Transportation Research Board Transportation Research Board The National Academies
About TRB
Annual Meeting
Calendar
Committees & Panels
News
Programs
Publications
Resources & Databases
Contact TRB
Search TRB



NCHRP Projects (since 1989)

See NCHRP Web Document 7 for projects before 1989.

All NCHRP
Research Field 1 - Pavements
Research Field 2 - Economics
Research Field 3 - Operations and Control
Research Field 4 - General Materials
Research Field 5 - Illumination and Visibility
Research Field 6 - Snow and Ice Control
Research Field 7 - Traffic Planning
Research Field 8 - Forecasting
Research Field 9 - Bituminous Materials
Research Field 10 - Specifications, Procedures and Practices
Research Field 11 - Law
Research Field 12 - Bridges
Research Field 13 - Equipment
Research Field 14 - Maintenance of Way and Structures

Research Field 15 - General Design
Research Field 16 - Roadside Development
Research Field 17 - Safety
Research Field 18 - Concrete Materials
Research Field 19 - Finance
Research Field 20 - Special Projects
Research Field 21 - Testing and Instrumentation
Research Field 22 - Vehicle Barrier Systems
Research Field 23 - Properties
Research Field 24 - Mechanics and Foundations
Research Field 25 - Impact Analysis
Research Field 70 - Pooled Fund
Research Field 84 - Motor Carrier

NCHRP - All Research Fields

Project Number Project Title Stage Comments
NCHRP 01-25(1)Effects of Heavy Vehicle Characteristics on Pavement Response and Performance---Phase IICompleted
NCHRP 01-27Video Image Processing for Evaluating Pavement Surface DistressCompleted
NCHRP 01-28Laboratory Determination of Resilient Modulus for Flexible Pavement DesignCompleted
NCHRP 01-28AHarmonized Test Methods for Laboratory Determination of Resilient Modulus for Flexible Pavement DesignCompleted
NCHRP 01-29Improved Surface Drainage of PavementsCompleted
NCHRP 01-30Support Under Portland Cement Concrete PavementsCompleted
NCHRP 01-31Smoothness Specifications for PavementsCompleted
NCHRP 01-32Systems for Design of Highway PavementsCompleted
NCHRP 01-33Methodology to Improve Pavement-Investment DecisionsCompleted
NCHRP 01-34Performance of Subsurface Pavement DrainageCompleted
NCHRP 01-34AContributions of Pavement Structural Layers to Rutting of Flexible PavementsCompleted
NCHRP 01-34BEffectiveness of Subsurface Drainage for HMA and PCC PavementsCompleted
NCHRP 01-34CEffects of Subsurface Drainage on Performance of Asphalt and Concrete PavementsCompleted
NCHRP 01-34DEffects of Subsurface Drainage on Performance of Asphalt and Concrete Pavements: Further Evaluation and Analysis of LTPP SPS-1 and SPS-2 Field SectionsCompleted
NCHRP 01-35AGuide for Pavement ManagementCompleted
NCHRP 01-36Determination of Pavement Damage from Super-Single and Singled-Out Dual Truck TiresCompleted
NCHRP 01-37Development of the 2002 Guide for the Design of New and Rehabilitated Pavement StructuresCompleted
NCHRP 01-37ADevelopment of the 2002 Guide for the Design of New and Rehabilitated Pavement Structures: Phase IICompleted
NCHRP 01-37A(01)Distribution Plan for the Recommended Mechanistic-Empirical Pavement Guide and SoftwareCompleted
NCHRP 01-38Guide on Pavement Rehabilitation StrategiesCompleted
NCHRP 01-39Traffic Data Collection, Analysis, and Forecasting for Mechanistic Pavement DesignCompleted
NCHRP 01-40Facilitating the Implementation of the Guide for the Design of New and Rehabilitated Pavement StructuresActiveVersion 1.0 (June 2007) of the Mechanistic-Empirical Pavement Design Guide software is available online for evaluation at http://www.trb.org/mepdg/. To report a software error, go to http://www.ara-tracker.com.
NCHRP 01-40AIndependent Review of the Recommended Mechanistic-Empirical Design Guide and SoftwareCompleted
NCHRP 01-40BUser Manual and Local Calibration Guide for the Mechanistic-Empirical Pavement Design Guide and SoftwareActiveA final NCHRP version of the Interim Mechanistic-Empirical Pavement Design Guide Manual of Practice was submitted to AASHTO in August 2007. Submission of the complete Local Calibration Guide is planned for early 2009.
