Nation's Economic, Environmental, and Social Goals ("Capacity") | Completed | |
| NCHRP 20-59 | Surface Transportation Security Research | Active | |
| NCHRP 20-59(01) | AASHTO Security Research Workshops and Forum | Completed | |
| NCHRP 20-59(02) | Bridge/Tunnel/Highway Infrastructure Vulnerability Workshops | Completed | |
| NCHRP 20-59(03) | Support for the FHWA/AASHTO Blue Ribbon Panel on Bridge and Tunnel Security | Completed | |
| NCHRP 20-59(04) | White Paper on Highway Security Issues for Reauthorization | Completed | |
| NCHRP 20-59(05) | National Needs Assessment for Ensuring Transportation Infrastructure Security | Completed | |
| NCHRP 20-59(06) | Responding to Threats: A Field Personnel Manual | Completed | |
| NCHRP 20-59(06)A&B | System Security Awareness for Transportation Employees | Active | |
| NCHRP 20-59(07) & 20-59(07)A | Transportation Security Information Clearinghouse & White Paper | Completed | |
| NCHRP 20-59(08) | Emergency Transportation Operations Preparedness and Response Workshop: Adaptations for Rural and International Border Crossing Situations | Completed | |
| NCHRP 20-59(09) | Methods for Determining Transportation and Economic Consequences of Terrorist Attacks | Completed | |
| NCHRP 20-59(10) | Secure Communication Infrastructure | Completed | |
| NCHRP 20-59(11) | Emergency Traffic Operations Management | Completed | |
| NCHRP 20-59(12) | Security and Emergency Response 2003 Survey of State Transportation Agencies | Completed | |
| NCHRP 20-59(14) | Research Support for the AASHTO Special Committee on Transportation Security | Active | |
| NCHRP 20-59(16) | Preparation of Educational Materials: Outreach | Completed | |
| NCHRP 20-59(16)A | Security Funding Resources: A Reference Guide for State Transportation Agencies | Completed | |
| NCHRP 20-59(16)B | Security Framework: Fundamentals of Transportation Security for DOTs | Completed | |
| NCHRP 20-59(17) | Guide to Risk Management of Multimodal Transportation Infrastructure | Active | |
| NCHRP 20-59(18) | Guidelines for Transportation Emergency Training Drills and Exercises | Completed | |
| NCHRP 20-59(19) | Transportation Response Options: Scenarios of Infectious Disease, Biological Agents, Chemical, Biological, Radiological, or Nuclear Exposure | Completed | |
| NCHRP 20-59(21) | Continuity of Operations Plans for Transportation Agencies | Completed | |
| NCHRP 20-59(22) | A Guide to Emergency Quarantine and Isolation Controls of Roads in Rural Areas | Active | |
| NCHRP 20-59(23) | A Guide to Emergency Response Planning at State Transportation Agencies | Active | |
| NCHRP 20-59(24) | A Guide to Transportation and Hazards Resources | Active | |
| NCHRP 20-59(25) | Security Research Plan | Completed | |
| NCHRP 20-59(26) | National Needs Assessment for Ensuring Transportation Infrastructure Security (2009-2015) | Active | |
| NCHRP 20-59(28) | Security 101: Physical Security Standards for Transportation | Active | |
| NCHRP 20-59(33) | Pre-Event Planning to Support Transportation Infrastructure Recovery | RFP | |
| NCHRP 20-60 | Performance Measures and Targets for Transportation Asset Management | Completed | |
| NCHRP 20-61 | Transportation of Radioactive Waste | Active | |
| NCHRP 20-62 | Long-Term Viability of Fuel Taxes for Transportation Finance | Completed | |
| NCHRP 20-63 | Performance Measurement Tool Box and Reporting System for Research Programs and Projects | Active | Final Report Received and Published. Maintenance of the website is continuing. |
| NCHRP 20-64 | XML Schemas for Exchange of Transportation Data (TransXML) | Completed | |
| NCHRP 20-65 | Research for the AASHTO Standing Committee on Public Transportation | Active | |
| NCHRP 20-65/Task 17 | Compliance Monitoring Tools | Active | |