NCHRP 01-40D(01)Technical Assistance to NCHRP and NCHRP Project 1-40A: Versions 0.9 and 1.0 of the M-E Pavement Design SoftwareActive
NCHRP 01-40D(02)Technical Assistance to NCHRP and NCHRP Project 1-40A: Versions 0.9 and 1.0 of the M-E Pavement Design SoftwareActive
NCHRP 01-41Models for Predicting Reflection Cracking of Hot-Mix Asphalt OverlaysActive
NCHRP 01-42Top-Down Fatigue Cracking of Hot-Mix Asphalt Layers - Phase ICompleted
NCHRP 01-42AModels for Predicting Top-Down Cracking of Hot-Mix Asphalt LayersActive
NCHRP 01-43Guide for Pavement FrictionActive
NCHRP 01-44Measuring Tire-Pavement Noise at the SourceCompleted
NCHRP 01-45Models for Estimating the Effects of Pavement Condition on Vehicle Operating CostsActive
NCHRP 01-46Development of an AASHTO Pavement HandbookAnticipatedIn development
NCHRP 01-47Sensitivity Evaluation of MEPDG Performance PredictionPending
NCHRP 02-14Public/Private Partnerships for Financing Highway ImprovementsCompleted
NCHRP 02-15Identifying Measuring, and Evaluating the Benefits of Safety Roadside Rest AreasCompleted
NCHRP 02-16Relationships Between Vehicle Configurations and Highway DesignCompleted
NCHRP 02-17(1)Methodologies for Evaluating the Effects of Transportation Policies on the EconomyCompleted
NCHRP 02-17(2)Workshop on Research Needs in Transportation and Economic DevelopmentCompleted
NCHRP 02-17(3)Macroeconomic Analysis of the Linkages Between Transportation Investments and Economic PerformanceCompleted
NCHRP 02-17(3)AUpdate and Enhancement of Dataset for Macroeconomic Analysis of Transportation Investments and Economic PerformanceCompleted
NCHRP 02-17(4)Measuring the Relationship Between Freight Transportation Services and Industry ProductivityCompleted
NCHRP 02-17(5)Impact of Urban Congestion on BusinessCompleted
NCHRP 02-17(6)Tourism Travel Contributions to Economic DevelopmentCompleted
NCHRP 02-18Research Strategies for Improving Highway User Cost-Estimating MethodologiesCompleted
NCHRP 02-18(2)Valuation of Travel-Time Savings and Predictability in Congested Conditions for Highway User-Cost EstimationCompleted
NCHRP 02-18(3)Development of an Innovative Highway User-Cost Estimation ProcedureCompleted
NCHRP 02-18(4)Development and Demonstration of StratBENCOST ProcedureCompleted
NCHRP 02-19Research on the Relationship Between Economic Development and Transportation InvestmentCompleted
NCHRP 02-19(2)Guidance on Using Existing Analytic Tools for Evaluating Transportation InvestmentsCompleted
NCHRP 02-20Economic Trends and Multimodal Transportation RequirementsCompleted
NCHRP 02-21Economic Implications of CongestionCompleted
NCHRP 02-22Needs in Communicating the Economic Impacts of Transportation InvestmentCompleted
NCHRP 02-22(2)Case Studies on Communicating the Economic Benefits of Transportation InvestmentsCompleted
NCHRP 02-23Development of an Update to the 1977 AASHTO RedbookCompleted
NCHRP 03-28Effects of Quality of Traffic Signal Progression on DelayCompleted
NCHRP 03-32Temporary Pavement Markings for Work ZonesCompleted
NCHRP 03-33Capacity and Level-of-Service Procedures for Multilane Rural and Suburban HighwaysCompleted
NCHRP 03-35Speed-Change LanesCompleted
NCHRP 03-36Development of a Low-Cost Bridge Weigh-In-Motion SystemCompleted
NCHRP 03-37Capacity and Level of Service at Ramp-Freeway JunctionsCompleted
NCHRP 03-37(2)Capacity and Level of Service at Ramp-Freeway Junctions (Phase II)Completed
NCHRP 03-38(1)Assessment of Advanced Technologies for Relieving Urban Traffic CongestionCompleted
NCHRP 03-38(1)AA Study to Assess Advanced Vehicle and Highway TechnologiesCompleted
NCHRP 03-38(2)Travel Characteristics of Large-Scale Suburban Activity CentersCompleted
NCHRP 03-38(3)Traffic Adaptive Control (Phase 1)---Critical Intersection Control Strategies; (Phase 2)---OPAC Control StrategiesCompleted
NCHRP 03-38(4)Traffic Signal Control for Saturated ConditionsCompleted
NCHRP 03-38(5)Effective Utilization of Street WidthCompleted
NCHRP 03-38(6)Cost Sharing for Transportation Improvements Near Major Suburban Employment CentersCompleted
NCHRP 03-38(7)Access Management Policies and Guidelines for Activity CentersCompleted
NCHRP 03-39Evaluation and Calibration Procedures for Weigh-In-Motion SystemsCompleted
NCHRP 03-39(2)On-Site Evaluation and Calibration Procedures for Weigh-In-Motion SystemsCompleted
NCHRP 03-40Single Point Urban Interchange Design and Operations AnalysisCompleted
NCHRP 03-41Procedure for Determining Work Zone Speed LimitsCompleted
NCHRP 03-41(2)Effectiveness and Implementability of Procedures for Work Zone Speed LimitsCompleted
NCHRP 03-42Determination of Stopping Sight DistancesCompleted
NCHRP 03-43Use of Shoulders and Narrow Lanes to Increase Freeway CapacityCompleted
NCHRP 03-44Improved Traffic Control Device Design and Placement to Aid the Older DriverCompleted
NCHRP 03-45Speed-Flow Relationships for Basic Freeway SegmentsCompleted
NCHRP 03-46Capacity and Level of Service at Unsignalized IntersectionsCompleted
NCHRP 03-47Capacity Analysis of Interchange Ramp TerminalsCompleted
NCHRP 03-48Capacity Analysis for Actuated IntersectionsCompleted
NCHRP 03-49Capacity and Operational Effects of Midblock Left-Turn LanesCompleted
NCHRP 03-50Driver Information OverloadCompleted
NCHRP 03-50(2)Additional Investigations on Driver Information OverloadCompleted
NCHRP 03-51Communications Mediums for Signal, IVHS, and Freeway Surveillance SystemsCompleted
NCHRP 03-52Impacts of Access-Management TechniquesCompleted
NCHRP 03-52AImpacts of Access-Management TechniquesCompleted
NCHRP 03-53Development of a HOV Systems ManualCompleted
NCHRP 03-54Uniform Traffic Signal Displays for Protected/Permissive Left Turn ControlCompleted
NCHRP 03-54(2)Evaluation of Traffic Signal Displays for Protected/Permissive Left Turn ControlCompleted
NCHRP 03-55A Highway Capacity Manual for the Year 2000Completed
NCHRP 03-55(2)Techniques to Estimate Speeds and Service Volumes for Planning ApplicationsCompleted
NCHRP 03-55(2)APlanning Applications for the Year 2000 Highway Capacity ManualCompleted
NCHRP 03-55(3)Capacity and Quality of Service for Two-Lane HighwaysCompleted
NCHRP 03-55(4)Performance Measures and Levels of Service in the Year 2000 Highway Capacity ManualCompleted
NCHRP 03-55(5)Capacity and Quality of Service of Weaving AreasCompleted
NCHRP 03-55(6)Production of the Year 2000 Highway Capacity ManualCompleted
NCHRP 03-56Systemwide Impact of Safety and Traffic Operation Design Decisions for Resurfacing, Restoration, or Rehabilitation (RRR) ProjectsCompleted
NCHRP 03-57Recommended Traffic-Control Devices for Railroad-Highway Grade CrossingsCompleted
NCHRP 03-58Assessing Traffic Control Signal Installations Using Capacity Analysis and SimulationCompleted
NCHRP 03-59Assessment of Variable Speed Limit Implementation IssuesCompleted
NCHRP 03-60Capacity and Quality of Service of Interchange Ramp TerminalsCompletedResults incorporated into the HCM
NCHRP 03-60AValidation and Enhancement of the Highway Capacity Manual’s Interchange Ramp Terminal MethodologyActive
NCHRP 03-61Communicating Changes in Horizontal AlignmentCompleted
NCHRP 03-62Guidelines for Accessible Pedestrian SignalsActive
NCHRP 03-63Assessment of Sharing Information Between Public Safety and Transportation Agencies for Traffic-Incident ManagementCompleted
NCHRP 03-64Highway Capacity Manual Applications GuideCompleted
NCHRP 03-65Applying Roundabouts in the United StatesActive
NCHRP 03-65AUpdate of 'Roundabouts: An Informational Guide'Active
NCHRP 03-66Traffic Signal State Transition Logic Using Enhanced Sensor InformationActive
NCHRP 03-67Expert System for Recommending Speed Limits in Speed ZonesCompleted
NCHRP 03-68Guide to Effective Freeway Performance MeasurementCompleted
NCHRP 03-69Design of Construction Work Zones on High-Speed HighwaysCompleted
NCHRP 03-70Multimodal Level of Service Analysis For Urban StreetsActive
NCHRP 03-71Innovative Pedestrian Treatments at Unsignalized CrossingsCompleted
NCHRP 03-72Lane Widths, Channelized Right Turns, and Right-Turn Deceleration Lanes in Urban and Suburban AreasActive
NCHRP 03-73Separation of Vehicles - CMV Only LanesActive
NCHRP 03-74Guidelines for Selection of Speed Reduction Treatments at High-Speed IntersectionsCompleted
NCHRP 03-75Analysis of Freeway Weaving SectionsActive
NCHRP 03-76AHighway Traffic Signal Warrant For Intersections Near Highway-Rail Grade CrossingsCompletedResults incorporated into the MUTCD
NCHRP 03-76BLow-Cost Active Warning Systems for Highway-Rail Grade CrossingsActive
NCHRP 03-77Guide to Contracting Intelligent Transportation System ProjectsFinal
NCHRP 03-78Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision DisabilitiesCompleted
NCHRP 03-78ACrossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision DisabilitiesActive
NCHRP 03-79Measuring and Predicting the Performance of Automobile Traffic on Urban StreetsActive
NCHRP 03-79AArterial Performance MeasuresActive
NCHRP 03-80Traffic Enforcement Strategies for Work ZonesActive
NCHRP 03-81Strategies for Integrated Operation of Freeway and Arterial CorridorsActive
NCHRP 03-82Default Values for Capacity and Quality of Service AnalysesCompletedPublished as NCHRP Report 599
NCHRP 03-83Low-Cost Improvements for Recurring Freeway BottlenecksActive
NCHRP 03-84Guide for Multistate Transportation Operations ProgramsCompletedReport delivered to AASHTO for publication.
NCHRP 03-85Guidance for the Use of Alternative Traffic Analysis Tools in Highway Capacity AnalysesActive
NCHRP 03-86Traffic Operations Management and Planning ProcessAnticipated
NCHRP 03-87Proactive Ramp Management Under the Threat of Freeway-Flow BreakdownActive
NCHRP 03-88Guidelines for Ramp and Interchange SpacingActiveWork has been initiated. The interim report is expected in January 2009.
NCHRP 03-89Design Guidance for Channelized Right-Turn LanesActive
NCHRP 03-90Operation of Traffic Signal Systems in Oversaturated ConditionsActive
NCHRP 03-91Left-Turn Accommodations at Unsignalized IntersectionsActive
NCHRP 03-92Production of the Year 2010 Highway Capacity ManualActive
NCHRP 03-93Automated Enforcement for Speeding and Red Light RunningActiveSTATUS - The contractor is conducting a survey to study current and past programs.
NCHRP 03-94Transportation Systems Operations and Management GuidePendingContract negotiations are underway.
NCHRP 03-95Guidelines for Timing Yellow and All-Red Intervals at Signalized IntersectionsPending
NCHRP 03-96Analysis of Managed Lanes on Freeway FacilitiesPendingContract negotiations are underway.
NCHRP 03-97Traffic Signal Analysis with Varying Demands and CapacitiesPendingContract under negotiation
NCHRP 03-98Guidelines on the Use of Auxiliary Through Lanes at Signalized IntersectionsPending
NCHRP 03-99Development and Application of Access Management GuidelinesPending
NCHRP 04-15Corrosion Protection of Prestressing Systems in Concrete BridgesCompleted
NCHRP 04-16Cost and Service Life of Pavement MarkingsCompleted
NCHRP 04-18Design and Evaluation of Large Stone MixturesCompleted
NCHRP 04-19Aggregate Tests Related to Asphalt Concrete Performance in PavementsCompleted
NCHRP 04-19(2)Validation of Performance-Related Tests of Aggregates for Use in Hot-Mix Asphalt PavementsCompleted
NCHRP 04-20Aggregate Tests Related to Performance of Portland Cement ConcreteCompleted
NCHRP 04-20AState of the Art Report and Plan for Research on Aggregates Tests Related to Performance of Portland Cement Concrete PavementsCompleted
NCHRP 04-20BAggregate Tests Related to Performance of Portland Cement Concrete PavementsCompleted
NCHRP 04-20CAggregate Tests Related to Performance of Portland Cement Concrete Pavements: State of the KnowledgeCompleted
NCHRP 04-21Appropriate Use of Waste and Recycled Materials in the Transportation IndustryCompleted
NCHRP 04-22Pavement-Marking Materials: Health, Environmental, and Performance AssessmentCompleted
NCHRP 04-23Performance-Related Tests of Aggregates for Use in Unbound Pavement LayersCompleted
NCHRP 04-24HDPE Pipe Material Specifications and Design RequirementsCompleted
NCHRP 04-25Implementation Plan for Automating Highway-Materials TestingCompleted
NCHRP 04-26Thermoplastic Drainage Pipe, Design and TestingCompletedThe final report is planned for publication as an NCHRP Report in early 2009.