| NCHRP 20-65/Task 18 | State DOT Best Practices for Developing a Title VI Civil Rights Program Document | Active | |
| NCHRP 20-65/Task 19 | Utilization by States of the Flexibility to Transfer Federal Funds Among Eligible Federal Programs | Active | |
| NCHRP 20-65/Task 20 | Analysis of Rural Intercity Bus Strategy | Active | |
| NCHRP 20-65/Task 21 | Cost/Benefit Analysis of Converting a Lane for Bus Rapid Transit | Active | |
| NCHRP 20-66 | Strategic Plan for Transportation Information Management | Completed | |
| NCHRP 20-67 | Making Transportation Tunnels Safe and Secure | Completed | |
| NCHRP 20-68 | US Domestic Scan Program | Final | The Domestic Scan Program has been initiated as a continuing NCHRP activity. Refer to NCHRP 20-68A. |
| NCHRP 20-68(01) | U.S. Domestic Scan Program Pilot | Completed | The Domestic Scan Program has been initiated as a continuing activity, NCHRP 20-68A. |
| NCHRP 20-68A | US Domestic Scan Program | Active | |
| NCHRP 20-68B | Accelerating the Rate of Innovation Among State DOTs | Active | In development; refer to individual sub-projects. |
| NCHRP 20-68B(01) | Accelerating the Rate of Innovation Among State DOTs—Tracing Domestic Scan Impacts | Active | |
| NCHRP 20-69 | Guidance for Transportation Project Management | Active | |
| NCHRP 20-70 | Transportation Research Thesaurus Improvements | Completed | |
| NCHRP 20-71 | Effective Experimental Design and Data Analysis in Transportation Research | Active | |
| NCHRP 20-72 | Tools to Aid State DOTs in Responding to Workforce Challenges | Completed | |
| NCHRP 20-73 | Accelerating Transportation Program and Project Delivery: Conception to Completion | Active | |
| NCHRP 20-74 | Developing an Asset-Management Framework for the Interstate Highway System | Completed | |
| NCHRP 20-74A | Development of Service Levels for the Interstate Highway System | Active | |
| NCHRP 20-75 | Implementing Transportation Knowledge Networks | Active | The draft final report has been received and is under review. |
| NCHRP 20-76 | Disparity/Availability Study Guidelines for State DOT Disadvantaged Business Enterprise (DBE) Programs | Active | The draft final report has been received and is under review. |
| NCHRP 20-77 | Transportation Operations Training Framework | Active | |
| NCHRP 20-78 | Communicating the Value of Research | Active | Research in progress |
| NCHRP 20-79 | Expansion of the Transportation Research Thesaurus | Active | Work is underway on initial tasks. |
| NCHRP 20-81 | Guide to Implementing Strategies to Attract and Retain a Capable Transportation Workforce | Pending | Contractor has been selected; contract is expected to be executed in Spring 2009 |
| NCHRP 20-82 | Next Generation Transportation Pooled Fund (TPF) Website | Active | Research in Progress |
| NCHRP 20-83 | Long-Range Strategic Issues Facing the Transportation Industry | Anticipated | In development. For more information, see the Project 20-83 series of projects. |
| NCHRP 20-83(01) | Economic Changes Driving Future Freight Transportation | Pending | |
| NCHRP 20-83(02) | Expediting Future Technologies for Enhancing Transportation System Performance | Pending | |
| NCHRP 20-83(03) | Long-Range Strategic Issues Affecting Preservation, Maintenance, and Renewal of Highway Infrastructure | Pending | |
| NCHRP 20-83(04) | Effects of Changing Transportation Energy Supplies and Alternative Fuel Sources on Transportation | Pending | |
| NCHRP 20-83(05) | Climate Change and the Highway System: Impacts and Adaptation Approaches | Pending | |
| NCHRP 20-83(06) | Effects of Socio-Demographics on Travel Demand | Anticipated | |
| NCHRP 20-83(07) | Sustainable Transportation Systems and Sustainability as an Organizing Principle for Transportation Agencies | Anticipated | |
| NCHRP 20-84 | Streamline and Simplify Right-of-Way Procedures and Business Practice | Anticipated | |
| NCHRP 20-85 | Wind, Solar and Ground-Source Energy for Maintenance Area Facilities | Anticipated | |
| NCHRP 20-86 | Skill Set Requirements and Career Opportunity Awareness for Transportation Systems Operation and Management Needs at High School and College Levels | Anticipated | |
| NCHRP 21-03 | Instrumentation for Measuring Scour at Bridge Piers and Abutments | Completed | |
| NCHRP 21-04 | Sealing Geotechnical Exploratory Holes to Protect the Subsurface Environment | Completed | |
| NCHRP 21-05 | Determination of Unknown Subsurface Bridge Foundations | Completed | |
| NCHRP 21-05(2) | Unknown Subsurface Bridge Foundation Testing | Completed | Report not published; agency report available for loan. |
| NCHRP 21-06 | Corrosion in the Soil Environment: Soil Resistivity and pH Measurements | Completed | The project final report is available for loan on request to NCHRP. |
| NCHRP 21-07 | Development of Portable Scour Monitoring Equipment | Completed | Published as NCHRP Report 515 |
| NCHRP 21-08 | Assessment of Innovative Load Testing of Deep Foundations | Completed | Agency report available as NCHRP Web-Only Document 84. |
| NCHRP 21-09 | Intelligent Soil Compaction Systems | Active | Status - Draft final report in the hands of the panel for review. |
| NCHRP 22-05 | Develop Performance Standards and Hardware for Low Service Level Guardrail Systems | Completed | |
| NCHRP 22-05A | Warrants for the Installation of Low Service Level Guardrail Systems | Completed | |
| NCHRP 22-06 | Roadside Safety Design for Small Vehicles | Completed | |
| NCHRP 22-07 | Update of "Recommended Procedures for Safety Performance Evaluation of Highway Appurtenances" | Completed | |
| NCHRP 22-08 | Evaluation of Performance Level Selection Criteria for Bridge Railings | Completed | |
| NCHRP 22-09 | Improved Procedures for Cost-Effectiveness Analysis of Roadside Safety Features | Completed | |
| NCHRP 22-10 | Updated Materials for a Traffic Barrier/Small Sign Support Hardware Guide | Completed | |
| NCHRP 22-11 | Evaluation of Roadside Features to Accommodate Vans, Mini-Vans, Pickup Trucks, & 4-Wheel Drive Vehicles | Completed | |
| NCHRP 22-12 | Guidelines for the Selection, Installation, and Maintenance of Highway-Safety Features | Completed | |
| NCHRP 22-12(02) | Selection Criteria and Guidelines for Highway Safety Features | Completed | |
| NCHRP 22-13 | Performance of Roadside Barriers | Completed | |
| NCHRP 22-13(2) | Expansion and Analysis of In-Service Barrier Performance Data and Planning for Establishment of a Database | Completed | |
| NCHRP 22-14 | Improvement of the Procedures for the Safety-Performance Evaluation of Roadside Features | Completed | |
| NCHRP 22-14(02) | Improved Procedures for Safety-Performance Evaluation of Roadside Features | Completed | |
| NCHRP 22-14(03) | Evaluation of Existing Roadside Safety Hardware Using Updated Criteria | Active | |
| NCHRP 22-15 | Improving the Compatibility of Vehicles and Roadside Safety Hardware | Completed | |
| NCHRP 22-16 | Development of an Improved Roadside Barrier System | Completed | |
| NCHRP 22-17 | Recommended Guidelines for Curbs and Curb-Barrier Combinations | Completed | |
| NCHRP 22-18 | Crashworthy Work-Zone Traffic Control Devices | Completed | |
| NCHRP 22-19 | Aesthetic Concrete Barrier and Bridge Rail Designs | Completed | |
| NCHRP 22-20 | Design of Roadside Barrier Systems Placed on MSE Retaining Walls | Active | |
| NCHRP 22-20(02) | Design of TL-5 Roadside Barrier Systems Placed on MSE Retaining Walls | Anticipated | |
| NCHRP 22-21 | Median Cross-Section Design for Rural Divided Highways | Active | |