NCHRP 04-27Application of Fiber Reinforced Polymer (FRP) Composites to the Highway Infrastructure: Strategic PlanCompleted
NCHRP 04-28Feasibility Study for an All-White Pavement Marking SystemCompleted
NCHRP 04-29Selection of Materials to Optimize Sign PerformanceCompleted
NCHRP 04-30Test Methods for Characterizing Aggregate Shape, Texture, and AngularityCompleted
NCHRP 04-30ATest Methods for Characterizing Aggregate Shape, Texture, and AngularityCompleted
NCHRP 04-31Tests of Recycled Aggregates for Use in Unbound Pavement LayersCompleted
NCHRP 04-32Performance and Quality Control of Corrugated Pipe Manufactured with Recycled Polyethylene ContentActiveWork on Phase II is in its concluding stage. Submission of the draft final report is expected by the end of November 2008.
NCHRP 04-33Procedures for Testing and Evaluating Detectable Warning SystemsActive
NCHRP 04-34Application of LADAR in the Analysis of Aggregate CharacteristicsActive
NCHRP 04-35Improved Test Methods for Specific Gravity and Absorption of Coarse and Fine AggregateActiveThe Phase I interim report and Phase II work plan were submitted and will be reviewed by the panel at its meeting on 1 October 2008.
NCHRP 04-36Characterization of Cementitiously Stabilized Layers for Use in Pavement Design and AnalysisPending
NCHRP 04-37Long-Term Performance of Epoxy Adhesive Anchor SystemsPending
NCHRP 04-38Recommended Laboratory Test for Predicting the Initial Retroreflectivity of Pavement Markings from Glass Bead QualityPending
NCHRP 05-10A Mobile System for Measuring Retroreflectance of Traffic SignsCompleted
NCHRP 05-11Implementation Strategies for Sign Retroreflectivity StandardsCompleted
NCHRP 05-12Requirements for Application of Light Emitting Diodes (LEDs) to Traffic Control SignalsCompleted
NCHRP 05-13Illumination Guidelines for Nighttime Highway WorkCompleted
NCHRP 05-13(2)Illumination Guidelines for Nighttime Highway WorkCompleted
NCHRP 05-14Advance Warning Arrow Panel VisibilityCompleted
NCHRP 05-15Visibility Performance Requirements for Vehicular Traffic SignalsCompleted
NCHRP 05-16National Calibration Standards for Measuring RetroreflectivityCompleted
NCHRP 05-17Safety Evaluation of Permanent Raised Pavement MarkersCompleted
NCHRP 05-18Color Effectiveness of Yellow Pavement Marking MaterialsCompleted
NCHRP 05-19Guidelines for Roadway Lighting Based on Safety Benefits and CostsActiveThe interim report has been reviewed and accepted by the project panel. The preliminary draft final report is expected in October 2008.
NCHRP 06-12Improved Visibility for Snow Plowing OperationsCompleted
NCHRP 06-13Guidelines for Snow and Ice Control Materials and MethodsCompleted
NCHRP 06-14Feasibility of Using Friction Indicators to Improve Winter Maintenance Operations and MobilityCompleted
NCHRP 06-15Testing and Calibration Methods for RWIS SensorsCompleted
NCHRP 06-16Guidelines for the Selection of Snow and Ice Control Materials To Mitigate Environmental ImpactsCompleted
NCHRP 06-17Performance Measures for Snow and Ice Control OperationsCompleted
NCHRP 07-12Microcomputer Evaluation of Highway User BenefitsCompleted
NCHRP 07-12(2)Metrication and Enhancement of MicroBENCOST Software PackageCompleted
NCHRP 07-13Quantifying CongestionCompleted
NCHRP 07-14Guidelines for Analysis of Investments in Bicycle FacilitiesCompleted
NCHRP 07-15Cost-Effective Measures and Planning Procedures for Travel Time, Delay, and ReliabilityCompleted
NCHRP 07-16Recommended Revisions to the AASHTO Guidelines for Traffic Data ProgramsFinal
NCHRP 08-24AForecasting the Basic Inputs to Transportation Planning at the Zonal LevelCompleted
NCHRP 08-28Strategic Planning and Management for Transportation AgenciesCompleted
NCHRP 08-29Travel Estimation Techniques for Urban PlanningCompleted
NCHRP 08-29(2)Travel Estimation Techniques for Urban PlanningCompleted
NCHRP 08-30Characteristics and Changes in Freight Transportation DemandCompleted
NCHRP 08-30AFreight Capacity for the Next CenturyCompleted
NCHRP 08-31ALong-Term Availability of Multimodal Corridor CapacityCompleted
NCHRP 08-32Workshop on Multimodal Transportation Planning Research NeedsCompleted
NCHRP 08-32(1)Innovative Practices for Multimodal Transportation Planning for Freight and PassengersCompleted
NCHRP 08-32(2)Multimodal Transportation: Development of a Performance-Based Planning ProcessCompleted
NCHRP 08-32(2)AMultimodal Transportation: Development of a Performance-Based Planning ProcessCompleted
NCHRP 08-32(3)Integration of Land-Use Planning with Multimodal Transportation PlanningCompleted
NCHRP 08-32(4)Developing and Maintaining Partnerships for Multimodal Transportation PlanningCompleted
NCHRP 08-32(5)Multimodal Transportation Planning DataCompleted
NCHRP 08-33Quantifying Air-Quality and Other Benefits and Costs of Transportation Control MeasuresCompleted
NCHRP 08-34Major Investment Studies: Development of a Practitioner's Guidebook for Effective Study Design, Management, and ImplementationCompleted
NCHRP 08-35Incorporating ITS into the Transportation Planning ProcessActive
NCHRP 08-36Research for the AASHTO Standing Committee on PlanningActive
NCHRP 08-36/Task 01Parking Modeling ProceduresCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 02Incorporating System Operations and Management Practices in Transportation PlanningCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 03Management of Institutional Changes in State Transportation Planning Processes and ProgramsCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 04The Use of Expert Panels in Analyzing Transportation and Land Use AlternativesCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 05Incorporating Market Research Techniques into the Transportation Planning ProcessCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 06Product Delivery of New and Improved Travel Forecasting ProceduresCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 07Development of a Multimodal Tradeoffs Methodology for Use in Statewide Transportation PlanningCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 07(02)Development of a Multimodal Tradeoffs Methodology for Use in Statewide Transportation PlanningCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 08Workshop on Transportation Performance MeasuresCompletedCompleted---Published as TRB Conference Proceedings 26
NCHRP 08-36/Task 09Defining and Identifying Probable Non-Attainment Areas for PM2.5CompletedCompleted---Final report sent to AASHTO; see Project 25-17
NCHRP 08-36/Task 10Global Climate Change and Transportation: Coming to TermsCompletedCompleted---Final report published by Eno Foundation and sent to AASHTO
NCHRP 08-36/Task 11Technical Methods to Support Analysis of Environmental-Justice IssuesCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 12AAnalysis of the Factors Affecting Future Transportation Environment and their Implications for State DOTsCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 12BAnalysis of the Factors Affecting Future Transportation Environment and their Implications for State DOTsCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 13National Conference on Transportation and Economic DevelopmentCompletedCompleted---Published as TRB Circular E-C050
NCHRP 08-36/Task 14Consultation Between State DOTs and Local Elected Officials in Non-Metropolitan AreasCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 15Conference on Transportation and the Environment for the 21st CenturyCompletedCompleted---Published as TRB Circular E-C028
NCHRP 08-36/Task 16Assessment of Proposed Planning and National Environmental Policy Act RegulationsCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 17Two-Way Education Process with a New CEO on Transportation PlanningCompletedTask cancelled
NCHRP 08-36/Task 18Incorporating Safety into the Transportation Planning ProcessCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 19Transportation Environmental Research Needs ConferenceCompletedCompleted---Published as TRB Conference Proceedings 28
NCHRP 08-36/Task 20Conformity Problems Caused by the Mismatch in SIP / Transportation Plan TimeframeCompletedCompleted---Final report sent to AASHTO; $25K from Project 20-7/Task 141
NCHRP 08-36/Task 21Expediting the Transportation Planning Process to Meet Fast Paced Customer RequirementsCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 22Demonstrating the Positive Impacts of Transportation Investments on Economic, Social, Environmental, Community, and Quality of Life IssuesCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 23Review of the Potential Feasibility of Using Alternative Revenue Sources to Fund Future State Transportation NeedsCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 24Investment Requirements Scenarios DevelopmentCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 25Improved Geographic Clarity in Reporting of Road System ExtentCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 26Surface Transportation Safety and InvestmentCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 27Interstate Interchange ReviewCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 28Rural Conformity: A Survey of PracticeCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 29Development of a Multimodal Tradeoffs Methodology for Use in Statewide Transportation Planning: Application of the FrameworkCompletedContracted as 08-36/Task 07(02); continuation of Project 08-36/Task 07
NCHRP 08-36/Task 30Workshop on Issues in Intermodal ConnectorsCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 31Elderly Issues in the Transportation Planning ProcessCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 32Tools, Techniques, and Methods in Rural Transportation PlanningCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 33Best Practices in Statewide Freight PlanningCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 34Incorporating Security into the Transportation Planning ProcessCompletedCompleted---Published as NCHRP Report 525, Volume 3
NCHRP 08-36/Task 35Evaluating State DOT's Planning Practices in Rural PlanningCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 36Continuation of NCHRP 8-36(6) TMIP SupportActiveFor contract purposes, this has been amended into the work plan of NCHRP Project 8-36, Task 6 and progress will be reported under that task.
NCHRP 08-36/Task 37A Retrospective on the Conditions and Performance ReportCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 38Supplemental Evaluation in Support of NCHRP 25-17CompletedCompleted---Results incorporated into NCHRP 25-17 final report
NCHRP 08-36/Task 39Forecasting Travel Time, Delay, and ReliabilityCompletedCompleted: For contract purposes, this task has been amended into NCHRP Project 7-15 and will be reported there.
NCHRP 08-36/Task 40National Site Visits on Transportation and GrowthCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 41Non-Response to Personal Travel Surveys (support for NCHRP 8-37)CompletedCompleted---Results incorporated into NCHRP 08-37 final report
NCHRP 08-36/Task 42MPO Redefinition and Evolving RolesCompletedCompleted--Final report sent to AASHTO
NCHRP 08-36/Task 43Return on Investment on Freight Rail Capacity ImprovementCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 44Multi-State MPOs: Approaches, Cases, and Institutional ArrangementsCompletedCompleted
NCHRP 08-36/Task 45Multi-State Corridor PlanningCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 46Synthesis of Where Data Groups are Organizationally Located in State DOTsCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 47Effective Organization of Performance MeasurementCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 48Guidance for Better Linking Systems Planning and the NEPA ProcessCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 49Synthesis of Metropilitan-Level Transportation Funding SourcesCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 50What is the Impact of an Aging Population on System Planning and Investment Policies?CompletedCompleted---Final report has been received
NCHRP 08-36/Task 51Information Design for Effective Decision Making and CommunicationCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 52Changes in Travel Behavior/Demand Due to Managed Lanes (HOV, HOT) Facility System ExpansionCompletedCompleted--Final report sent to AASHTO
NCHRP 08-36/Task 53Peer Review Capacity Building Partnership: Best Practices in Non-Traditional Performance Measures, Multimodal Goods Movement Tradeoffs, Safety, Reliability, and State FundingCompletedCompleted---Final reports sent to AASHTO
NCHRP 08-36/Task 54Census Data For Transportation PlanningCompletedCompleted---Papers posted to TRB Conference website and will be published in Conference Proceedings 12/30/2006
NCHRP 08-36/Task 55The Role of Collaboration in Freight Transportation ManagementCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 56Highway Construction Project Coordination to Minimize Traffic ImpactsCompletedCompleted---Final report sent to AASHTO