| NCHRP 22-22 | Placement of Traffic Barriers on Roadside and Median Slopes | Pending | |
| NCHRP 22-23 | Criteria for Restoration of Longitudinal Barriers | Active | |
| NCHRP 22-24 | Guidelines for Verification and Validation of Crash Simulations Used in Roadside Safety Applications | Active | |
| NCHRP 22-25 | Development of Guidance for the Selection, Use, and Maintenance of Cable Barrier Systems | Active | |
| NCHRP 22-26 | Factors Related to Serious Injury and Fatal Motorcycle Crashes with Traffic Barriers | Active | |
| NCHRP 22-27 | Roadside Safety Analysis Program (RSAP) Update | Active | |
| NCHRP 24-03 | Laboratory Evaluation of Piles Installed with Vibratory Drivers | Completed | |
| NCHRP 24-04 | Load Factor Design Criteria for Highway Structure Foundations | Completed | |
| NCHRP 24-05 | Downdrag on Bitumen-Coated Piles | Completed | |
| NCHRP 24-06 | Expert System for Stream Stability and Scour Evaluation | Completed | Published as NCHRP Report 426. |
| NCHRP 24-07 | Countermeasures to Protect Bridge Piers from Scour | Completed | |
| NCHRP 24-07(2) | Countermeasures to Protect Bridge Piers from Scour | Completed | Published as NCHRP Report 593. |
| NCHRP 24-08 | Scour at Bridge Foundations: Research Needs | Completed | |
| NCHRP 24-09 | Static and Dynamic Lateral Loading of Pile Groups | Completed | |
| NCHRP 24-10 | Thermally Sprayed Metallic Coatings to Protect Steel Pilings | Completed | |
| NCHRP 24-11 | Guidelines for Geofoam Applications in Embankment Projects | Completed | Published as NCHRP Report 529 and Web-Only Document 65 |
| NCHRP 24-11(02) | Guidelines for Geofoam Applications in Slope Stability Projects | Active | |
| NCHRP 24-12 | Controlled Low-Strength Material For Backfill, Utility Bedding, Void Fill, and Bridge Approaches | Completed | |
| NCHRP 24-12(01) | Controlled Low-Strength Material For Backfill, Utility Bedding, Void Fill, and Bridge Approaches | Completed | |
| NCHRP 24-13 | Evaluation of Metal Tensioned Systems in Geotechnical Applications | Completed | |
| NCHRP 24-14 | Scour at Contracted Bridge Sites | Completed | Agency report available as NCHRP Web-Only Document 83. |
| NCHRP 24-15 | Complex Pier Scour and Contraction Scour in Cohesive Soils | Completed | Report published as NCHRP Report 516. |
| NCHRP 24-15(2) | Abutment Scour in Cohesive Soils | Active | |
| NCHRP 24-16 | Methodology for Predicting Channel Migration | Completed | Published as NCHRP Report 533, Web-Only Document 67, CRP-CD-48, & CRP-CD-49. |
| NCHRP 24-17 | LRFD Deep Foundation Design | Completed | |
| NCHRP 24-18 | Countermeasures to Protect Bridge Abutments from Scour | Completed | Terminated due to PI relocation. |
| NCHRP 24-18A | Countermeasures to Protect Bridge Abutments from Scour | Completed | Published as NCHRP Report 587. |
| NCHRP 24-19 | Environmentally Sensitive Channel- and Bank-Protection Measures | Completed | Published as NCHRP Report 544. |
| NCHRP 24-20 | Prediction of Scour at Bridge Abutments | Active | The draft final report is in the hands of the panel. |
| NCHRP 24-21 | LRFD Soil-Nailing Design and Construction Specifications | Active | Draft final report undergoing editing |
| NCHRP 24-22 | Selecting Backfill Materials for MSE Retaining Walls | Active | Draft final report due in March, 2009 |
| NCHRP 24-23 | Riprap Design Criteria, Specifications, and Quality Control | Completed | Completed-Published as NCHRP Report 568 |
| NCHRP 24-24 | Criteria for Selecting Numeric Hydraulic Modeling Software | Completed | Published as NCHRP Web-Only Document 106. |
| NCHRP 24-25 | Guidelines for Risk-Based Management of Bridges with Unknown Foundations | Completed | Published as NCHRP Web-Only Document 107. |