NCHRP 08-36/Task 57Institutional Needs in Safety PlanningCompletedCompleted
NCHRP 08-36/Task 58Best Practices for State and MPO NHS and STP ProgrammingCompletedCompleted
NCHRP 08-36/Task 59Transportation and HealthCompletedCompleted
NCHRP 08-36/Task 60State DOT Consideration of Infrastructure Development Potential PlanningCompletedCompleted
NCHRP 08-36/Task 61Monetary Valuation Per Dollar of Investment in Different Performance MeasuresCompletedCompleted
NCHRP 08-36/Task 62Best Practice Methodology for Calculating Return on Investment (ROI) for Transportation Programs and ProjectsCompletedCompleted - Final Report sent to AASHTO
NCHRP 08-36/Task 63Making NAICS (North American Industrial Classification System) Work for TransportationCompletedCompleted
NCHRP 08-36/Task 64Right of Way Methods and Tools to Control Project Cost EscalationCompletedCompleted--project canceled and funds combined with NCHRP Project 08-49, Procedures for Cost Estimation and Management for Highway Projects During Planning, Programming, and Reconstruction
NCHRP 08-36/Task 65Best Practices for Incorporating Commodity Flow Survey and Related Data into the MPO and Statewide Planning ProcessesActiveResearch in progress
NCHRP 08-36/Task 66Improved Methods for Assessing Social, Cultural, and economic Effects of Transportation ProjectsCompletedCompleted--Final report sent to AASHTO
NCHRP 08-36/Task 67Best Practices in Using Programmatic Investment Strategies in Statewide Transportation PlansCompletedCompleted--Final report sent to AASHTO
NCHRP 08-36/Task 68Implications of New 8-Hour Control Strategy Development on Transportation Programs, Policies, and ProjectsCompletedCompleted
NCHRP 08-36/Task 70Scoping Study for Statewide Travel Forecasting National ModelCompletedResearch in Progress
NCHRP 08-36/Task 71Disclosure Avoidance Techniques to Improve ACS Data Availability ActiveResearch in progress
NCHRP 08-36/Task 72Implementing Project Cost Estimation and Management Process ImprovementsCompletedCompleted--Final report sent to AASHTO
NCHRP 08-36/Task 73Adding Resilience to the Freight System in Statewide and Metropolitan Transportation Plans: Developing a Conceptual ApproachActiveReserach in progress
NCHRP 08-36/Task 74Customer Research Practices and Applications in TransportationCompletedCompleted--Final report sent to AASHTO
NCHRP 08-36/Task 75Research FindersCompletedCompleted--Final report sent to AASHTO
NCHRP 08-36/Task 78Small Community Research and Peer ExchangeActiveResearch in Progress
NCHRP 08-36/Task 79Scoping Study for a Freight Data Exchange NetworkActiveResearch in Progress
NCHRP 08-36/Task 80Synthesis of State Practices in Developing Linear Referencing SystemsActiveResearch in Progress
NCHRP 08-36/Task 81Enhancing the American Community Survey Data as a Source for Home-to-Work FlowsActiveResearch in Progress
NCHRP 08-36/Task 83Transportation Planning Partnerships to Enhance National Parks and Gateway CommunitiesPending
NCHRP 08-36/Task 84Asset Management of Environmental Mitigation FeaturesPending
NCHRP 08-36/Task 85Congestion Pricing and Investment RequirementsPending
NCHRP 08-36/Task 86Corridor Approaches to Integrating Land Transportation and Land UsePending
NCHRP 08-36BResearch for the AASHTO Standing Committee on PlanningPending
NCHRP 08-37Standardized Procedures for Personal Travel SurveysCompleted
NCHRP 08-38Consideration of Environmental Factors in Transportation Systems PlanningCompleted
NCHRP 08-39Financing and Improving Land Access to U.S. Cargo HubsCompleted
NCHRP 08-40Evaluating Cultural Resource Significance Using Information Technology (IT)Completed
NCHRP 08-40(02)Evaluating Cultural Resource Significance-Implementation ToolsCompleted
NCHRP 08-41Effective Methods for Environmental Justice AssessmentCompleted
NCHRP 08-42Rail-Freight Solutions to Roadway CongestionFinal
NCHRP 08-43Methods for Forecasting Statewide Freight Movements and Related Performance MeasuresFinal
NCHRP 08-44Incorporating Safety into Long-Range Transportation PlanningCompleted
NCHRP 08-44(02)Transportation Safety Planning: Forecasting the Safety Impacts of Socio-Demographic Changes and Safety InvestmentsActive
NCHRP 08-45A New Vision of Mobility: Guidance to Foster Collaborative Multimodal Decision MakingCompleted
NCHRP 08-46A Guide for Including Access Management in Transportation PlansCompleted
NCHRP 08-47Guidebook for Freight Policy, Planning, and Programming in Small and Mid-Sized Metropolitan AreasActive
NCHRP 08-48Using American Community Survey Data for Transportation PlanningCompleted
NCHRP 08-49Procedures for Cost Estimation and Management for Highway Projects During Planning, Programming, and PreconstructionActive
NCHRP 08-50Factors that Support the Planning-Programming LinkageActive
NCHRP 08-51Enhancing Internal Trip Capture Estimation for Mixed-Use DevelopmentsActive
NCHRP 08-52Best Practices to Enhance the Transportation/Land-Use Connection in Rural AmericaCompleted
NCHRP 08-53Integrating Freight into Transportation Planning and Project-Selection ProcessesFinalPublished as NCHRP Report 594
NCHRP 08-54Identification of Liability-Related Impediments to Sharing 409 Safety Data Among Transportation Agencies, and Synthesis of Best PracticesFinal
NCHRP 08-55Integrating Geo-Spatial Technologies into the Right-of-Way Data-Management ProcessCompleted
NCHRP 08-55ADeveloping a Logical Model for a Geo-Spatial Right-Of-Way Land Management SystemActiveThe project panel will review progress on Phase II at its meeting on 17 November 2008.
NCHRP 08-56Truck Noise-Source MappingActiveThe interim report has been reviewed and accepted by the project panel. The preliminary draft final report is expected in November 2008.
NCHRP 08-57Improved Framework and Tools for Highway Pricing DecisionsActive
NCHRP 08-58Development of a Multimodal Statewide Corridor Planning GuidebookActive
NCHRP 08-59Transportation Cost Implications of New DevelopmentActiveThe interim report has been accepted and the preliminary draft final report is due in April 2009.
NCHRP 08-60Guidebook on Risk Analysis Tools and Management Practices to Control Transportation Project CostActive
NCHRP 08-61Travel Demand Forecasting: Parameters and TechniquesActive
NCHRP 08-62Transportation Performance Management Programs--Insight from PractitionersActive
NCHRP 08-63Review of Canadian Experience with Large Commercial Motor VehiclesActiveThe interim report has been received and accepted. The preliminary draft final report is expected in September 2008.