| NCHRP 24-26 | Effects of Debris on Bridge-Pier Scour | Active | Status - Draft final report in hands of panel |
| NCHRP 24-27 | Evaluation of Bridge-Scour Research | Pending | |
| NCHRP 24-27(01) | Evaluation of Bridge Scour Research: Pier Scour Processes and Predictions | Active | Work in progress. |
| NCHRP 24-27(02) | Evaluation of Bridge-Scour Research: Abutment and Contraction Scour Processes and Predicitions | Active | Work in progress. |
| NCHRP 24-27(03) | Evaluation of Bridge-Scour Research: Geomorphic Processes and Predictions | Active | |
| NCHRP 24-28 | LRFD Metal Loss and Service-Life Strength Reduction Factors for Metal-Reinforced Systems in Geotechnical Applications | Active | Work in progress. |
| NCHRP 24-29 | Scour at Bridge Foundations on Rock | Active | Status - Collection of field data at bridge sites completed |
| NCHRP 24-30 | Design Guidelines for Increasing the Lateral Resistance of Highway Bridge Pile Foundations by Improving Weak Soils | Active | |
| NCHRP 24-31 | LRFD Design Specifications for Shallow Foundations | Active | A contract extension is being processed. |
| NCHRP 24-32 | Scour at Wide Piers and Long Skewed Piers | Active | |
| NCHRP 24-33 | Development of Design Methods for In-Stream Flow Control Structures | Active | Status - Start-up, literature review and put together survey of states. |
| NCHRP 24-34 | Risk-Based Approach to Bridge Scour Prediction | Anticipated | |
| NCHRP 25-02 | Predicting Stop-and-Go Traffic Noise Levels | Completed | |
| NCHRP 25-03 | Guidelines for the Development of Wetland Replacement Areas | Completed | |
| NCHRP 25-04 | Determining Economic Impacts on Adjacent Businesses Due to Restricting Left Turns | Completed | |
| NCHRP 25-05 | Remote Sensing and Other Technologies for the Identification and Classification of Wetlands | Completed | |
| NCHRP 25-06 | Intersection Air Quality Modeling | Completed | |
| NCHRP 25-07 | Improving Transportation Data for Mobile Source Emissions Estimates | Completed | |
| NCHRP 25-08 | Impact of Highway Capacity Improvements on Air Quality and Energy Consumption | Completed | |
| NCHRP 25-09 | Environmental Impact of Construction and Repair Materials on Surface and Ground Waters | Completed | |
| NCHRP 25-09(01) | Environmental Impact of Construction and Repair Materials on Surface and Ground Waters -- Outreach and Training | Completed | |
| NCHRP 25-10 | Estimating the Indirect Effects of Proposed Transportation Projects | Completed | |
| NCHRP 25-10(2) | Desk Reference for Estimating the Indirect Effects of Proposed Transportation Projects | Completed | |
| NCHRP 25-11 | Development of a Modal-Emissions Model | Completed | |
| NCHRP 25-12 | Wet Detention Pond Design for Highway Runoff Pollution Control | Completed | Report not published. Agency report available for loan. |
| NCHRP 25-13 and 25-13(2) | Assessments of Impacts of Bridge Deck Runoff Contaminants on Receiving Waters | Completed | |
| NCHRP 25-14 | Heavy-Duty Vehicle Emissions | Completed | |
| NCHRP 25-15 | Short-Term Monitoring for Compliance with Air Quality Standards | Active | |
| NCHRP 25-16 | Guidance for Selecting Compensatory Wetland Mitigation Options | Completed | |
| NCHRP 25-17 | Transportation Effects of the 1997 Changes to the National Ambient Air Quality Standards | Active | |
| NCHRP 25-18 | Particulate-Matter (PM2.5 and PM10) Apportionment for On-Road Mobile Sources | Active | |
| NCHRP 25-19 | Evaluation of Methods, Tools, and Techniques to Assess the Social and Economic Effects of Transportation Projects | Completed | |
| NCHRP 25-20 | Management of Runoff from Surface Transportation Facilities--Synthesis and Research Plan | Completed | |
| NCHRP 25-20(01) | Evaluation of Best Management Practices for Highway Runoff Control | Completed | |
| NCHRP 25-20(02) | Identification of Research Needs Related to Highway Runoff Management | Completed | |
| NCHRP 25-21 | Predicting Short-Term and Long-Term Air Quality Effects of Traffic-Flow Improvement Projects | Completed | |
| NCHRP 25-22 | Technologies to Improve Consideration of Environmental Concerns in Transportation Decisions | Completed | Report available as CRP-CD-14 |
| NCHRP 25-22(02) | Technologies to Improve Consideration of Environmental Concerns in Transportation Decisions | Completed | |
| NCHRP 25-23 | Environmental Information Management and Decision Support System for Transportation | Completed | |
| NCHRP 25-23(2) | Software for an Environmental Information Management and Decision Support System | Completed | |
| NCHRP 25-24 | Monitoring, Analyzing, and Reporting on the Environmental Streamlining Pilot Projects | Completed | |
| NCHRP 25-25 | Research for the AASHTO Standing Committee on the Environment | Active | |
| NCHRP 25-25/Task 01 | Synthesis on Data Needs for EA and EIS Documentation | Completed | |
| NCHRP 25-25/Task 02 | Transportation Impacts and 'Smart Growth' Initiatives | Completed | |
| NCHRP 25-25/Task 03 | Assessment and Mitigation Strategies for Land Development Impacts of Transportation Improvements | Completed | |
| NCHRP 25-25/Task 04 | Environmental Stewardship Practices, Policies, and Procedures for Road Construction and Maintenance | Completed | |
| NCHRP 25-25/Task 05 | Assessing the Current State of the NEPA Environmental Review Process | Completed | |
| NCHRP 25-25/Task 06 | Preparing State DOTs for Implementation of the 8-hour Ozone and PM2.5 Standards | Completed | |
| NCHRP 25-25/Task 07 | Evaluation of Mobile Models: MOBILE 6.1, MOBILE 6.2 and MOBILE6/CNG | Completed | |
| NCHRP 25-25/Task 08 | Developing Performance Data Collection Protocol for Stream Restoration | Completed | |
| NCHRP 25-25/Task 09 | Use of Existing Data in Decision Making | Completed | Cancelled |
| NCHRP 25-25/Task 10 | Alternative Mitigation Strategies/Early Mitigation: Streamlining and Achieving Net Benefits for the Natural Environment | Completed | |
| NCHRP 25-25/Task 11 | Secondary/Indirect and Cumulative Effects Analysis | Completed | |
| NCHRP 25-25/Task 12 | Design-Build Environmental Compliance Process and Level of Detail Required | Completed | |
| NCHRP 25-25/Task 13 | Agency Use and Approach to FHWA Approved Programmatic Agreements | Completed | |
| NCHRP 25-25/Task 14 | A Summary of Existing Research on Dam Removal Projects | Completed | |
| NCHRP 25-25/Task 15 | Historic Bridges | Completed | |
| NCHRP 25-25/Task 16 | State Transportation Agency Strategies to Address NPDES Phase II Requirements | Completed | |
| NCHRP 25-25/Task 17 | Assessment of Greenhouse Gas Analysis Techniques for Transportation Projects | Completed | |
| NCHRP 25-25/Task 18 | Recommended Approaches to Communicating Air Toxics Issues and Transportation Project-Related Analyses in NEPA Documents | Completed | |
| NCHRP 25-25/Task 19 | Historic Bridge Rehabilitation / Replacement Decision Making | Completed | |
| NCHRP 25-25/Task 20 | The Role of State DOTs in Support of Transit Oriented Development (TOD) | Completed | |
| NCHRP 25-25/Task 21 | Assessment of Geophysical Remote Sensing Opportunities at State Departments of Transportation for Incorporation into Archaeological Investigations | Completed | |
| NCHRP 25-25/Task 22 | Land Use Forecasting for Indirect Impacts Analysis | Completed | |
| NCHRP 25-25/Task 23 | Environmental performance measurements related to transportation project planning, design, construction, maintenance and operations | Completed | |
| NCHRP 25-25/Task 24 | Climate Change and U.S. Transportation | Completed | |