NCHRP 08-64A Guidebook on Improved Principles, Processes, and Methods for Shared-Use Passenger and Freight Rail CorridorsActive
NCHRP 08-65Guidebook for Successful Communication, Cooperation, and Coordination Strategies Between Transportation Agencies and Tribal Communities ActiveInitial tasks are underway. An interim report is expected in December 2008.
NCHRP 08-66Trip-Generation Rates for Transportation Impact Analyses of Infill DevelopmentsActive
NCHRP 08-67Integrating Individual Transportation System-Level Performance Programs to Determine Network PerformanceActive
NCHRP 08-68Citizen’s Guide and Discipline-Specific Professionals’ Guide for Context-Sensitive Solutions in TransportationActive
NCHRP 08-69Supplement to the AASHTO Transportation Asset Management Guide: Volume 2 - A Focus on ImplementationActiveResearch in Progress
NCHRP 08-70Target-Setting Methods and Data Management To Support Performance-Based Resource Allocation by Transportation AgenciesActive
NCHRP 08-71Methodology for Estimating Life Expectancies of Highway AssetsPending
NCHRP 08-72Practical Approaches for Involving Traditionally Underserved Populations in Transportation DecisionmakingPending
NCHRP 08-73Road Pricing, Public Perceptions and Program DevelopmentPending
NCHRP 08-74Sustainability Performance Measures for State Departments of Transportation and Other Transportation AgenciesPending
NCHRP 08-75Guidelines for Evaluation and Performance Measurement of Congestion Pricing Projects Pending
NCHRP 08-76Institutionalizing Safety in Transportation Planning Processes: Techniques, Tactics and StrategiesPending
NCHRP 09-06(01)Asphalt-Aggregate Mixture Analysis System (AAMAS)Completed
NCHRP 09-07Field Procedures and Equipment to Implement SHRP Asphalt SpecificationsCompleted
NCHRP 09-08Designing Stone Matrix Asphalt MixturesCompleted
NCHRP 09-09Refinement of the Superpave Gyratory Compaction ProcedureCompleted
NCHRP 09-09(1)Verification of Gyration Levels in the Ndesign TableCompleted
NCHRP 09-10Superpave Protocols for Modified Asphalt BindersCompleted
NCHRP 09-11Segregation in Hot-Mix Asphalt PavementsCompleted
NCHRP 09-12Incorporation of Reclaimed Asphalt Pavement in the Superpave SystemCompleted
NCHRP 09-13Evaluation of Water Sensitivity TestsCompleted
NCHRP 09-14Investigation of the Restricted Zone in the Superpave Aggregate Gradation SpecificationCompleted
NCHRP 09-15Quality Characteristics and Test Methods for Use in Performance-Related Specifications of Hot-Mix Asphalt PavementsCompleted
NCHRP 09-16Relationship Between Superpave Gyratory Compaction Properties and Permanent Deformation of Pavements in ServiceCompleted
NCHRP 09-17Accelerated Laboratory Rutting Tests: Asphalt Pavement AnalyzerCompleted
NCHRP 09-18Field Shear Test for Hot Mix AsphaltCompleted
NCHRP 09-19Superpave Support and Performance Models ManagementCompleted
NCHRP 09-20Performance-Related Specifications for Hot-Mix Asphalt ConstructionCompleted
NCHRP 09-21Advisory Structure for Superpave Implementation and Related ResearchCompleted
NCHRP 09-22Beta Testing and Validation of HMA PRSActive
NCHRP 09-23Environmental Effects in Pavement Mix and Structural Design SystemsCompleted
NCHRP 09-25Requirements for Voids in Mineral Aggregate for Superpave MixturesCompleted
NCHRP 09-26Precision Statements for AASHTO T312 and other Laboratory Test MethodsCompleted
NCHRP 09-26AData Mining and Interlaboratory Studies to Prepare Precision Statements for AASHTO Standard Test MethodsActive
NCHRP 09-27Relationships of HMA In-Place Air Voids, Lift Thickness, and PermeabilityCompleted
NCHRP 09-29Simple Performance Tester for Superpave Mix DesignActivePhase VI is in progress. The final report for Phase V will be published as NCHRP Report 629 in early 2009.
NCHRP 09-30Experimental Plan for Calibration and Validation of HMA Performance Models for Mix and Structural DesignCompleted
NCHRP 09-30ACalibration of Rutting Models for HMA Structural and Mix DesignActive
NCHRP 09-31Air Void Requirements for Superpave Mix DesignCompleted
NCHRP 09-33A Mix Design Manual for Hot Mix AsphaltActive
NCHRP 09-34Improved Conditioning Procedure for Predicting the Moisture Susceptibility of HMA PavementsCompleted
NCHRP 09-35Aggregate Properties and Their Relationship to the Performance of Superpave-Designed HMA: A Critical ReviewCompleted
NCHRP 09-36Improved Procedure for Laboratory Aging of Asphalt Binders in PavementsActive
NCHRP 09-37Using Surface Energy Measurements To Select Materials for Asphalt PavementsCompleted
NCHRP 09-38Endurance Limit of Hot Mix Asphalt Mixtures to Prevent Fatigue Cracking in Flexible PavementsActiveAwaiting submission of a revision of the preliminary draft final report for panel review.
NCHRP 09-39Procedure for Determining Mixing and Compaction Temperatures of Asphalt Binders in Hot Mix AsphaltActiveAwaiting submission of the preliminary draft final report for panel review.
NCHRP 09-40Optimization of Tack Coat for HMA PlacementActive
NCHRP 09-41Performance and Maintenance of Permeable Friction CoursesActiveAwaiting submission of the revised final report.