| NCHRP 25-25/Task 25 | Modification and Amendment of Environmental Permits on Design-Build Projects | Completed | |
| NCHRP 25-25/Task 26 | Integration of Charrette Processes into Project Planning | Final | Cancelled |
| NCHRP 25-25/Task 27 | Project Management and NEPA | Completed | Completed |
| NCHRP 25-25/Task 28 | Reevaluations of NEPA documents | Completed | |
| NCHRP 25-25/Task 29 | Best Practices Library from the Environmental Stewardship Practices in Construction and Maintenance Compendium | Completed | |
| NCHRP 25-25/Task 30 | Section 404 Permitting and Roadside Ditches as Jurisdictional Waters | Completed | Cancelled |
| NCHRP 25-25/Task 31 | Cost Effective Tools for Achieving PM 2.5 Transportation Air Quality Conformity | Completed | Cancelled |
| NCHRP 25-25/Task 32 | Linking Environmental Resource and Transportation Planning – The Current State of Practice | Final | This project is completed and results are available at the links below. |
| NCHRP 25-25/Task 33 | National Register of Historic Places Eligibility | Completed | |
| NCHRP 25-25/Task 34 | Streamlined Carbon Monoxide Hot Spot Screening / Modeling Tool | Completed | Cancelled |
| NCHRP 25-25/Task 35 | Water Quality Analyses for NEPA Documents: Selecting Appropriate Methodologies | Completed | Completed |
| NCHRP 25-25/Task 36 | Recurring Community Impacts | Completed | The final report has been submitted to AASHTO |
| NCHRP 25-25/Task 37 | Effective Organizational Structures and Management Practices for Achieving Environmental Stewardship in Transportation Agencies | Completed | Final Report sent to AASHTO. |
| NCHRP 25-25/Task 38 | Guide to Use of Tier I Environmental Impact Statements for Transportation Projects | Active | The draft final report has been received and is under review. |
| NCHRP 25-25/Task 39 | Improving Project Environmental Cost Estimates | Completed | The project is completed and the final report has been submitted to AASHTO. |
| NCHRP 25-25/Task 40 | New Noise Barrier Products & Noise Barrier Approval Research & Guidelines | Completed | Completed. |
| NCHRP 25-25/Task 41 | Implementation of Community & Cultural Resource Commitments | Completed | This project is completed and the final report has been submitted to AASHTO. |
| NCHRP 25-25/Task 42 | Determine alternative calculations for fine particulate emission factors other than AP-42 applicable to calculate re-entrained dust on transportation projects | Completed | The project has been completed and the final report submitted to AASHTO |
| NCHRP 25-25/Task 43 | Guidance on legal sufficiency criteria for adequate cumulative and secondary impacts analysis in EIS documents | Completed | The project has been completed and the final report submitted to AASHTO |
| NCHRP 25-25/Task 44 | Development and Implementation of a Transportation and Climate Change Clearinghouse | Completed | The draft clearinghouse structure and content is being reviewed. |
| NCHRP 25-25/Task 45 | Transportation Program Responses to Greenhouse Gas (GHG) Reduction Initiatives and Energy Reduction Programs | Active | Research in Progress |
| NCHRP 25-25/Task 46 | Compendium of Best Practices for Environmental Compliance and Stewardship at Transportation Maintenance Facilities | Active | Research in Progress |
| NCHRP 25-25/Task 47 | Compendium of Best Practices for Incorporating Environmental Commitments into Transportation Project Construction Contract Documents | Completed | The project has been completed and the final report submitted to AASHTO. |
| NCHRP 25-25/Task 48 | Compendium of Environmental Fieldwork Technologies | Active | Research in Progress |
| NCHRP 25-25/Task 49 | Effective Practices for Considering Historic Preservation in Transportation Planning and Early Project Development | Active | Research in Progress. Preliminary draft final report received. |