NCHRP 09-42History of Superpave: Documenting the Research Program and Implementation ProcessActive
NCHRP 09-43Mix Design Practices for Warm Mix AsphaltActive
NCHRP 09-44Developing a Plan for Validating an Endurance Limit for HMA PavementsActive
NCHRP 09-44AValidating an Endurance Limit for HMA Pavements: Laboratory Experiment and Algorithm DevelopmentRFP
NCHRP 09-45Test Methods and Specification Criteria for Mineral Filler Used in HMAActive
NCHRP 09-46Improved Mix Design, Evaluation, and Materials Management Practices for Hot Mix Asphalt with High Reclaimed Asphalt Pavement ContentActive
NCHRP 09-47Engineering Properties, Emissions, and Field Performance of Warm Mix Asphalt TechnologiesActive
NCHRP 09-47AProperties and Performance of Warm Mix Asphalt Technologies (Re-advertisement of NCHRP Project 9-47)RFP
NCHRP 09-48Field versus Laboratory Volumetrics and Mechanical PropertiesPending
NCHRP 10-13Ultrasonic Measurement of Weld Flaw SizeCompleted
NCHRP 10-17Use of Antistripping Additives in Asphaltic Concrete MixturesCompleted
NCHRP 10-20Elastomeric Bearings Design, Construction, and MaterialsCompleted
NCHRP 10-20AHigh-Load, Multi-Rotational Bridge Bearings: Design, Materials, and ConstructionCompleted
NCHRP 10-22The Performance of Weathering Steel in BridgesCompleted
NCHRP 10-25AInstantaneous Determination of Water-Cement Ratio in Fresh ConcreteCompleted
NCHRP 10-26Performance-Related Specifications for Hot-Mix Asphaltic ConcreteCompleted
NCHRP 10-27Determination of Asphaltic Concrete Pavement Structural Properties by Nondestructive TestingCompleted
NCHRP 10-29Anchorage Zone Reinforcement for Post-Tensioned Concrete GirdersCompleted
NCHRP 10-30(3)Nondestructive Methods for Field Inspection of Embedded or Encased High Strength Steel Rods and CablesCompleted
NCHRP 10-31Acceptance Criteria for Steel Bridge WeldsCompleted
NCHRP 10-32ADurability Testing of High-Strength Concrete Containing High-Range Water-Reducing AdmixturesCompleted
NCHRP 10-33Potential Benefits of Geosynthetics in Flexible Pavement SystemsCompleted
NCHRP 10-34Transient Protection, Grounding, and Shielding of Electronic Traffic Control EquipmentCompleted
NCHRP 10-35Fatigue Behavior of Welded and Mechanical Splices in Reinforcing SteelCompleted
NCHRP 10-36Evaluation of Weldments Incorporating Backing MaterialsCompleted
NCHRP 10-37Performance of Epoxy-Coated Reinforcing Steel in Highway BridgesCompleted
NCHRP 10-37APerformance of Epoxy-Coated Reinforcing Steel--Laboratory TestingCompleted
NCHRP 10-37BA Protocol for the Evaluation of Existing Bridges Containing Epoxy-Coated Reinforcing SteelCompleted
NCHRP 10-37CRepair and Rehabilitation of Bridge Components Containing Epoxy-Coated ReinforcementCompleted
NCHRP 10-38Fatigue-Resistant Design of Cantilevered Signal, Sign, and Light SupportsCompleted
NCHRP 10-38(2)Fatigue-Resistant Design of Cantilevered Signal, Sign, and Light Supports Completed
NCHRP 10-39Construction Testing and Inspection LevelsCompleted
NCHRP 10-39ATesting and Inspection Levels for Hot-Mix Asphaltic Concrete OverlaysCompleted
NCHRP 10-40Plasma Arc Cutting of Bridge SteelsCompleted
NCHRP 10-41Evaluation of Unbonded Portland Cement Concrete OverlaysCompleted
NCHRP 10-42Constructibility Review Process for Transportation FacilitiesCompleted
NCHRP 10-43Movable Bridge Inspection, Evaluation, and MaintenanceCompleted
NCHRP 10-44Nondestructive Testing to Determine Insitu Material Properties of Pavement LayersCompleted
NCHRP 10-44ADetermination of Insitu Material Properties of Asphalt Concrete Pavement LayersCompleted
NCHRP 10-45Procedures for Evaluating Corrosion-Inhibiting Admixtures for Structural ConcreteCompleted
NCHRP 10-46Corrosion of Steel Piling in Nonmarine ApplicationsCompleted
NCHRP 10-47Guidelines for Longitudinal Pavement Profile MeasurementCompleted
NCHRP 10-48Assessing Pavement Layer Condition Using Deflection DataCompleted
NCHRP 10-49Improved Contracting Methods for Highway Construction ProjectsCompleted
NCHRP 10-50Strategies for Rehabilitating Rigid Pavements Subjected to High-Traffic Volumes Completed
NCHRP 10-50AGuidelines for Selecting Strategies for Rehabilitating Rigid Pavements Subjected to High-Traffic VolumesCompleted
NCHRP 10-51Performance-Related Specifications for Elastomeric Bridge BearingsCompleted
NCHRP 10-52Performance Tests for Modular Bridge JointsCompleted
NCHRP 10-53Condition Evaluation of Prestressed Steel Strands in Concrete BridgesCompleted
NCHRP 10-54Quality-Based Performance Rating of Contractors for Prequalification and Bidding PurposesCompleted
NCHRP 10-55Fiber Reinforced Polymer Composites for Concrete Bridge Deck Reinforcement Completed
NCHRP 10-56Accelerated Pavement Testing: Data GuidelinesCompleted
NCHRP 10-57Structural Safety Evaluation Guidelines for Suspension Bridge Parallel-Wire CablesCompleted
NCHRP 10-58Construction Engineering and Management Research ProgramCompleted
NCHRP 10-58(01)Time-Related Incentive and Disincentive Provisions in Highway Construction ContractsActiveSTATUS - This project is in the final stages of data analysis for the final report.
NCHRP 10-58(02)Using Contractor-Performed Tests in Quality AssuranceCompletedNCHRP Research Results Digest 323: Using the Results of Contractor-Performed Tests in Quality Assurance
NCHRP 10-59AConstruction Specifications for Bonded Repair and Retrofit of Concrete Structures Using FRP CompositesCompleted
NCHRP 10-60Avoiding Delays in Constructing Highway Projects (CANCELED)Completed
NCHRP 10-61Best-Value Procurement Methods for Highway Construction ProjectsCompletedNCHRP Report 561: Best-Value Procurement Methods for Highway Construction Projects
NCHRP 10-62Acceptance Tests for Surface Characteristics of Steel Strands in Pre-Stressed ConcreteCompleted
NCHRP 10-63Heat-Straightening Repair of Damaged Steel Bridge Girders: Fatigue and Fracture PerformanceCompleted