| NCHRP 25-25/Task 50 | Finding the Carrot Instead of the Stick - Incentive-based Approaches for Environmental Compliance | Completed | The project has been completed and the final report submitted to AASHTO |
| NCHRP 25-25/Task 51 | Asset Management of Environmental Mitigation Features | Completed | The project has been completed and the final report submitted to AASHTO. |
| NCHRP 25-25/Task 52 | Informational Requirements for Jurisdictional Determinations to be Issued by the Army Corps of Engineers (Corps) Under the Clean Water Act (CWA) | Completed | The project has been completed and the final report submitted to AASHTO. |
| NCHRP 25-25/Task 53 | Stormwater Treatment with Vegetated Buffer | Active | Research in progress, Preliminary draft final report under review |
| NCHRP 25-25/Task 54 | Evaluate Colorado's Area-wide Cumulative Effects Assessment (ACEA) Methodology as a Mechanism for Cumulative Impacts Analysis of Regional Transportation Plans | Active | Research in progress, Interim report received. |
| NCHRP 25-25/Task 55 | Design, Organize and Implement a Training Program for Mainstreaming Environmental Stewardship and Enhancement Activities into Planning and Project Development | Active | Research in progress |
| NCHRP 25-25/Task 56 | Cost and Benefit of Transportation Specific MS4 and Construction Permitting | Active | Research in progress |
| NCHRP 25-25/Task 58 | Methods to Address Greenhouse Gas Emissions from Transportation Construction/Maintenance/Operations Activities | Active | Research in progress |
| NCHRP 25-25/Task 59 | Evaluate the Interactions between Transportation-Related Particulate Matter, Ozone, Air Toxics, Climate Change, and Other Air Pollutant Control Strategies | Active | Research in progress |
| NCHRP 25-25/Task 60 | Increased Use of Environmentally Preferable, Non-Toxic Products to Reduce Costs, Liabilities, and Pollution at DOT Offices, Maintenance Facilities and Rest Stops | Active | Research in progress |
| NCHRP 25-25/Task 61 | Best Practices for Establishing and Maintaining Statewide Cultural Resource Databases at State DOTs | Active | Research in progress |
| NCHRP 25-25/Task 62 | Improving the Effectiveness of Outreach to Traditional and Non-Traditional Groups by Integrating the Expertise of Existing and Emerging Citizen Coalitions into Transportation Analysis and Decision Making | Active | Research in progress |
| NCHRP 25-25/Task 63 | Transportation Corridor Environmental Management Framework | Active | Research in progress |
| NCHRP 25-27 | Evaluation of the Use and Effectiveness of Wildlife Crossings | Completed | |
| NCHRP 25-28 | Predicting and Mitigating Hydroacoustic Impacts on Fish from Pile Installation | Active | Work is underway on the Phase 2 research plan. |
| NCHRP 25-29 | Developing Design and Management Guidelines for Historic Road Corridors | Completed | |
| NCHRP 25-29A | Guidelines for Design and Management of Historic Road Corridors | Active | Work is is progress on Phase II of the project. |
| NCHRP 25-30 | Temporary Bridging to Avoid or Minimize Impacts to Waters and Wetlands During Highway Construction | Completed | The results of this study have been published in NCHRP Research Results Digest 330 . |
| NCHRP 25-31 | Guidelines for Evaluating and Selecting Modifications to Existing Roadway Drainage Infrastructure to Improve Water Quality in Ultra-Urban Areas | Active | Work is underway on the initial tasks. |
| NCHRP 25-32 | Enhanced Stormwater Treatment BMPs in Highly Urbanized Areas | Anticipated | |
| NCHRP 25-33 | Evaluation of the Methodologies for Visual Impact Assessments | Anticipated | |
| NCHRP 70-01 | Private-Sector Provision of Congestion Data | Completed | |